FEMA's Hazard Mitigation Assistance (HMA) grant programs provide funding to protect life and property from future natural disasters. The Flood Mitigation Assistance (FMA) grant program assists States, Tribal, Territorial and local governments reduce or eliminate claims under the National Flood Insurance Program (NFIP).
For FY 2019, $160 million was initially made available for FMA. On August 26, 2019, FEMA posted the Notice of Funding Opportunity (NOFO) on www.grants.gov to announce the availability of $160 million for FMA grants and the application period October 1, 2019 – January 31, 2019. On December 23, 2019, FEMA announced a revised FMA NOFO that amended the federal funding available from $160 million to $210 million based on identified recoveries from prior project underruns.
FEMA will fund the flood portion of mitigation planning subapplications consistent with 44CFR Part 201 up to $100,000 federal share per applicant with a maximum of $50,000 for state plans and $25,000 for local plans. In addition, applicants who were awarded FMA grant funds totaling at least $1 million in FY 2018 may receive technical assistance up to $50,000. The remaining funds will be awarded on a competitive basis for projects.
FY2019 Flood Mitigation Assistance Priorities
The agency’s priorities for projects for the FY 2019 FMA program are:
1. Community Flood Mitigation – Up to $70,000,000 available
Advance Assistance
FEMA will select the highest ranked eligible subapplication for Advance Assistance from each Applicant up to $200,000 federal share based on final prioritization score (see table below) for a maximum of $4,000,000.
Advanced Assistance can be used to develop mitigation strategies and obtain data to prioritize, select, and develop community flood hazard projects for future funding. FEMA will select subapplications that address flood risk on a community level based on final priority scoring criteria and that benefit communities with high participation and favorable standing in the NFIP. Consideration of Advanced Assistance early in the decision-making process can help facilitate the development of a viable project, as well as project implementation. There is no guarantee for future Hazard Mitigation Assistance project funding if Advanced Assistance is awarded.
Community Flood Mitigation Projects
FEMA will select the highest ranked eligible community flood mitigation subapplication from each Applicant up to $10,000,000 federal share based on final priority scoring criteria (see table below) and that benefit communities with high participation and favorable standing in the NFIP. Applicants are not required to apply for Advanced Assistance funding to be eligible to receive a project award.
Eligible activities include but are not limited:
- Infrastructure protective measures
- Localized flood control to protect critical facilities
- Floodwater storage and diversion
- Floodplain and stream restoration
- Water and sanitary sewer system protective measures
- Utility protective measures
- Stormwater management
- Aquifer storage and recovery
- Wetland restoration/creation
Subapplications submitted for either the community flood mitigation Advance Assistance or project funding will be scored and ranked based on the following priorities:
Priority | Description | Total Points |
---|---|---|
NFIP Policy Holder | Points will be assessed for every NFIP policy that is verified within the benefiting area of the project (5 per NFIP Policy) | 5 x Each NFIP Policy |
Severe Repetitive Loss (SRL) and Repetitive Loss (RL) Properties | Points will be assessed for project that contains SRL or RL properties as defined in priority 4 below (10 per RL and 15 per SRL property) | 10 x each RL 15 x each SRL |
Private-Partnership Cost Share | Cost share taken on by private organizations/businesses emphasizing community participation, collaboration, and investment. Points will be assigned based on percentage of private cost share invested. | 150 |
Building Code Effectiveness Grading Schedule (BCEGS) rating | BCEGS rating assesses effectiveness of enforcement and adequacy of building codes with emphasis on mitigation. Classes weighted based on national class grouping ratings. Highest weight will be assigned to class 1 and descending through lower classes. (Graded Scale: 1 = 100, 2 = 90, 3 = 80, 4 = 70, 5 = 60, 5 = 50, 6 = 40, 7 = 30, 8 = 20, 9+ = 10) | 10-100 |
Community Rating System (CRS) Participation | The CRS recognizes and encourages community floodplain-management activities that exceed the minimum National Flood Insurance Program standards. Depending on the level of participation, flood insurance premium rates for policyholders can be reduced up to 45%. Highest weight will be assigned to class 1 and descending through lower classes. (Graded Scale: 1 = 100, 2 = 90, 3 = 80, 4 = 70, 5 = 60, 5 = 50, 6 = 40, 7 = 30, 8 = 20, 9 = 10) | 10-100 |
Cooperating Technical Partners Program (CTP) Participation | The CTP is a qualified partnership program in which communities commit to collaborate in maintaining up-to-date flood hazard maps and other flood hazard information. Points will be assigned to CTP participating communities. | 100 |
International Building Codes (IBC) Adopted (2009 or newer) | International Building Codes (IBC) Adopted (2009 or newer) | International Building Codes (IBC) Adopted (2009 or newer) |
Total Points Available | 500* |
* In the event of a tie between two or more community flood mitigation applications:
- FEMA will use the highest Benefit Cost Ratio (BCR) as a tiebreaker for projects; and.
- FEMA will use the total number of active policies in the local jurisdiction as a tie breaker for Advance Assistance.
