This page provides the status of the Pre-Disaster Mitigation (PDM) planning and project subapplications that were submitted to FEMA for the Fiscal Year (FY) 2018 application cycle. FEMA's Hazard Mitigation Assistance (HMA) grant programs provide funding to protect life and property from future natural disasters. The PDM grant program is designed to implement a sustained predisaster natural hazard mitigation program to reduce overall risk to the population and structures from future hazard events, while also reducing reliance on Federal funding in future disasters.
For FY 2018, $250 million was appropriated for PDM. FEMA made available $250 million for grants. On August 3, 2018, FEMA announced the application period from October 1, 2018-January 31, 2019 in the Notice of Funding Opportunity (NOFO) posted on www.grants.gov. The agency’s priorities for the FY 2018 PDM program are:
FY2018 Pre-Disaster Mitigation Program Priorities
FEMA will select eligible subapplications up to the available PDM funding amount of $250 million in the following order:
1. Statutory Allocation of $575,000 Federal Share for States, Territories and the District of Columbia (DC)
To meet the statutory requirement, FEMA will select eligible planning and project subapplications from each state, territory and DC in order of the applicant’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000 (see Other Eligibility Criteria subsection under section C of this NOFO).
For example, an Applicant’s #1 ranked subapplication for $200,000 Federal share and #2 ranked subapplication for $340,000 would be selected for the allocation; however, the #3 ranked subapplication for $575,000 and any other eligible subapplications would be considered on a competitive basis in priority category 3 below.
2. Tribal Set Aside of $15 Million for Federally-Recognized Tribes, Not to Exceed $575,000 Federal Share Per Tribal Applicant
FEMA will set aside $15 million for federally-recognized tribes applying directly to FEMA as applicants. FEMA will select eligible planning and project subapplications for each tribal applicant in order of the tribe’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000, not to exceed a total of $15 million.
3. Competitive Funding
After meeting the statutory requirement for state/territory allocations and the tribal set aside, FEMA will select from the remaining eligible planning and project subapplications from all applicants on a competitive basis up to the available amount of funding.
If an applicant submits projects in excess of the limit for competitive consideration (see Other Eligibility Criteria subsection under section C of this NOFO), then FEMA will only review the highest ranked competitive project subapplications up to the limit.
FEMA will select subapplications for competitive funding in the following order:
- Multi-state/tribal mitigation initiatives.FEMA will select one eligible multi-state/tribal mitigation planning or project subapplication per applicant.
- Planning subapplications from applicants that have less than $400,000 Hazard Mitigation Grant Program (HMGP) planning funds available. FEMA will select eligible planning subapplications from applicants that have less than $400,000 HMGP planning funds available (see Hazard Mitigation Grant Program subsection in Section H of this NOFO).
- Project subapplications from applicants that have less than $4 million HMGP regular project funds available. FEMA will select eligible project subapplications from applicants that have less than $4 million HMGP regular project funds in the following order:
- Non-flood hazard (e.g., seismic, wildfire, landslide, wind and drought) mitigation projects
- Flood mitigation activities except acquisition, elevation, or mitigation reconstruction (e.g., stormwater management and flood control measures)
- Acquisition, elevation and mitigation reconstruction projects
- Generators for critical facilities identified in a FEMA-approved Mitigation Plan
- Planning subapplications from applicants that have $400,000 or more HMGP planning funds available. FEMA will select eligible planning subapplications from applicants that have $400,000 or more HMGP planning funds available.
- Project subapplications from applicants that have $4 million or more HMGP regular project funds available. FEMA will select eligible project subapplications from applicants that have $4 million or more HMGP regular project funds available in the following order:
- Non-flood hazard mitigation projects
- Flood mitigation activities except acquisition, elevation, or mitigation reconstruction
- Acquisition, elevation and mitigation reconstruction projects
- Generators for critical facilities identified in a FEMA-approved Mitigation Plan
FEMA will further prioritize planning and project subapplications in priority categories 2 and 3 above, as needed, in the following order:
- Subapplicant’s small impoverished community status (see Cost Share or Match subsection under section C of this NOFO);
- Indication of public-private partnership (i.e., whether private sector funding is included in the required non-federal cost share);
- Subapplicant’s FEMA-validated residential or commercial Building Code Effectiveness Grading Schedule (BCEGS) rating, as appropriate to the activity type, from a grade of 1 to 10;
- FEMA-validated Benefit Cost Ratio (BCR) for projects (see Benefit Cost Analysis for Mitigation Projects subsection under section D of this NOFO); and
- The applicant’s rank of subapplications (see Content and Form of Application Submission subsection under Section D of this NOFO).
For more information on BCEGS, please visit the Insurance Services Office - Mitigation website.
FEMA may select a subapplication out of priority order based upon one or more of the following factors:
- Availability of funding;
- Duplication of subapplications;
- Program priorities and policy factors; and,
- Other pertinent information.
To be eligible for the state/territory allocation or the tribal set aside, the applicant’s highest ranked planning or project subapplication must not have exceeded $575,000 Federal share. There was no limit to the number of planning and project subapplications that applicants could have submitted for the state/territory allocation or tribal set aside up to $575,000 federal share, but the applicant must have ranked them higher than subapplications for competitive consideration. Applicants could not have included more than nine (9) project subapplications for competitive consideration over and above any project(s) submitted for the state/territory allocation or tribal set aside.
Any applicant agency that was willing to serve as the applicant for multi-state or multi-tribal mitigation activities must have included one multi-state/tribal project subapplication(s) in their grant application for a maximum of ten (10) competitive projects, notwithstanding any project(s) that were submitted towards their state/territory allocation or tribal set aside. Applicants who included multi-state/tribal subapplication(s) in their grant application must have clearly identified how the effort was coordinated.
FEMA received 579 subapplications from 90 applicants (42 of which were federally-recognized Indian Tribal Governments) totaling $512.5 million: 226 planning, 298 projects, and 55 applicant management costs. FEMA has completed its eligibility review to ensure compliance with HMA Guidance and has made selections based on the agency’s priorities and available funding. FEMA has identified for further review 359 PDM subapplications from 72 applicants (27 of which are Indian Tribal Governments): 190 planning, 120 projects, and 49 associated applicant management costs totaling $247.3 million. FEMA selected (identified for further review) all eligible subapplications in priorities 1 through 3cii. Eligible subapplications in priority 3 were ranked in order by project type; small, impoverished community status; BCEGS rating; and BCR for selection. FEMA is unable to fund (not selected) the remaining eligible subapplications in priority 3. The table below lists the submitted planning and project subapplications and the status of each alphabetically by applicant. Further explanation of the status is provided below the table.
FY2018 Pre-Disaster Mitigation Subapplicant Status
The below table lists the submitted planning and project subapplications and the status of each alphabetically by applicant.
