Pennsylvania: Eastwick Near-Term Flood Barrier Project

Eastwick will build a flood barrier to reduce flood risks from many sources.

alert - info

Philadelphia, Pennsylvania: $2.1 Million

Project Description

The Philadelphia Office of Sustainability leads the Eastwick Near-Term Flood Barrier Project. It aims to boost resilience by reducing flood risks in Eastwick. The Eastwick area is vulnerable to several flooding sources. This project tackles the issue of riverine flooding from Cobbs Creek. This flooding threatens about 601 residences during a 100-year storm event. By setting up a flood barrier, the project will protect against flooding now. The community can develop a long-term, in-depth Flood Resilience Strategy. This project was selected for Building Resilient Infrastructure and Communities Direct Technical Assistance.

Tags:
Last updated