After meeting the $70,000,000 available for community flood mitigation or when all eligible community flood mitigation project subapplications have been selected, FEMA will select eligible subapplications for the remaining funds in the following order:
2. Technical Assistance
FEMA will select eligible technical assistance subapplications up to $50,000 Federal share for Applicants who received FMA awards totaling at least $1,000,000 Federal share in FY 2018.
3. Flood Mitigation Planning
FEMA will select eligible planning subapplications up to $100,000 Federal share per Applicant with a maximum of $50,000 Federal share for State mitigation plan updates and $25,000 Federal share for local mitigation plans. FEMA may reduce the Federal share of any planning subapplication that exceeds the regulatory maximums.
4. Competitive Funding for Property Flood Mitigation Projects
FEMA will select eligible flood mitigation project subapplications on a competitive basis as follows:
- Projects that will mitigate flood damage to at least 50 percent of structures included in the subapplication that meet definition 42 U.S.C. 4104c(h)(3)(B)(ii) of a Severe Repetitive Loss (SRL) property: At least two separate NFIP claim payments have been made with the cumulative amount of such claims exceeding the market value of the insured structure
- Projects that will mitigate flood damage to at least 50 percent of structures included in the subapplication that meet the definition of a Repetitive Loss (RL) property: Have incurred flood-related damage on two occasions, in which the cost of the repair, on the average, equaled or exceeded 25% of the market value of the structure at the time of each such flood event
- Projects that will mitigate flood damage to at least 50 percent of structures included in the subapplication that meet definition 42 U.S.C. 4104c(h)(3)(B)(i) of a SRL property: four or more separate NFIP claims payments have been made with the amount of each claim exceeding $5,000, and with the cumulative amount of claims payments exceeding $20,000
5. FEMA Will Select Remaining Eligible Applications Once All Above Priorities Are Met Based on Benefits to the NFIP
FEMA received 234 FMA subapplications submitted by 32 states and territories totaling over $306.2 million: 36 planning, 167 projects, 4 technical assistance, and 27 applicant management cost subapplications.
FEMA has completed eligibility review to ensure compliance with HMA Guidance and has made selections based on the agency’s priorities and available funding. FEMA has identified for further review 145 FMA subapplications from 26 applicants: 26 planning (includes 18 Community Mitigation Advance Assistance), 94 projects (includes 4 Community Flood Mitigation projects), 4 technical assistance subapplications, and 21 applicant management costs for $209.6 million.
FY2019 Flood Mitigation Assistance Subapplicant Status
The below table lists the submitted planning and project subapplications and the status of each alphabetically by applicant.
Most of the Flood Mitigation Assistance funding goes towards elevation, acquisitions, and mitigation reconstruction of repetitively flood-damaged buildings insured by the National Flood Insurance Program (NFIP).
Learn about the definition of each status description:
Applicant | Subapplication Number | Subapplication Title | Submitted Federal Share | Status |
---|---|---|---|---|
AL | FMA-MC-04-AL-2019-006 | FY 2019 FMA SMC | $60,619.11 | Identified for Further Review |
AL | FMA-PL-04-AL-2019-002 | Advance Assistance for the City of Sheffield - Flood Study | $133,875.00 | Identified for Further Review |
AL | FMA-PJ-04-AL-2019-004 | City of Birmingham 2019 Germania Park Acquisition Project | $144,112.50 | Not Selected |
AL | FMA-PL-04-AL-2019-003 | City of Birmingham Shuttlesworth Park Advance Assistance Project | $82,425.00 | Did Not Meet HMA Requirements |
AL | FMA-PL-04-AL-2019-005 | City of Birmingham 2019 FMA Hooper City Advance Assistance Planning Project | $82,425.00 | Did Not Meet HMA Requirements |
AL | FMA-PJ-04-AL-2019-001 | City of Hanceville Property Acquisition & Flood Mitigation Project | $182,925.98 | Did Not Meet HMA Requirements |
AR | FMA-MC-06-AR-2019-012 | FMA NRD Management Costs | $357,082.90 | Identified for Further Review |
AR | FMA-PL-06-AR-2019-008 | City of Ward Advanced Assistance Drainage Study | $15,750.00 | Identified for Further Review |
AR | FMA-PL-06-AR-2019-006 | City of Lonoke Advanced Assistance Drainage Study | $98,437.50 | Identified for Further Review |