Learn about the definition of each status description:
Applicant | Subapplication Title | Submitted Federal Share | Status |
---|---|---|---|
AK | LHMP Updates | $89,100.00 | Identified for Further Review |
AK | LHMP Updates 2 | $129,780.00 | Identified for Further Review |
AK | LHMP Updates 3 | $146,580.00 | Identified for Further Review |
AK | Port of Alaska Strengthen Fender Assemblies | $4,000,000.00 | Identified for Further Review |
AK | FY2018 SMC | $1,024,998.00 | Identified for Further Review |
AK | Yakutat's Water & Sanitation Service Infrastructure Planning Project | $187,497.02 | Identified for Further Review |
AK | Port of Alaska Resilient Infrastructure - Petroleum Cement Terminal | $10,000,000.00 | Did Not Meet HMA Requirements |
AL | 2018 AEMA SMC | $9,435.65 | Identified for Further Review |
AL | Division D Multi-Jurisdictional Multihazard Mitigation Plan | $100,019.79 | Identified for Further Review |
AL | Hazard Mitigation Plan Update - Division B | $75,000.00 | Identified for Further Review |
AL | Fayette County Multi-Hazard Mitigation Plan Update | $20,000.00 | Identified for Further Review |
AL | Tuscaloosa County Multi-Hazard Mitigation Plan Update | $20,000.00 | Identified for Further Review |
AL | Marshall County Multi-Hazard Mitigation Plan Update | $20,000.00 | Identified for Further Review |
AL | Community of Hulaco - Safe Room/Storm Shelter Construction | $74,944.35 | Identified for Further Review |
AR | Mount Ida School District | $510,000.00 | Identified for Further Review |
AR | Stone County Multi-Jurisdictional All Hazard Mitigation Plan | $22,500.00 | Identified for Further Review |
AR | Van Buren County Mitigation Plan Update | $30,000.00 | Identified for Further Review |
AR | Grant County Hazard Mitigation Plan | $18,000.00 | Identified for Further Review |
AR | Pope County Mitigation Plan | $36,750.00 | Identified for Further Review |
AR | Marshall High School Safe Room | $1,097,568.44 | Identified for Further Review |
AR | Arkansas 2018 PDM Management Costs | $651,900.00 | Identified for Further Review |
AR | Perryville School District Safe-room | $960,000.00 | Not Selected |
AR | Cotter School District | $1,380,462.27 | Not Selected |
AR | Harmony Grove Safe Room | $2,464,242.75 | Not Selected |
AR | Mississippi COunty Hazard Mitigation Plan Update | $7,125.00 | Did Not Meet HMA Requirements |
AZ | 2018-PDM Advance Assistance: Pre-wildfire Assessment | $194,792.67 | Identified for Further Review |
AZ | Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 2020 | $82,000.00 | Identified for Further Review |
AZ | 2018-PDM-Coconino-Coconino County Blue Ridge Community Wildfire Protection Plan | $16,125.00 | Identified for Further Review |
AZ | 2018-PDM-Coconino-Coconino County City of Williams Community Wildfire Protection | $19,850.00 | Identified for Further Review |
AZ | 2018 PDM Apache County D2-Kinlichee Red Clay Wash | $170,895.00 | Identified for Further Review |
AZ | 2018-PDM-Taylor Railroad Grade Wash | $409,461.00 | Identified for Further Review |
AZ | 2018-PDM-Apache County D2-Tanner Springs | $330,920.00 | Identified for Further Review |
AZ | 2018-PDM-Snowflake Boulevard | $224,586.00 | Identified for Further Review |
AZ | 2018-PDM-Sunland Gin Road Flood Mitigation | $1,200,000.00 | Identified for Further Review |
AZ | 2018 PDM State of Arizona Management Costs | $1,351,440.40 | Identified for Further Review |
AZ | 2018-PDM-Oro Valley-Generator Project | $90,984.00 | Not Selected |
AZ | 2018 PDM Reslient Infrasturcture - Ephraim Canyon Flood Control | $8,487,533.96 | Did Not Meet HMA Requirements |
AZ | 2018-PDM-Pinetop FD Hazardous Fuels Mitigation | $153,900.00 | Did Not Meet HMA Requirements |
AZ | 2018-PDM-Yarnell Fire Station Generator Project | $23,250.00 | Did Not Meet HMA Requirements |
AZ | 2018 PDM Flood Control District of Maricopa County Floodplain Management Plan | $37,500.00 | Did Not Meet HMA Requirements |
AZ | 2018-PDM-Catalina Ridge Channel Reconstruction | $1,599,976.78 | Did Not Meet HMA Requirements |
AZ | 2018-PDM-Christensen Road at Lower Magma Channel Drainage Improvements | $486,806.00 | Did Not Meet HMA Requirements |
AZ | 2018-PDM-Gila Bend Structural Mitigation Projects | $2,520,000.00 | Did Not Meet HMA Requirements |
AZ | 2018-PDM-Cottonwood-Old Town" Flood Improvements" | $1,970,625.00 | Did Not Meet HMA Requirements |
Bad River | Bad River Flood Study Advance Assistance | $144,543.18 | Did Not Meet HMA Requirements |
Barona Band of Mission Indians | Barona Band of Mission Indians Hazard Mitigation Plan Update | $42,750.00 | Identified for Further Review |
Blue Lake Rancheria | Blue Lake Rancheria Wildfire Mitigation Project | $272,842.50 | Identified for Further Review |
Blue Lake Rancheria | Blue Lake Rancheria Wildfire Mitigation Project Management Costs | $26,949.42 | Identified for Further Review |
CA | Cahuilla Reservation Fuels Reduction and Defensible Space Fire Mitigation Projec | $248,458.26 | Identified for Further Review |
CA | Redwood City - Easter Bowl and Glenloch Tanks Seismic Improvements Project | $306,584.25 | Identified for Further Review |
CA | Advance Assistance - Anaheim Hills Innovative Fire Mitigation Feasibility Study | $75,000.00 | Identified for Further Review |
CA | East Valley Water District Seismic Reservoir Study Advance Assistance Project | $124,918.98 | Identified for Further Review |
CA | California 2018 PDM Management Cost | $3,287,177.25 | Identified for Further Review |
CA | Chula Vista WUI Hazardous Fuel Reduction and Defensible Space Project | $2,081,940.00 | Not Selected |
CA | City of San Bernardino Seismic Retrofitting of Civic Center Parking Structure | $4,000,000.00 | Not Selected |
CA | City of San Bernardino Seismic Retrofitting of City Hall Main Building | $4,000,000.00 | Not Selected |
CA | Good Samaritan PDM Seismic Bracing of Hospital Equipment and Utilities | $1,740,458.18 | Not Selected |
CA | Good Samaritan PDM Seismic Bracing of Kitchen | $422,953.18 | Not Selected |
CA | San Bernardino Municipal Water Department Seismic Retrofit Concrete Reservoirs | $1,360,760.00 | Not Selected |
CA | City of Redwood City Main City Area Water Distribution System Retrofit Project | $3,000,000.00 | Not Selected |
CA | Statewide Resilient Infrastructure Multi-family Seismic Retrofit Program | $10,000,000.00 | Did Not Meet HMA Requirements |
CA | Buena Vista Creek Debris Basin Project | $2,971,237.42 | Did Not Meet HMA Requirements |
CA | Cedar Creek Canal and Monte Vista Spill Design and Improvements to reduce the po | $1,841,419.59 | Did Not Meet HMA Requirements |
Cher-Ae Heights of the Trinidad Rancheria | Cher-Ae Lane Slope Stabilization | $574,821.00 | Identified for Further Review |
Cher-Ae Heights of the Trinidad Rancheria | Trinidad Rancheria Management Costs | $19,755.00 | Identified for Further Review |