AR | FMA-PJ-06-AR-2019-003 | Jefferson County Elevation Project | $304,420.54 | Identified for Further Review |
AR | FMA-PJ-06-AR-2019-009 | Faulkner County Acquisition FMA | $562,831.25 | Identified for Further Review |
AR | FMA-PJ-06-AR-2019-002 | Jefferson County Acquisition and Demolition Project | $879,856.42 | Identified for Further Review |
AR | FMA-PJ-06-AR-2019-007 | Perry County Acquisition | $476,705.25 | Identified for Further Review |
AR | FMA-PJ-06-AR-2019-005 | City of Shannon Hills Acquisition | $580,499.36 | Identified for Further Review |
AR | FMA-PJ-06-AR-2019-004 | City of Bryant Acquisition | $190,870.00 | Not Selected |
AR | FMA-PJ-06-AR-2019-001 | City of Jonesboro Flood Mitigation 2019 | $321,796.98 | Not Selected |
AR | FMA-PJ-06-AR-2019-011 | Faulkner County FMA 75:25 | $1,180,270.31 | Not Selected |
AR | FMA-PJ-06-AR-2019-010 | City of Hot Springs Flood Project | $375,000.00 | Did Not Meet HMA Requirements |
AZ | FMA-MC-09-AZ-2019-004 | 2019 FMA State of Arizona Management Costs | $169,402.30 | Did Not Meet HMA Requirements |
AZ | FMA-PJ-09-AZ-2019-003 | 2019 - FMA - Project/Yarnell - Stoneway Flood Mitigation | $616,858.50 | Did Not Meet HMA Requirements |
AZ | FMA-PJ-09-AZ-2019-002 | 2019-FMA-Eagar Robertson Hollow Community Flood Mitigation Project. | $1,103,549.00 | Did Not Meet HMA Requirements |
AZ | FMA-PJ-09-AZ-2019-001 | 2019-Cottonwood-FMA-"Old Town" Drainage Improvements | $1,733,250.00 | Did Not Meet HMA Requirements |
AZ | FMA-PJ-09-AZ-2019-005 | 2019-FMA-Lower Highland Wash Flood Control Project | $2,554,112.81 | Did Not Meet HMA Requirements |
CA | FMA-PL-09-CA-2019-002 | 904.2 Advance Assistance City of Davis H Street Pump Station and Drainage System | $198,898.46 | Identified for Further Review |
CA | FMA-TA-09-CA-2019-003 | California 2019 FMA Technical Assistance | $50,000.00 | Identified for Further Review |
CA | FMA-PJ-09-CA-2019-001 | Sacramento County FMA19-00011 Acquisition Rep Loss 6550 Dry Creek Rd | $1,283,715.00 | Identified for Further Review |
CO | FMA-MC-08-CO-2019-002 | 2019 FMA State Management Cost | $11,250.00 | Identified for Further Review |
CO | FMA-PL-08-CO-2019-001 | Advanced Assistance - Storm Drainage Master Plan | $112,500.00 | Identified for Further Review |
CT | FMA-MC-01-CT-2019-006 | FY2019 FMA Management and Admin | $142,077.27 | Identified for Further Review |
CT | FMA-PL-01-CT-2019-002 | Advance Assistance Project for Town of Stratford FMA 2019 | $90,129.37 | Did Not Meet HMA Requirements |
CT | FMA-PJ-01-CT-2019-005 | Town of Stratford FMA Structure Raising 95 Washington Parkway | $278,749.99 | Identified for Further Review |
CT | FMA-PJ-01-CT-2019-003 | FMA 2019-27 Crimmins Rd, Darien Home Elevation | $262,057.99 | Did Not Meet HMA Requirements |
CT | FMA-PJ-01-CT-2019-001 | Stratford FMA 2019 Structure Raising Project- 65 and 105 Washington Parkway | $503,100.00 | Did Not Meet HMA Requirements |
CT | FMA-PJ-01-CT-2019-004 | FMA 2019-27 Crimmins Rd, Darien Home Acquisition | $674,699.99 | Did Not Meet HMA Requirements |
DC | FMA-MC-03-DC-2019-003 | DC 2019 FMA Management Costs | $15,000.00 | Identified for Further Review |
DC | FMA-PL-03-DC-2019-002 | Advance Assistance Blue Plains Advanced Wastewater Treatment Plant Floodwall-B | $75,000.00 | Identified for Further Review |
DC | FMA-PL-03-DC-2019-001 | Advance Assistance for Southwest DC and Buzzard Point Community | $125,000.00 | Identified for Further Review |
DE | FMA-PL-03-DE-2019-001 | Advance Assistance SR 1 Flooding Mitigation | $200,000.00 | Identified for Further Review |
DE | FMA-PJ-03-DE-2019-002 | 2204 Valley Ave Demo FMA | $165,600.00 | Did Not Meet HMA Requirements |
FL | FMA-MC-04-FL-2019-016 | State of Florida FMA Management Costs | $255,041.94 | Identified for Further Review |
FL | FMA-TA-04-FL-2019-017 | State of Florida FMA Technical Assistance Application | $50,000.00 | Identified for Further Review |
FL | FMA-PJ-04-FL-2019-010 | Manatee County 130 Michiana Drive Mitigation Reconstruction Project | $160,180.00 | Identified for Further Review |
FL | FMA-PJ-04-FL-2019-003 | City of Jacksonville Acquisition and Demolition - Bakersfield Drive | $310,974.00 | Identified for Further Review |
FL | FMA-PJ-04-FL-2019-012 | FY2019 FMA-Pasco County-Deedra Cir Elevation | $116,943.75 | Identified for Further Review |
FL | FMA-PJ-04-FL-2019-015 | FY2019 FMA - Pasco County - Green Key Rd Acquisition | $125,685.00 | Identified for Further Review |
FL | FMA-PJ-04-FL-2019-011 | FY2019 FMA-Pasco County-Bay Blvd Elevation #2 | $130,331.20 | Not Selected |