Cherokee Nation | Cherokee Nation Mitigation Plan Update | $140,301.47 | Identified for Further Review |
Cherokee Nation | Cherokee Nation Community Storm Safe Project | $259,375.26 | Identified for Further Review |
Cherokee Nation | Cherokee Nation M & A of PDM Grant and Projects | $39,967.67 | Identified for Further Review |
Cheyenne & Arapaho Tribe | Cheyenne & Arapaho Tribes Public Safety Project | $575,000.00 | Did Not Meet HMA Requirements |
Cheyenne & Arapaho Tribe | Cheyenne & Arapaho Tribes Public Safety Project | $57,507.00 | Did Not Meet HMA Requirements |
CO | Grand County Hazard Mitigation Plan | $41,500.00 | Identified for Further Review |
CO | Larimer County Multi-Jurisdictional Hazard Mitigation Plan Update | $75,000.00 | Identified for Further Review |
CO | El Paso County Hazard Mitigation Plan Update | $108,000.00 | Identified for Further Review |
CO | Northeast Colorado Regional Hazard Mitigation Plan | $90,000.00 | Identified for Further Review |
CO | Weld County Hazard Mitigation Plan Update | $60,000.00 | Identified for Further Review |
CO | Update the Hazard Mitigation Plan For Montezuma County, CO. | $32,250.00 | Identified for Further Review |
CO | Chaffee County HMP Update | $41,378.00 | Identified for Further Review |
CO | Jefferson County Hazard Mitigation Plan Update | $70,000.00 | Identified for Further Review |
CO | City of Aurora Hazard Mitigation Plan Update | $54,000.00 | Identified for Further Review |
CO | Boulder County FY18 PDM-Community Pre-Disaster Program Advance Assistance | $197,821.50 | Identified for Further Review |
CO | Resilient Infrastructure Dam Safety Mitigation at Goose Pasture Tarn Dam | $10,000,000.00 | Identified for Further Review |
CO | Sugarloaf Road Mitigation Project | $2,680,823.70 | Identified for Further Review |
CO | Chaffee County Wildfire Mitigation Project | $247,500.00 | Identified for Further Review |
CO | Cottonwood Creek at Woodmen and Austin Bluffs | $2,981,770.00 | Identified for Further Review |
CO | Bear Creek at 8th Street | $505,930.00 | Identified for Further Review |
CO | Pine River Ranches Bridge Replacement | $825,000.00 | Identified for Further Review |
CO | 2018 PDM State Management Cost Application | $1,830,153.00 | Identified for Further Review |
CO | Town of Estes Park Flood Mitigation 2018 PDM | $1,019,350.50 | Did Not Meet HMA Requirements |
CO | City of Aurora Upper Westerly Creek | $4,000,000.00 | Did Not Meet HMA Requirements |
Connecticut | City of Norwalk Five Mile River Pump Station Upgrade-PDM2018 | $135,000.00 | Did Not Meet HMA Requirements |
Connecticut | FY 2019 PDM Grant - Barkhamsted | $113,653.00 | Did Not Meet HMA Requirements |
Connecticut | Daniels Farm Road Mitigation Project | $373,998.75 | Did Not Meet HMA Requirements |
Connecticut | Norfolk Sewer District - WWTP Emer. Generator | $88,300.00 | Did Not Meet HMA Requirements |
Connecticut | Emergency Shelter Generator Project. 10 East St, Morris, CT | $90,000.00 | Did Not Meet HMA Requirements |
Coquille Indian Tribe | CIT - Backup Generator Mitigation Project | $147,060.00 | Did Not Meet HMA Requirements |
Coquille Indian Tribe | CIT - Backup Generator Mitigation Project | $ - | Did Not Meet HMA Requirements |
CT | NW Hills NHMP Update | $65,879.67 | Identified for Further Review |
CT | Lower Connecticut River Valley Multijurisdictional Natural Hazard Mitigation Pla | $187,500.00 | Identified for Further Review |
CT | WestCOG Local MultiJurisdictional MultiHazard Mitigation Plan | $186,197.93 | Identified for Further Review |
CT | Naugatuck Valley Council of Governments-PDM18 | $300,000.00 | Identified for Further Review |
CT | FY 2018 PDM Management Costs | $137,105.24 | Identified for Further Review |
DE | Bayview Home Elevation | $423,150.00 | Identified for Further Review |
DE | NCC Multi Jurisdiction AHMP 5 Yr Revision | $56,250.00 | Identified for Further Review |
DE | Kent County Delaware All Hazards Mitigation Plan | $37,500.00 | Identified for Further Review |
DE | Town of Fenwick Island FEMA Project - Arendal | $90,877.50 | Identified for Further Review |
DE | West Cedar Avenue Flood Mitigation Planning Study - Lewes, Delaware | $88,500.00 | Identified for Further Review |
DE | Flood study at the Indian River Marina campground in Rehoboth Beach Delaware | $45,090.00 | Identified for Further Review |
DE | Wein Home Elevation Project-PDM | $123,750.00 | Not Selected |
DE | 63 Meadow Road New Castle Acquisition | $104,250.00 | Not Selected |
DE | KCLC Pump Station LS1 Emergency Generator | $25,950.00 | Not Selected |
DE | KCLC Pump Station LS11C Emergency Generator | $25,575.00 | Not Selected |
DE | KCLC Pump Station 30B Emergency Generator | $29,475.00 | Not Selected |
DE | KCLC Pump Station 45 Emergency Generator | $25,200.00 | Not Selected |
DE | KCLC Pump Station 30A Emergency Generator | $25,500.00 | Not Selected |
DE | Kent County DPS Generator Project | $84,750.00 | Did Not Meet HMA Requirements |
Fallon Paiute-Shoshone Tribe | Fallon Paiute-Shoshone Tribe Advanced Assistance | $141,921.00 | Identified for Further Review |
FL | FY2019-PDM-Monroe County - Guidance Care Center - Emergency Generator | $75,930.00 | Identified for Further Review |
FL | FY2018-PDM Orange City-Installation of 8 Generators at Critical Need LiftStation | $297,710.25 | Identified for Further Review |
FL | Manatee County/Cedar Hammock Fire Rescue Mitigation Generator Project | $44,970.00 | Identified for Further Review |
FL | Flagler Co. Health Department Wind Retrofit | $59,145.00 | Identified for Further Review |
FL | FY2019-PDM-Miami-Dade County, FL: North Central Branch Library Hardening Project | $26,470.27 | Identified for Further Review |
FL | FY2019-PDM-Miami-Dade County, FL: Allapattah Branch Library Hardening Project | $52,412.57 | Identified for Further Review |
FL | FY 2018 PDM - Broward County - Mast Arm Conversion - Broward Blvd @E. 15th Ave. | $341,025.35 | Identified for Further Review |
FL | FY2019-PDM-Miami-Dade County, FL: North Dade Regional Library Hardening Project | $166,139.32 | Identified for Further Review |
FL | FY2019-PDM-Miami-Dade County, FL: Coral Gables Branch Library Hardening Project | $311,254.57 | Identified for Further Review |
FL | FY2019-PDM-Miami-Dade County, FL: South Dade Regional Library Hardening Project | $609,561.38 | Identified for Further Review |
FL | FY2019 PDM - Walton Co, Florida - Hazard Mitigation Plan Update | $56,625.00 | Identified for Further Review |
FL | FY 2019 PDM - Monroe County Hazard Mitigation Strategy Update | $298,500.00 | Identified for Further Review |
FL | Broward County PDM Advance Assistance | $150,000.00 | Identified for Further Review |
FL | FY2018 HMA - Pre-Disaster Mitigation Program Management Cost | $1,854,744.22 | Identified for Further Review |