FL | FMA-PJ-04-FL-2019-002 | FMA-2019-Volusia-County-Elevation-#1 | $131,250.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-004 | FMA-2019-Volusia-County-Elevation-#8 | $131,250.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-005 | FMA-2019-Volusia-County-Elevation-#3 | $131,250.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-006 | FMA-2019-Volusia-County-Elevation-#5 | $131,250.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-007 | FMA-2019-Volusia-County-Elevation-#9 | $131,250.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-008 | FMA-2019-Volusia-County-Elevation-#6 | $131,250.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-009 | FMA-2019-Volusia-County-Elevation-#7 | $131,250.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-014 | FY2019 FMA- Pasco County- Minnieola Dr Acquisition | $254,835.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-001 | FMA-2019-Volusia-County-Elevation-#2 | $374,325.00 | Not Selected |
FL | FMA-PJ-04-FL-2019-013 | FY2019 FMA-Pasco County-Bay Blvd Elevation #1 | $108,395.43 | Did Not Meet HMA Requirements |
IA | FMA-MC-07-IA-2019-002 | FMA 2019 Recipient Management Cost | $11,250.00 | Identified for Further Review |
IA | FMA-PL-07-IA-2019-001 | City of Clive Advanced Assistance | $112,500.00 | Identified for Further Review |
ID | FMA-MC-10-ID-2019-002 | 2019 FMA IOEM MTA | $210,000.00 | Did Not Meet HMA Requirements |
ID | FMA-PJ-10-ID-2019-001 | City of Driggs Community Flood Mitigation Project | $2,100,000.00 | Did Not Meet HMA Requirements |
IL | FMA-MC-05-IL-2019-004 | FY19 State Management Costs | $471,336.22 | Identified for Further Review |
IL | FMA-PJ-05-IL-2019-002 | Machesney Park FMA Property Acquisition Project | $1,946,841.60 | Identified for Further Review |
IL | FMA-PJ-05-IL-2019-001 | Property Acquisition - 3W299 Crane Road St. Charles IL | $292,125.00 | Not Selected |
IL | FMA-PJ-05-IL-2019-003 | 2019 FMA Lake County RL Property Acquisition Project-Fox Lake | $632,312.00 | Not Selected |
KY | FMA-MC-04-KY-2019-011 | FMA2019 Kentucky Management Costs | $429,697.00 | Identified for Further Review |
KY | FMA-PJ-04-KY-2019-008 | Scott County KY Flood Mitigation Assistance Project | $275,000.00 | Identified for Further Review |
KY | FMA-PJ-04-KY-2019-007 | Harmony Landing Flood Mitigation Assistance | $914,764.20 | Identified for Further Review |
KY | FMA-PJ-04-KY-2019-002 | Oldham Acres Flood Mitigation Assistance Application | $1,049,112.85 | Identified for Further Review |
KY | FMA-PJ-04-KY-2019-010 | Beachland Beach Road | $275,121.00 | Identified for Further Review |
KY | FMA-PJ-04-KY-2019-003 | Harmony Village Flood Mitigation Assistance | $504,507.88 | Identified for Further Review |
KY | FMA-PJ-04-KY-2019-009 | Oak Valley Drive | $259,189.20 | Not Selected |
KY | FMA-PJ-04-KY-2019-005 | North Fork Little River Acquisition/Demolition | $318,579.61 | Not Selected |
KY | FMA-PJ-04-KY-2019-006 | Hopkinsville Repetitive Loss Acquisitions | $684,369.11 | Not Selected |
KY | FMA-PJ-04-KY-2019-001 | Harrods Creek Stabilization | $412,500.00 | Did Not Meet HMA Requirements |
KY | FMA-PJ-04-KY-2019-004 | Belknap Beach Flood Mitigation Assistance Application | $572,145.00 | Did Not Meet HMA Requirements |
LA | FMA-MC-06-LA-2019-038 | GOHSEP FMA SMC FY2019 Application | $1,216,506.10 | Identified for Further Review |
LA | FMA-PL-06-LA-2019-028 | Advance Assistance - Lacarpe Drainage Community Mitigation | $200,000.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-008 | TPCG - Community Flood Mitigation - Bayou Black | $9,670,659.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-020 | City of Mandeville FMA 2019 Elevation of Severe Repetitive Loss Properties | $2,270,808.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-031 | JP 2019 Climate Resilient Mitigation - R1 | $2,583,079.89 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-018 | RAPC - Rapides and Alexandria FMA FY 2019 Elevation of Floodprone Structures | $2,740,564.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-003 | City of New Orleans 2019 FMA Residential Elevation Project | $6,308,246.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-002 | City of New Orleans 2019 FMA Historic Districts Elevation Project | $8,438,022.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-033 | JP 2019 Climate Resilient Mitigation - R2 | $1,423,934.77 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-006 | City of Slidell 2019 Elevations #1 | $2,172,845.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-021 | St. Tammany Parish FMA 2019 Application 2 - SRL | $2,485,932.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-024 | LCG #2 SRL-RL FY19 FMA Residential Elevation or Acquisition | $2,799,760.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-011 | 2019 FMA Calcasieu Elevation and Acquisitions | $2,941,330.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-023 | LCG #1 SRL FY19 FMA Residential Elevation or Acquisition | $3,420,195.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-036 | City of Slidell 2019 Elevations #2 | $4,375,680.30 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-030 | JP 2019 Climate Resilient Mitigation - E3 | $6,093,194.40 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-029 | JP 2019 Climate Resilient Mitigation - E2 | $6,647,466.30 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-027 | JP 2019 Climate Resilient Mitigation - E1 | $8,957,386.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-004 | EBRP Acquisition and Elevation Project | $9,529,110.94 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-034 | Lafourche Parish 2019 FMA Elevation Project 1 | $722,239.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-016 | FMA 2019 Application 1 - SRL/RL | $1,090,727.70 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-010 | Ascension Parish FMA FY19 Elevation of RL/SRL Properties | $1,315,621.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-005 | TPCG - SRL/RL Elevation Project - FMA | $1,367,297.11 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-015 | City of Denham Springs FMA FY19 Elevation/Acquisition of Floodprone Properties | $1,682,061.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-017 | Iberia Parish FMA FY19 - Elevation Project | $2,144,867.45 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-009 | Vermilion FMA 2019 Application | $3,097,125.84 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-032 | Livingston Parish FMA 2019 | $4,825,253.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-007 | St. Charles Parish 2019 FMA Residential Elevation Project | $5,085,336.00 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-019 | City of Walker - FMA FY19 - Elevation Project | $340,704.90 | Identified for Further Review |
LA | FMA-PJ-06-LA-2019-001 | W Feliciana Repetitive Loss Property Elevation | $93,496.77 | Not Selected |
LA | FMA-PJ-06-LA-2019-037 | City of Slidell 2019 Elevations #3 | $2,008,589.40 | Not Selected |
LA | FMA-PJ-06-LA-2019-014 | Tangipahoa Parish FMA FY19 Elevation/Acquisition of Floodprone Structures | $3,835,999.00 | Not Selected |
LA | FMA-PJ-06-LA-2019-035 | Lafourche Parish 2019 FMA Elevation Project 2 | $598,710.75 | Not Selected |
LA | FMA-PJ-06-LA-2019-022 | Acadia Parish FMA FY 19 - Elevation Grant | $626,443.42 | Not Selected |
LA | FMA-PJ-06-LA-2019-013 | Lafitte FMA-R | $1,260,724.00 | Not Selected |
LA | FMA-PJ-06-LA-2019-012 | Lafitte FMA-E | $5,675,565.00 | Not Selected |
LA | FMA-PJ-06-LA-2019-025 | St. Mary Parish FMA 19 - Elevation Grant | $152,946.00 | Did Not Meet HMA Requirements |
LA | FMA-PJ-06-LA-2019-026 | City of Kenner Community Flood Mitigation Project | $6,198,391.78 | Did Not Meet HMA Requirements |
MA | FMA-MC-01-MA-2019-003 | 2019 FMA State Management Costs - Massachusetts | $34,800.00 | Identified for Further Review |
MA | FMA-PL-01-MA-2019-002 | Advance Assistance Town of Scituate Master Drainage Study and Plan | $199,998.44 | Did Not Meet HMA Requirements |
MA | FMA-PJ-01-MA-2019-001 | Town of Swampscott Residential Elevation Project | $193,490.00 | Identified for Further Review |
MD | FMA-MC-03-MD-2019-004 | FY19 FMA MEMA Management Cost | $23,343.75 | Identified for Further Review |
MD | FMA-PL-03-MD-2019-003 | Advance Assistance-Develpm. of Flood Mitigation Stratgies for City of Cambridge | $187,500.00 | Identified for Further Review |
MD | FMA-PL-03-MD-2019-001 | Dorchester County Flood Mitigation Plan | $22,500.00 | Identified for Further Review |
MD | FMA-PL-03-MD-2019-002 | City of Annapolis Flood Mitigation Plan | $23,437.50 | Identified for Further Review |
MN | FMA-PJ-05-MN-2019-001 | City of Lakeland Elevations | $384,090.08 | Identified for Further Review |
MO | FMA-PJ-07-MO-2019-004 | FMA FY19 Competitive SRL City of Herculaneum Buyout | $114,030.00 | Identified for Further Review |
MO | FMA-PJ-07-MO-2019-002 | FMA FY-19 Newton Co. Competitive Buyout Project | $180,952.50 | Identified for Further Review |
MO | FMA-PJ-07-MO-2019-001 | FY19 FMA SRL St. Charles Competitive Flood Mitigation Project | $452,490.00 | Identified for Further Review |