FL | PDM FL-2019-053 City of Jacksonville Nemours Childrens Specialty Care Generator | $2,282,406.00 | Did Not Meet HMA Requirements |
FL | FY2018 PDM, City of Jacksonville-PW Pump Station Generator Landon Avenue | $236,347.73 | Did Not Meet HMA Requirements |
FL | 7th Street Drainage Improvement Project | $337,500.00 | Did Not Meet HMA Requirements |
FL | FY2018 PDM City of St. Petersburg North Basin Seawall Mitigation Project | $4,000,000.00 | Did Not Meet HMA Requirements |
FL | City of St Petersburg Central Basin Seawall Mitigation Project | $4,000,000.00 | Did Not Meet HMA Requirements |
FL | FY 2019 PDM - City of Miami Beach - Par 3 Resilient Infrastructure Project | $1,617,443.25 | Did Not Meet HMA Requirements |
Fort Peck Assiniboine & Sioux Tribes | Fort Peck Tribes PDM Plan Update | $30,000.00 | Identified for Further Review |
GA | Georgia PDMC18 Portable Generator Application | $543,751.50 | Identified for Further Review |
GA | PDM 2018 Management Grant | $54,375.00 | Identified for Further Review |
HI | State of Hawaii Emergency Management Agency | $56,607.75 | Did Not Meet HMA Requirements |
HI | High Resolution Numerical Simulation of April 2018 Flooding at Kauai & Oahu | $297,167.00 | Did Not Meet HMA Requirements |
HI | Hawaii County: Integration of Climate Change Adaption Plan into Mitigation Plan | $75,000.00 | Did Not Meet HMA Requirements |
HI | Analysis to Establish Research-Based Shoreline and Riparian Setbacks for Hawaii | $146,225.00 | Did Not Meet HMA Requirements |
HI | Mauna Kea Fire Mitigation Project | $217,500.00 | Did Not Meet HMA Requirements |
HI | Unv. of Hawaii: Hurricane/Cyclone Return Period & Intensity Study | $225,749.00 | Did Not Meet HMA Requirements |
Hoh Indian Tribe | Hoh Indian Tribe Pre-Disaster Mitigation Planning Grant 2019 | $90,000.00 | Identified for Further Review |
Hydaburg Cooperative Association | Hydaburg Cooperative Association PDMC 18 Grant Sub-Application: High Wind Damage | $232,200.00 | Identified for Further Review |
Hydaburg Cooperative Association | Advanced Assistance - PDMC18.HCA.Tsunami Evac. Proj. | $147,375.00 | Identified for Further Review |
Hydaburg Cooperative Association | Hydaburg Cooperative Association PDMC 18 Grant Application.Project Mgmt. Sub-App | $37,957.00 | Identified for Further Review |
IA | State of Iowa PDM 2018 Management Cost | $845,758.00 | Identified for Further Review |
IA | Des Moines County Multi-Jurisdictional Hazard Mitigation Plan Update | $11,700.00 | Identified for Further Review |
IA | Harrison Shelby Joint Hazard Mitigation Plan | $30,186.00 | Identified for Further Review |
IA | Sioux, O'Brien and Osceola County Multijurisdictional HM Plan Update | $56,250.00 | Identified for Further Review |
IA | TIP Mitigation for Electric Distribution Lines | $443,286.00 | Identified for Further Review |
IA | State of Iowa PDM 2018 Advanced Assistance | $196,976.00 | Identified for Further Review |
IA | City of Ames Squaw Creek Resilient Infrastructure Flood Mitigation Project | $3,747,450.00 | Identified for Further Review |
IA | Cedar Rapids Gatewell Structures Flood Mitigation Project | $862,946.00 | Not Selected |
IA | Butler County REC 2018 PDM Infrastructure Strengthening | $837,000.00 | Not Selected |
IA | West Fork CSD Middle School Safe Room | $909,786.00 | Not Selected |
IA | Dike-New Hartford Tornado Safe Room, Wrestling Room, Weight Room | $707,411.00 | Not Selected |
IA | RRMU Generator Project - Water Treatment Plant | $80,558.00 | Did Not Meet HMA Requirements |
IA | BSA Mitigwa Scout Camp Safe Rooms Project | $401,448.00 | Did Not Meet HMA Requirements |
ID | Bannock County Multi-Jurisdictional All Hazard Mitigation Plan | $67,399.59 | Identified for Further Review |
ID | 2018 PDM State of Idaho MTA | $57,450.00 | Identified for Further Review |
ID | City of Eagle Pathway Mitigation Project | $679,493.80 | Identified for Further Review |
ID | Lemhi County Multi-Jurisdiction Hazard Mitigation Plan Update | $26,063.00 | Identified for Further Review |
ID | Driggs Liftstation Generator Project | $53,456.25 | Not Selected |
ID | Teton EOC Generator PDM18 | $127,500.00 | Not Selected |
ID | Wendell Highway District, 2018 Niagara Springs Grade Hazard Mitigation | $123,543.75 | Did Not Meet HMA Requirements |
ID | City of Weippe Flood Mitigation along Grasshopper Creek | $329,258.70 | Did Not Meet HMA Requirements |
ID | City of Cottonwood Culvert Relocation Project | $2,947,065.00 | Did Not Meet HMA Requirements |
IN | Camp ToPeNeBee Shelter Plan | $458,325.00 | Identified for Further Review |
IN | Indiana County MHMP Updates - PDMC 18 | $291,867.00 | Identified for Further Review |
IN | Salem High School Safe Room | $3,879,644.25 | Identified for Further Review |
IN | City of Decatur 2018 PDM Flood Acquisition Project | $660,204.00 | Identified for Further Review |
IN | Morgan Co Acq PDMC 2018 | $1,820,550.00 | Identified for Further Review |
IN | City of Greenwood 2018 PHMG | $2,690,826.18 | Identified for Further Review |
IN | City of Fort Wayne 2018 Flood Acquisition Project | $347,424.00 | Identified for Further Review |
IN | Salem Middle School Safe Room | $3,614,700.00 | Identified for Further Review |
IN | St. Joseph County Floodplain Home Buyout Program | $2,199,580.49 | Identified for Further Review |
IN | Indiana Management Cost Application - PDMC 18 | $1,596,312.00 | Identified for Further Review |
Karuk Tribe | Happy Camp Wellness Center | $98,995.00 | Did Not Meet HMA Requirements |
Karuk Tribe | Family Service Center | $80,969.00 | Did Not Meet HMA Requirements |
Karuk Tribe | Kingfisher Market | $80,969.00 | Did Not Meet HMA Requirements |
Karuk Tribe | Yreka Housing Tribal Programs Office | $80,969.25 | Did Not Meet HMA Requirements |
Karuk Tribe | Wellness Center, Yreka | $80,969.00 | Did Not Meet HMA Requirements |
Karuk Tribe | Happy Camp Fencing Replacement | $45,299.00 | Did Not Meet HMA Requirements |
Karuk Tribe | Orleans Housing Fence Replacement | $67,949.00 | Did Not Meet HMA Requirements |
Karuk Tribe | Management Cost | $38,868.00 | Did Not Meet HMA Requirements |
KS | City of Harper Safe Room | $354,974.25 | Identified for Further Review |
KY | Lewis County Landslide Acquisition (38.575909 -83.325257) | $183,018.00 | Identified for Further Review |
KY | Multi-Jurisdictional Hazard Mitigation Plan for Karst for the LTADD | $293,994.01 | Identified for Further Review |
KY | PDM 2018 Management Costs - Kentucky | $1,170,973.00 | Identified for Further Review |
KY | FIVCO ADD Regional Multihazard Mitigation Plan | $100,000.00 | Not Selected |
KY | Bluegrass Area Development District Regional Hazard Mitigation Plan Update | $150,000.00 | Not Selected |
KY | Louisville MSD - 2018 PDM Waldoah Beach | $842,683.87 | Not Selected |
KY | Louisville Metro Hazard Mitigation Plan Update PDM 2018 | $137,985.00 | Not Selected |