MO | FMA-PJ-07-MO-2019-003 | FMA-FY-19 Kansas City MO Water Services Competitive Buyout Project | $121,117.50 | Not Selected |
MO | FMA-PJ-07-MO-2019-005 | FY19 Brentwood Community Flood Mitigation Project | $7,586,713.49 | Did Not Meet HMA Requirements |
NC | FMA-MC-04-NC-2019-010 | NCEM: FMA FY19 Management Cost | $1,709,763.00 | Identified for Further Review |
NC | FMA-PL-04-NC-2019-008 | Dare County Advanced Assistance Stormwater Management Project | $150,000.00 | Identified for Further Review |
NC | FMA-PJ-04-NC-2019-001 | Pamlico County FMA 19 | $1,078,187.00 | Identified for Further Review |
NC | FMA-PJ-04-NC-2019-002 | Dare County PDM Home Elevations | $1,395,732.00 | Identified for Further Review |
NC | FMA-PJ-04-NC-2019-004 | Hyde County FY 2019 FMA | $773,060.00 | Not Selected |
NC | FMA-PJ-04-NC-2019-005 | Town of Windsor Acquisition - FMA2019 | $116,517.00 | Did Not Meet HMA Requirements |
NC | FMA-PJ-04-NC-2019-011 | Beaufort Co PDM-FMA Generator Critical Facilities Health Department | $111,632.00 | Did Not Meet HMA Requirements |
NC | FMA-PJ-04-NC-2019-009 | Beaufort Co PDM-FMA Generator Critical Facilities Water Dept | $240,750.00 | Did Not Meet HMA Requirements |
NC | FMA-PJ-04-NC-2019-006 | City of Lumberton - PDM19 (Wells & Raw Water Intake Flood Mitigation) | $1,068,000.02 | Did Not Meet HMA Requirements |
NC | FMA-PJ-04-NC-2019-007 | City of New Bern - Duffyfield Community Stormwater Enhancements | $1,642,218.00 | Did Not Meet HMA Requirements |
NC | FMA-PJ-04-NC-2019-003 | Town of Chapel Hill Flood Storage PDM2019 | $12,913,176.75 | Did Not Meet HMA Requirements |
ND | FMA-MC-08-ND-2019-002 | 2019 FMA State Management Costs | $114,935.47 | Did Not Meet HMA Requirements |
ND | FMA-PJ-08-ND-2019-001 | 2019 FMA Cass County Acquisitions | $1,149,354.75 | Did Not Meet HMA Requirements |
NH | FMA-MC-01-NH-2019-004 | FFY 2019 State of NH FMA Management Costs | $4,059.28 | Did Not Meet HMA Requirements |
NH | FMA-PL-01-NH-2019-002 | Quantifying First Finished Floor Elevation in Coastal NH | $27,234.00 | Did Not Meet HMA Requirements |
NH | FMA-PL-01-NH-2019-003 | Hampton Advanced Assistance Flood Mitigation Process Development | $42,000.00 | Did Not Meet HMA Requirements |
NH | FMA-PL-01-NH-2019-001 | Coastal NH groundwater rise hazard mitigation project | $52,543.50 | Did Not Meet HMA Requirements |
NJ | FMA-MC-02-NJ-2019-022 | NJ Office of Emergency Management | $2,210,930.35 | Identified for Further Review |
NJ | FMA-PL-02-NJ-2019-018 | Advance Assistance for Ventnor City, NJ- Ventnor Heights Floodwalls | $115,500.00 | Identified for Further Review |
NJ | FMA-TA-02-NJ-2019-021 | NJOEM - FMA 2019 Technical Assistance | $50,000.00 | Identified for Further Review |
NJ | FMA-PL-02-NJ-2019-014 | Atlantic City Municipal Annex Update | $12,600.00 | Identified for Further Review |
NJ | FMA-PL-02-NJ-2019-009 | Cape May FMA Municipal Annex Update | $18,750.00 | Identified for Further Review |
NJ | FMA-PL-02-NJ-2019-015 | Downe Municipal Annex Update | $18,750.00 | Identified for Further Review |
NJ | FMA-PL-02-NJ-2019-017 | Longport Municipal Annex Update | $18,750.00 | Identified for Further Review |
NJ | FMA-PL-02-NJ-2019-019 | Ventnor Mitigation Planning - Municipal Annex Update | $18,750.00 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-002 | FMA 2019 Township of Pequannock New Jersey - Elevations | $3,639,278.00 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-007 | FY 2019 Berkeley Township FMA Elevation Project (Application 4) | $306,080.62 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-011 | Lumberton 2019 FMA Elevation of 8 Structures | $652,875.00 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-003 | Belvidere Township Elevation of 4 Structures | $811,963.60 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-020 | Flood Mitigation Assistance - City of North Wildwood | $1,045,794.96 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-013 | (FMA) City of Ventnor Home Elevation Project | $2,849,461.81 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-016 | Elevation of 7 multi-family buildings in Ocean City, New Jersey | $3,035,661.37 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-001 | 2019 New Jersey Mitigation Assistance Program - Fairfield, Essex County | $5,002,691.00 | Identified for Further Review |
NJ | FMA-PJ-02-NJ-2019-010 | City of Ocean City 37 Residential Elevations | $6,061,219.00 | Not Selected |
NJ | FMA-PJ-02-NJ-2019-005 | FY 2019 Berkeley Township FMA Elevation Project (Application 2) | $266,950.68 | Not Selected |