KY | University of Kentucky Hazard Mitigation Plan Update PDM 2018 | $199,221.00 | Not Selected |
KY | Western Kentucky University Pre-Disaster Mitigation | $175,392.00 | Not Selected |
KY | Adams Ridge Road Elevation Project | $2,625,000.00 | Not Selected |
KY | Menifee County Rockfall Mitigation 2 | $3,999,900.00 | Did Not Meet HMA Requirements |
KY | Menifee County Rockfall Mitigation | $3,000,000.00 | Did Not Meet HMA Requirements |
KY | Hillaire Drive Hazard Mitigation Project | $129,307.97 | Did Not Meet HMA Requirements |
LA | GOHSEP Statewide Planning Application (1 of 2) | $284,998.50 | Identified for Further Review |
LA | GOHSEP Statewide Planning Application (2 of 2) | $284,998.50 | Identified for Further Review |
LA | Advance Assistance - Street Level Imagery in St. Tammany Parish | $200,000.00 | Identified for Further Review |
LA | Terrebonne Hazard Mitigation Plan Update 2020 | $65,108.00 | Identified for Further Review |
LA | Terrebonne Parish 2018 PDM St. Louis Canal Road (Westside/Alma) Drainage | $1,334,477.57 | Identified for Further Review |
LA | GOHSEP PDM SMC FY2018 Application | $998,503.62 | Identified for Further Review |
LA | Jefferson Parish/Gretna 25th Street Resilient Infrastructure Project - FY18 PDM | $10,000,000.00 | Not Selected |
LA | Livingston Parish Fire Protection District #4 - Safe Room Project | $847,097.25 | Not Selected |
LA | Jean Lafitte PDM-E | $1,734,943.50 | Not Selected |
LA | Jean Lafitte PDM-R | $652,755.84 | Not Selected |
LA | JP PDM 2018 - Second Harvest Food Bank Wind Retrofit | $856,000.00 | Did Not Meet HMA Requirements |
LA | LUMCON Pre-Disaster Mitigation Grant | $1,748,219.77 | Did Not Meet HMA Requirements |
LA | Iberville Parish Flood Barrier Wall | $2,439,039.75 | Did Not Meet HMA Requirements |
LA | Oysterbed Surge Protection and Floodplain Restoration | $3,999,378.00 | Did Not Meet HMA Requirements |
Leech Lake Band Of Ojibwe | Advanced Assistance for Leech Lake Energy Resilient Response and Recovery | $180,100.50 | Did Not Meet HMA Requirements |
MA | 2018 PDM Local Multi Jurisdictional Planning Grant Massachusetts | $243,581.00 | Identified for Further Review |
MA | South Branch Parkway Drainage Improvements | $550,000.11 | Identified for Further Review |
MA | Town of Conway - Delabarre Avenue Erosion Repair | $261,461.25 | Identified for Further Review |
MA | City of Boston Resilient Fort Point Channel Infrastructure Project | $9,999,999.99 | Identified for Further Review |
MA | Town of Clinton FMA Advance Assistance Project | $99,930.00 | Identified for Further Review |
MA | Advance Assistance: Moon Island/Causeway: Developing a Mitigation Plan | $75,000.00 | Identified for Further Review |
MA | 2018 PDM State Management Costs - Massachusetts | $942,000.69 | Identified for Further Review |
MA | GLSD Riverside Pump Station Emergency Generator, North Andover, MA | $2,677,500.00 | Not Selected |
MA | Quincy, MA Coastal Flood Mitigation | $2,138,250.00 | Did Not Meet HMA Requirements |
Makah Tribe | Makah Tribal Hazard Mitigation Plan Update | $134,881.20 | Identified for Further Review |
Massachuets | Wildfire Planning for Dukes County Mitigation Plan Update | $22,500.00 | Did Not Meet HMA Requirements |
Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians | Gun Lake Tribe Mitigation Plan | $49,852.50 | Identified for Further Review |
MD | Town of Hebron Generator for Water Tower 201 Culver Street | $78,375.00 | Identified for Further Review |
MD | Acquisition of Multi-Structure Chester River Beach Property for Flood Mitigation | $171,431.25 | Identified for Further Review |
MD | FY18 PDM MEMA Management Cost | $1,147,872.47 | Identified for Further Review |
MD | Canal Woods Flood Mitigation Project | $75,000.00 | Not Selected |
MD | Baltimore County Hazard Mitigation Update Plan | $36,415.57 | Not Selected |
MD | Frederick County, MD MultiJurisdictional Hazard Mitigation Plan Update | $112,500.00 | Not Selected |
MD | Kent County Maryland, Hazard Mitigation Plan Update | $70,875.00 | Not Selected |
MD | Crisfield Tide Gates, Culvert Modification, and Pumping Stations | $1,241,526.60 | Not Selected |
MD | Back-up Power Generator, Ground Water Treatment Plant, Port of Baltimore | $181,013.25 | Did Not Meet HMA Requirements |
MD | Pratt Road Watershed Drainage Project - Phase 1 | $42,618.74 | Did Not Meet HMA Requirements |
MD | Queen Annes Generator Project | $42,750.00 | Did Not Meet HMA Requirements |
MD | Eastern Shore Innovation Center - Generator Project | $41,414.25 | Did Not Meet HMA Requirements |
MD | Thurmont Municipal Building Generator | $29,625.00 | Did Not Meet HMA Requirements |
MD | Resilient Infrastructure- H7 Dry Flood Mitigation Facility | $3,600,000.00 | Did Not Meet HMA Requirements |
MD | Church/Emory Street Drain Improvements | $900,000.00 | Did Not Meet HMA Requirements |
MD | Mullen Avenue Landslide, Luke, MD | $512,436.40 | Did Not Meet HMA Requirements |
MD | Maryland Avenue Culverts | $2,925,000.00 | Did Not Meet HMA Requirements |
MD | City of Gaithersburg Pre-Disaster Mitigation Project | $1,436,427.25 | Did Not Meet HMA Requirements |
MD | Acquisition of River Beach Property to Mitigate Against Flood Impact | $273,545.58 | Did Not Meet HMA Requirements |
ME | Town of Houlton Morningstar Road Culvert Replacement/Upsizing | $585,000.00 | Identified for Further Review |
ME | Advance Assistance Machias Flood Protection | $200,000.00 | Identified for Further Review |
ME | 2018 Maine PDM Grant | $79,899.00 | Identified for Further Review |
MI | County of Allegan; Multi Hazard Mitigation Plan Update | $25,750.00 | Identified for Further Review |
MI | Update Hazard Mitigation Plans- Alger, Delta, Menominee & Schoolcraft Counties | $58,500.00 | Identified for Further Review |
MI | Hazard Mitigation Plan Update, City of Detroit | $51,840.00 | Identified for Further Review |
MI | GLS Region V mitigation plan updates - Genesee & Lapeer | $117,187.17 | Identified for Further Review |
MI | TRI-COUNTY REGIONAL HAZARD MITIGATION PLAN | $164,910.00 | Identified for Further Review |
MI | Jackson County Hazard Mitigation Plan Update | $34,477.00 | Identified for Further Review |
MI | County of Newaygo Hazard Management Plan Project | $46,861.39 | Identified for Further Review |
MI | City of Lansing 2018 HMA Floodplain Acquisition and Demolition | $507,307.00 | Identified for Further Review |
MI | Lakeshore Boulevard Coastal Resilient Infrastructure Project | $2,025,000.00 | Identified for Further Review |
MI | State of Michigan-FY 2018 PDM Management Cost | $251,781.00 | Identified for Further Review |
MI | Lakeshore Boulevard Coastal Flood Mitigation Project | $2,025,000.00 | Not Selected |
MI | Estral Beach 2019 PDM 5 Home Elevation grant | $397,482.75 | Did Not Meet HMA Requirements |
MITW | MITW Pre Disaster Mitigation Grant | $516,819.26 | Did Not Meet HMA Requirements |
MN | 2019 expiring plans | $154,500.00 | Identified for Further Review |
MN | 2020 plan updates | $294,000.00 | Identified for Further Review |
MN | City of Newport Advanced Assistance | $28,980.00 | Identified for Further Review |
MN | Highbanks Neighborhood Mitigation | $2,388,580.00 | Did Not Meet HMA Requirements |
MN | COL City of Blaine Safe Room | $1,506,569.40 | Did Not Meet HMA Requirements |
MO | PDM FY18 - Mo. State Allocations Project-S. Pemiscot R-5 School Dist. Safe Room | $574,992.00 | Identified for Further Review |
MO | FY18PDM Competitive Priorities Local MultiJur MultiHazard Mitigation PlngUpdates | $228,121.50 | Identified for Further Review |
MO | PDMFY18 Competitive Priorities - City of Truesdale Safe Room | $1,682,883.00 | Identified for Further Review |
MO | PDM FY18 Competitive Priorities - Potosi R-III School District-Elem. Safe Room | $1,462,500.00 | Identified for Further Review |
MO | PDM FY18 Competitive Priorities-Rockwood R-VI / Wildwood MIddle Sch Safe Room | $1,218,750.00 | Identified for Further Review |
MO | PDM FY18 Competitive Priorities - Hickory Co R-I School District Comm. Safe Room | $1,536,975.00 | Not Selected |
MO | PDM FY18 Competitive Priorities - Woodland R-4 School District Safe Room | $2,070,000.00 | Not Selected |
MO | PDM FY18 Competitive Priorities - Hartville R-II Safe Room | $2,025,000.00 | Not Selected |
MO | PDM FY18 Competitive Priorities - Summersville R-II Community Safe Room | $1,004,400.00 | Not Selected |
MO | PDM FY18 Competitive Priorities - City of Clarksdale Comm. Safe Room | $702,000.00 | Not Selected |
MO | PDM FY18 Resilient Infrastructure Grundy Electric | $1,209,000.00 | Did Not Meet HMA Requirements |
MP | Saipan Office on Aging Storm Readiness Project | $120,505.00 | Identified for Further Review |
MP | Rota Guesthouse Storm Readiness Project- PDM FY18 | $113,605.00 | Identified for Further Review |
MP | CNMI FY18 Pre-Disaster Mitigation | $99,446.00 | Identified for Further Review |
MP | FY18 CNMI PDM Management Cost | $48,355.58 | Identified for Further Review |
MP | Disaster Risk Reduction Planning Update-Garapan District | $150,000.00 | Did Not Meet HMA Requirements |
MS | Forrest Heights Levee Project | $4,000,000.38 | Did Not Meet HMA Requirements |
MT | Montana Region 5 MHMP Update | $199,999.98 | Identified for Further Review |
MT | Dawson County PDM Planning | $100,000.00 | Identified for Further Review |
MT | State of Montana PDM Management Costs 2018 | $64,014.75 | Identified for Further Review |
MT | Ninemile Creek Mitigation Project | $1,200,000.00 | Identified for Further Review |
MT | City of Great Falls Missouri River Shoreline Mitigation Project 2018 | $340,151.85 | Did Not Meet HMA Requirements |
Native Village of Eagle | Evacuation route PS&E | $111,000.00 | Did Not Meet HMA Requirements |
Native Village of Eagle | Wildfire mitigation | $63,880.00 | Did Not Meet HMA Requirements |
Native Village of Eagle | Eagle AK HMP update | $34,725.00 | Did Not Meet HMA Requirements |
Native Village of Eyak | Eyak Village Infrastructure Pre-Disaster Resiliency Project | $409,766.80 | Did Not Meet HMA Requirements |
Native Village of Klut Kaah | Kluti-Kaah Memorial Hall Seismic and Clean air retrofit. | $41,010.00 | Identified for Further Review |
Native Village of Klut Kaah | Copper River Erosion Project | $60,880.00 | Identified for Further Review |
Native Village of Klut Kaah | 2019-2022 Hazardous Fuel & Wildfire Management Plan | $267,162.00 | Did Not Meet HMA Requirements |
Native Village of Shaktoolik | Advanced Assistance: Shaktoolik Environmental Hazard Strategy Development | $193,650.00 | Identified for Further Review |
ND | City of Beulah Storm Shelter | $73,946.25 | Identified for Further Review |
ND | McKenzie County Storm Shelters | $88,149.75 | Identified for Further Review |
ND | City of Mandan Emergency Generators Project | $358,875.00 | Identified for Further Review |
ND | Grand Forks County MHMP Update | $46,987.00 | Identified for Further Review |
ND | Stutsman County Multi-Hazard Mitigation Plan Update | $29,700.00 | Identified for Further Review |
ND | Richland County MHMP | $35,400.00 | Identified for Further Review |
ND | McKenzie County MHMP Update | $34,800.00 | Identified for Further Review |
ND | Barnes County MHMP Update | $27,000.00 | Identified for Further Review |
ND | Bottineau County MHMP Update | $32,482.00 | Identified for Further Review |
ND | Ransom County MHMP Update | $24,500.00 | Identified for Further Review |
ND | Sargent County MHMP | $30,000.00 | Identified for Further Review |
ND | Nelson County MHMP Update | $23,500.00 | Identified for Further Review |
ND | Kidder County MHMP Update | $16,000.00 | Identified for Further Review |
ND | Towner County MHMP Update | $26,400.00 | Identified for Further Review |
ND | ND Resilient Infrastructure Project - Fargo Pump Station Flood Mitigation | $4,311,502.50 | Identified for Further Review |
ND | University of Mary Slope Stability Project - Phase II | $3,965,216.85 | Identified for Further Review |
ND | City of Fargo WWTP Flood Protection Plan | $3,679,792.50 | Identified for Further Review |
ND | City of Jamestown James River Riverbank Restoration Project | $831,921.73 | Identified for Further Review |
ND | 2018 PDM State Management Costs | $1,543,183.00 | Identified for Further Review |
ND | Unity Medical Center - 2018 Generator Project | $446,990.00 | Not Selected |
ND | Tri-County Water District Reservoir Generators | $196,920.00 | Not Selected |
ND | McIntosh County Generators | $81,173.92 | Not Selected |
ND | 2018 PDM NDDES Critical Facility Generators | $1,007,947.19 | Did Not Meet HMA Requirements |
ND | Kirkelie Township Bank Stabilization Project | $62,625.00 | Did Not Meet HMA Requirements |
NE | Perkins, Chase, and Dundy Counties Multi-Jurisdiction Hazard Mitigation Plan | $40,717.50 | Identified for Further Review |
NE | Region 23 HMP Update | $47,250.00 | Identified for Further Review |
NE | Nemaha Natural Resources District Hazard Mitigation Plan Update | $101,850.00 | Identified for Further Review |
NE | Cedar and Dixon Counties Multihazard Mitigation Plan Update | $71,250.00 | Identified for Further Review |
NE | Papio-Missouri River Natural Resources District Hazard Mitigation Plan | $150,000.00 | Identified for Further Review |
NE | Twin Platte Natural Resources District Multihazard Mitigation Plan Update | $55,125.00 | Identified for Further Review |
NE | Quad County Hazard Mitigation Plan Update | $48,750.00 | Identified for Further Review |
NE | Lower Big Blue/Little Blue NRD Multi-hazard Mitigation Plan Update | $225,000.00 | Not Selected |
NE | Central City Safe Room | $2,707,473.42 | Not Selected |