NJ | FMA-PJ-02-NJ-2019-004 | FY 2019 Berkeley Township FMA Elevation Project (Application 1) | $274,929.04 | Not Selected |
NJ | FMA-PJ-02-NJ-2019-006 | FY 2019 Berkeley Township FMA Elevation Project (Application 3) | $299,021.63 | Not Selected |
NJ | FMA-PJ-02-NJ-2019-008 | FY 2019 Berkeley Township FMA Elevation Project (Application 5) | $324,378.18 | Not Selected |
NJ | FMA-PJ-02-NJ-2019-012 | Borough of Oakland Flood Mitigation Assistance 'Upper Allerman Brook' 2019 | $640,800.00 | Did Not Meet HMA Requirements |
NY | FMA-MC-02-NY-2019-003 | NYSDHSES FY2019 FMA Management Cost Application | $36,589.50 | Identified for Further Review |
NY | FMA-PL-02-NY-2019-002 | HRO FMA Mitigation planning Advance Assistance | $199,950.00 | Identified for Further Review |
NY | FMA-PJ-02-NY-2019-001 | Village of Newark Valley FMA 2019 SRL | $221,276.00 | Identified for Further Review |
OH | FMA-MC-05-OH-2019-003 | FMA_FY2019_State_of_Ohio_Recipient_Management_Cost_Application | $24,230.43 | Did Not Meet HMA Requirements |
OH | FMA-PL-05-OH-2019-002 | FMA Advance Assistance for Lucas County - Soil and Water Conservation District | $99,984.10 | Did Not Meet HMA Requirements |
OH | FMA-PJ-05-OH-2019-001 | Village of Prospect FMA (SRL) Acquisition Project | $142,270.80 | Did Not Meet HMA Requirements |
PA | FMA-MC-03-PA-2019-015 | FMA 2019 Management Cost | $524,992.05 | Identified for Further Review |
PA | FMA-PL-03-PA-2019-017 | State PA FY 19 FMA Advanced Assistance Susquenhanna Upper Stream Mitigation | $200,000.00 | Identified for Further Review |
PA | FMA-TA-03-PA-2019-014 | FMA 2019 Technical Assistance | $37,500.00 | Identified for Further Review |
PA | FMA-PL-03-PA-2019-016 | Mercer County Flood Hazard Mitigation Plan | $18,750.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-010 | 33 N. Delaware Avenue, Yardley Borough Mitigation Reconstruction Project | $150,000.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-005 | FMA 2019 Middle Paxton Township Dauphin County Elevation Project | $175,500.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-004 | Town of Bloomsburg Elevations | $334,450.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-007 | Yardley Borough 93 N. Delaware Avenue Elevation Project | $451,729.40 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-013 | Hallam Borough Frysville Rd FMA Acquisition | $463,360.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-009 | 1012 Glen Road - Flood Mitigation Project | $497,040.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-008 | Yardley Borough Elevation of 8 Structures | $2,009,670.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-012 | Elevation of four homes in floodplain | $571,230.00 | Identified for Further Review |
PA | FMA-PJ-03-PA-2019-011 | Columbia County, Cleveland Township Acquisition Project | $110,834.10 | Not Selected |
PA | FMA-PJ-03-PA-2019-003 | 2019 FMA Elevation - 2611 River Road | $140,085.00 | Did Not Meet HMA Requirements |
PA | FMA-PJ-03-PA-2019-006 | FMA 2019 West Norriton Elevation | $292,500.00 | Did Not Meet HMA Requirements |
PA | FMA-PJ-03-PA-2019-002 | Community Flood Mitigation FMA 2019 Schamokin Coal Sewer Authority Mitigation | $711,000.00 | Did Not Meet HMA Requirements |
PA | FMA-PJ-03-PA-2019-001 | Community Flood Mitigation Myerstown Sewer Treatment Plant mitigation | $970,275.00 | Did Not Meet HMA Requirements |
RI | FMA-MC-01-RI-2019-003 | FMA Management Cost application | $25,994.24 | Did Not Meet HMA Requirements |
RI | FMA-PL-01-RI-2019-001 | Advanced Assistance: Woonasquatucket River Flood Resiliency Study, Providence | $199,942.50 | Did Not Meet HMA Requirements |
RI | FMA-PL-01-RI-2019-002 | Advance Assistance for Park Avenue Drainage Study - Activity Code 904.2 | $59,999.90 | Did Not Meet HMA Requirements |
SC | FMA-MC-04-SC-2019-006 | FY 2019 SCDNR Technical Assistance/Management Cost Grant | $191,381.05 | Identified for Further Review |
SC | FMA-PJ-04-SC-2019-002 | Woodland Shores Drainage Project | $549,567.30 | Identified for Further Review |
SC | FMA-PJ-04-SC-2019-001 | Big Oak Street FMA Demo/Rebuild | $150,000.00 | Identified for Further Review |
SC | FMA-PJ-04-SC-2019-004 | City of Charleston - 2 Property Acquisition Projects | $536,284.17 | Identified for Further Review |
SC | FMA-PJ-04-SC-2019-003 | City of Charleston - 5 Elevation Projects | $871,819.98 | Identified for Further Review |
SC | FMA-PJ-04-SC-2019-005 | Georgetown Elevation Project | $97,575.00 | Not Selected |