NE | 2018 Adams County Little Blue River Bank Stabilization Projects | $566,877.75 | Not Selected |
NE | Forest Lake Boulevard Drainage Improvement Project | $486,000.00 | Not Selected |
NE | Imperial Community Safe Room Project | $878,199.50 | Did Not Meet HMA Requirements |
Newtok Village Council | 2020 Resilient Home Mitigation | $1,215,580.00 | Identified for Further Review |
Newtok Village Council | 2020 Resilient Water Systems | $3,679,934.00 | Identified for Further Review |
NH | FFY 2018 Local Hazard Mitigation Plan Updates | $163,499.25 | Identified for Further Review |
NH | FFY 2018 Local Hazard Mitigation Plan Updates_2 | $173,999.25 | Identified for Further Review |
NH | Town of Salem - Main Street & South Broadway | $3,172,500.00 | Identified for Further Review |
NH | FFY 2018 State of NH Management Costs | $325,143.21 | Identified for Further Review |
NH | Town of Plymouth, NH - Loon Lake Road Flood Mitigation Project | $380,273.25 | Not Selected |
NH | Hollis Rocky Pond Road Well Generator | $61,350.00 | Not Selected |
NH | Surry Pond Road Culvert Project | $148,875.00 | Did Not Meet HMA Requirements |
NH | Town of Lee Tuttle Road Project | $234,750.00 | Did Not Meet HMA Requirements |
NJ | Gloucester County Pre-Disaster Mitigation Planning Grant 2018 | $125,000.00 | Identified for Further Review |
NJ | Cumberland County Pre-Disaster Mitigation Planning Grant 2018 | $125,000.00 | Identified for Further Review |
NJ | Cape May County Multi-Jurisdictional All Hazards Mitigation Plan Update | $125,000.00 | Identified for Further Review |
NJ | Warren County Mitigation Plan | $125,000.00 | Identified for Further Review |
NJ | Sussex County Multi-Juridictional All-Hazard Mitigation Update | $124,998.50 | Identified for Further Review |
NJ | City of Lambertville Swan Creek Embankment Erosion Mitigation Project 2 | $345,000.00 | Identified for Further Review |
NJ | H6-H7 Stormwater System Hoboken NJ | $4,000,000.00 | Identified for Further Review |
NJ | Atlantic City Flood Control | $3,596,088.97 | Identified for Further Review |
NJ | Exton Road Pump Station PDM | $287,887.50 | Identified for Further Review |
NJ | Northwest Hoboken Resilient Infrastructure Park | $10,000,000.00 | Identified for Further Review |
NJ | NJOEM - PDM Advanced Assistance 2018 | $199,999.91 | Identified for Further Review |
NJ | 2018 PDM State Management Costs | $7,744,549.35 | Identified for Further Review |
NJ | 5th Street Pumping Station Mitigation Hoboken NJ | $1,338,750.00 | Not Selected |
NJ | Windsor Avenue Elevation | $1,606,500.00 | Did Not Meet HMA Requirements |
NJ | Seaside Heights Flood Mitigation Project (Water Treatment Plant) | $1,317,997.75 | Did Not Meet HMA Requirements |
NJ | Rehabilitation of Greenbriar I Wastewater Pump Station | $186,825.00 | Did Not Meet HMA Requirements |
NM | Lea County Mitigation Plan Update | $52,350.00 | Identified for Further Review |
NM | Luna County Mitigation Plan Update | $41,250.00 | Identified for Further Review |
NM | Curry County Mitigation Plan Update | $48,750.00 | Identified for Further Review |
NM | Valencia County Mitigation Plan Update | $56,250.00 | Identified for Further Review |
NM | Village of Pecos Generator Project | $50,362.50 | Identified for Further Review |
NM | Belen Aragon Pond Advanced Assistance | $199,929.00 | Identified for Further Review |
NM | State Management Costs | $377,158.21 | Identified for Further Review |
NM | Lower Montoyas Arroyo Bank Stabilization Flood Mitigation | $3,238,690.68 | Identified for Further Review |
NM | Quay County Generator Project | $84,000.00 | Did Not Meet HMA Requirements |
Northern Cheyenne Tribe | Northern Cheyenne Pre-Disaster Mitigation Plan Update | $150,000.00 | Identified for Further Review |
NV | Reno Purchasing Warehouse Emergency Generator Project | $575,000.00 | Identified for Further Review |
NV | Hobart Reservoir Dam Advance Assistance | $198,149.34 | Identified for Further Review |
NV | Marlette Lake Dam Resilient Infrastructure Project | $10,000,000.00 | Identified for Further Review |
NV | PDM 2018 NDEM Management Costs | $1,474,814.93 | Identified for Further Review |
NV | City of Reno City Hall Seismic Retrofits | $3,975,000.00 | Did Not Meet HMA Requirements |
NY | PDM Acquisition #1 on Lovers Lane in Town of New Albion | $304,500.00 | Identified for Further Review |
NY | Erie County Multi-Jurisdictional Hazard Mitigation Plan Update (PDM) | $225,000.00 | Identified for Further Review |
NY | NYCHA Flooding Risk Reduction Project, NYC,PDM Advance Assistance 904.2 | $198,719.25 | Identified for Further Review |
NY | PDM/Resilient Infrastructure by NYSDOT: Interstate 88 over Schoharie Creek | $5,046,544.50 | Identified for Further Review |
NY | Livingston County Multi Jurisdictional All Hazards Mitigation Plan | $67,500.00 | Identified for Further Review |
NY | PDM by NYSDOT: US 9 over Ausable River - Clinton County | $3,606,892.50 | Identified for Further Review |
NY | St. Lawrence County NY Multi-Jurisdictional All Hazard Mitigation Plan | $225,000.00 | Identified for Further Review |
NY | Westchester County Multi-jurisdictional Hazard Mitigation | $172,500.00 | Identified for Further Review |
NY | Franklin County Multi-Jurisdictional Hazard Mitigation Plan Update | $48,750.00 | Identified for Further Review |
NY | Chenango County All Hazards Multi-Jurisdictional Mitigation Plan | $112,500.00 | Identified for Further Review |
NY | NYSDHSES PDM Management Cost Application | $1,383,468.00 | Identified for Further Review |
NY | FY18 PDM NYC DOE Emergency Power for 6 Schools | $3,568,970.25 | Not Selected |
NY | PDM Village/Town of Mount Kisco Branch Brook Hydrology Study Advance Assistance | $112,500.00 | Did Not Meet HMA Requirements |
NY | Village of Deposit Flood Mitigation Study - Advance Assistance | $112,500.00 | Did Not Meet HMA Requirements |
NY | PDM Advance Assistance V Newark Valley Slosson Creek, Cook Street Hydraulic Eval | $32,812.50 | Did Not Meet HMA Requirements |
OH | Miamisburg Fourth Street Sycamore Creek Mitigation Project | $190,350.00 | Identified for Further Review |
OH | Village of Ottawa Ohio PDM Acquisition Project | $347,550.00 | Identified for Further Review |
OH | Ohio Safe Room Rebate Program PDM 18 (Set-A-Side) | $37,100.00 | Identified for Further Review |
OH | City of Rittman Advance Assistance Landis Ditch Study PDM18 | $112,100.00 | Identified for Further Review |
OH | Village of Valley View 2018 PDM Project | $1,545,562.50 | Identified for Further Review |
OH | State of Ohio PDM 2018 Management Cost Application | $420,875.37 | Identified for Further Review |
OH | City of Lancaster OH Miller Park Emergency Generator Project | $48,000.00 | Not Selected |
OH | St. Marys Residential PDM Project | $1,496,290.53 | Not Selected |