TN | FMA-MC-04-TN-2019-007 | FY2019 State of Tennessee Management Cost Application | $342,667.25 | Identified for Further Review |
TN | FMA-PJ-04-TN-2019-003 | Hamilton County 4921 Northwind Drive Property Acquisition | $184,310.00 | Identified for Further Review |
TN | FMA-PJ-04-TN-2019-004 | Residential Buyout of 201 Delta Road, Knoxville Tennessee | $275,900.00 | Identified for Further Review |
TN | FMA-PJ-04-TN-2019-002 | MWS-SW Acquisition/Demolition of Four (4) Properties | $913,855.50 | Identified for Further Review |
TN | FMA-PJ-04-TN-2019-005 | Residential House Buyouts on Tecoma Drive Knoxvile Tennessee - Senter/Scally | $349,200.00 | Not Selected |
TN | FMA-PJ-04-TN-2019-001 | MWS-SW Acquisition/Demolition of Six (6) Properties | $1,141,816.50 | Not Selected |
TN | FMA-PJ-04-TN-2019-006 | City of Hendersonville, TN - Acquisition Project | $1,320,246.00 | Not Selected |
TX | FMA-MC-06-TX-2019-014 | TWDB FY2019 Management Cost | $2,144,777.52 | Identified for Further Review |
TX | FMA-PL-06-TX-2019-006 | City of Galveston Community Flood Mitigation Advance Assistance - Strand Study | $150,000.00 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-005 | City of Corinth - Community Flood Mitigation Project | $2,907,633.14 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-013 | 2019 FMA Subapplication -City of Vidor Acquisition | $429,159.20 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-002 | City of Pearland Flood Mitigation Assistance Program FY 2020 | $1,346,400.00 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-010 | Galveston County FMA Elevations 2020 | $6,606,442.27 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-003 | Montgomery County FMA 2019 Acquisition | $10,076,167.19 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-004 | Nassau Bay 2019 FMA Home Elevations | $1,876,430.06 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-012 | City of Houston Elevation Mitigation Project 2019 NO.3 | $7,094,189.80 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-007 | City of Houston Elevation Mitigation Project 2019 NO.1 | $7,397,749.02 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-009 | City of Houston Elevation Mitigation Project 2019 NO.2 | $5,592,570.18 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-008 | Orange County FMA Elevation Project | $1,003,984.04 | Identified for Further Review |
TX | FMA-PJ-06-TX-2019-001 | City of Jersey Village 2019 FMA Elevation Project | $8,974,792.90 | Not Selected |
TX | FMA-PJ-06-TX-2019-011 | Sunset Valley Community Flood Mitigation Project | $252,532.50 | Did Not Meet HMA Requirements |
VA | FMA-MC-03-VA-2019-011 | FMA 2019 Management Cost | $1,181,046.00 | Identified for Further Review |
VA | FMA-PL-03-VA-2019-010 | Advanced Assistance City of Portsmouth SRL/NFIP Housing BCA & Toolkit | $150,000.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-013 | City of Portsmouth Olde Towne Stormwater Pump Station | $7,485,000.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-001 | City of Roanoke - Acquisition of 1 SRL Property | $150,331.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-012 | Greene County Acquisition of 1 Property | $266,700.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-007 | City of Virginia Beach Elevation of 6 Properties | $1,882,004.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-002 | Northern Neck PDC Elevation of 2 Residential Properties | $314,829.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-008 | Gloucester County Elevation of 4 Properties | $694,341.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-006 | City of Virginia Beach Acquisition of 3 Properties | $803,061.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-009 | City of Chesapeake Acquisition 5 Repetitive Loss Structures | $1,145,710.00 | Identified for Further Review |
VA | FMA-PJ-03-VA-2019-003 | Middle Peninsula PDC Mitigation Reconstruction of Captain Sinclair | $112,500.00 | Not Selected |
VA | FMA-PJ-03-VA-2019-004 | Middle Peninsula PDC Mitigation Reconstruction of Ware Cove | $150,000.00 | Not Selected |
VA | FMA-PJ-03-VA-2019-005 | Fairfax County Acquisition of 1 Property | $920,000.00 | Not Selected |
WI | FMA-MC-05-WI-2019-002 | FMA 2019 State Management Costs | $17,816.10 | Identified for Further Review |
WI | FMA-PJ-05-WI-2019-001 | Kenosha County FMA 2019 Acquisition/Demolition | $178,161.00 | Identified for Further Review |
WY | FMA-PL-08-WY-2019-001 | Upper North Platte River Planning at Boozer Creek FMA | $84,400.00 | Identified for Further Review |