OH | Lateral B Stream Restoration | $430,618.50 | Did Not Meet HMA Requirements |
OK | City of Tulsa Fulton Creek Flood Control - Advanced Assistance | $150,000.00 | Identified for Further Review |
OK | OEM SoonerSafe ISR Phase 24 | $574,500.00 | Identified for Further Review |
OK | PDM FFY 2018 SMC | $14,796.00 | Identified for Further Review |
OR | OMD-OEM State Management Cost | $336,787.50 | Identified for Further Review |
OR | NHMP Updates - Coos, Curry, and Wallowa Counties and the City of Sweet Home, OR | $300,000.00 | Identified for Further Review |
OR | City of Portland Mitigation Action Plan Update | $150,000.00 | Identified for Further Review |
OR | Advance Assistance Basin G2 Drainage Planning, Wheeler, Oregon | $119,371.50 | Identified for Further Review |
OR | City of Reedsport Resilient Infrastructure | $4,000,000.00 | Identified for Further Review |
OR | City of Ashland Wildfire Mitigation Project | $3,000,000.00 | Identified for Further Review |
OR | Seismic Retrofit of Sanitary Sewer Pipe Aerial Crossings on Johnson Creek | $422,775.00 | Did Not Meet HMA Requirements |
PA | Lackawanna County Hazard Mitigation Plan Update | $39,000.00 | Identified for Further Review |
PA | Washington County Mitigation Plan Update 2020 | $42,600.00 | Identified for Further Review |
PA | County Hazard Mitigation Plan Update | $37,875.00 | Identified for Further Review |
PA | County of Chester Hazard Mitigation Plan Update | $56,250.00 | Identified for Further Review |
PA | Venango County | $37,500.00 | Identified for Further Review |
PA | Lawrence County Hazard Mitigation Plan Update | $44,400.00 | Identified for Further Review |
PA | Lycoming County Hazard Mitigation Plan 2020 | $45,000.00 | Identified for Further Review |
PA | Warren County Hazard Mitigation Plan Update | $37,500.00 | Identified for Further Review |
PA | Centre County Hazard Mitigation Plan Update | $50,250.00 | Identified for Further Review |
PA | Dauphin County-Wide All-Hazards Mitigation Plan | $56,250.00 | Identified for Further Review |
PA | Bucks County Hazard Mitigation Plan Update | $60,000.00 | Identified for Further Review |
PA | Carbon County, Pennsylvania | $45,000.00 | Identified for Further Review |
PA | 2018 PDM Management Cost | $412,500.00 | Identified for Further Review |
PA | Advanced Assistance Upper Delaware River and Lackawaxen Watershed Mitigation | $100,000.00 | Identified for Further Review |
PA | HMA 2018 Advanced Assistance Silver Creek Corridor Flood Reduction Study/Design | $75,000.00 | Identified for Further Review |
PA | Resilient Infrastructure Luzerne County Closure Structure Mitigation | $813,900.00 | Identified for Further Review |
PA | West Mead Township Generator | $26,595.00 | Not Selected |
PA | PDM 2018 Shamokin Coal Township Sewer Mitigation | $711,000.00 | Not Selected |
PA | LTMA Standby Generators For Three Sewage Pump Stations | $202,500.00 | Not Selected |
PA | White Township and Indiana Borough Flood Mitigation Projects | $1,489,875.00 | Did Not Meet HMA Requirements |
PA | Ligonier Township Linn Run Flood Mitigation Project | $333,000.00 | Did Not Meet HMA Requirements |
PA | Bethel Park Flood Mitigation Project | $693,750.00 | Did Not Meet HMA Requirements |
PA | Coffeetown Road Infrastructure Mitigation | $187,794.74 | Did Not Meet HMA Requirements |
PA | NCEMA Generator and Lugs | $102,186.16 | Did Not Meet HMA Requirements |
Pala Band of Mission Indians | Pala Flood Mitigation Planning Advance Assistance | $127,320.00 | Identified for Further Review |
Pala Band of Mission Indians | Pala Hazard Mitigation Plan Update | $65,658.35 | Identified for Further Review |
Pala Band of Mission Indians | Pala Management Costs | $7,575.00 | Identified for Further Review |
Pokagon Band of Potawatomi | Pokagon Band Tribal Mitigation Planning Project | $30,060.00 | Identified for Further Review |
Pueblo of Pojoaque | Pueblo of Pojoaque, Pre-Disaster Planning Project | $204,963.00 | Did Not Meet HMA Requirements |
Puyallup Tribe of Indians | Puyallup Tribe of Indians Pre-Disaster Mitigation Grant Application | $117,000.00 | Did Not Meet HMA Requirements |
Pyramid Lake Paiute Tribe | Mitigation Grant 2019 PLPT | $199,456.00 | Identified for Further Review |
Quapaw Tribe of Oklahoma | OLC Safe Room | $573,187.00 | Identified for Further Review |
Quapaw Tribe of Oklahoma | Advance Assistance - Safe Room Planning | $115,843.00 | Identified for Further Review |
Quapaw Tribe of Oklahoma | 2018 PDM M&A | $67,676.00 | Identified for Further Review |
Quinault Indian Nation | Taholah - Aalis Dr Realignment Planning | $112,500.00 | Identified for Further Review |
Quinault Indian Nation | Fire Station - Generator | $29,023.50 | Did Not Meet HMA Requirements |
Quinault Indian Nation | Queets Clinic - Generator | $29,023.50 | Did Not Meet HMA Requirements |
Quinault Indian Nation | RSHC - DIVVY | $19,387.50 | Did Not Meet HMA Requirements |
Red Cliff Band of Lake Superior Chippewa | Hazard Mitigation Plan - new | $84,524.43 | Identified for Further Review |
RI | 93.1 - Local Hazard Mitigation Plan Update | $25,264.99 | Identified for Further Review |
RI | RI Management Costs | $57,504.00 | Identified for Further Review |
RI | Narragansett Scarborough Wastewater Treatment Facility Groin Rehabilitation | $1,075,832.15 | Did Not Meet HMA Requirements |
RI | BHDDH - Generator for Group Homes | $150,000.00 | Did Not Meet HMA Requirements |
RI | Newport RI Advanced Modeling and Simulation Technology | $150,000.00 | Did Not Meet HMA Requirements |
Sac and Fox of Missouri | Sac and Fox Storm Shelters | $125,047.50 | Did Not Meet HMA Requirements |
Sac and Fox Tribe of the Mississippi | Cattail Creek Drainage Basin Advance Assistance | $178,964.43 | Identified for Further Review |
Samish Indian Nation | Samish Multi-Hazard Mitigation Plan | $82,941.94 | Identified for Further Review |
Samish Indian Nation | Samish Multi-Hazard Mitigation Plan Management Costs | $3,522.53 | Identified for Further Review |
San Manuel Band of Mission Indians | Energy Storage System (ESS)/Generator San Manuel Indian Reservation | $575,000.00 | Did Not Meet HMA Requirements |
Sandia Pueblo | Pueblo of Sandia Hazard Mitigation Plan | $78,093.75 | Identified for Further Review |
Sandia Pueblo | Pueblo of Sandia Hazard Mitigation Plan Management Costs | $7,809.37 | Identified for Further Review |
SC | Hazard Mitigation Plan Update for Beaufort, Colleton, Hampton, Jasper Counties | $35,358.79 | Identified for Further Review |
SC | Lower Savannah Regional Multihazard Mitigation Plan | $78,208.30 | Identified for Further Review |
SC | City of Myrtle Beach FMP Update | $44,191.50 | Identified for Further Review |
SC | Town of Nichols - Elevation Project | $287,970.00 | Identified for Further Review |
SC | City of Tega Cay, City Hall Generator | $51,502.50 | Identified for Further Review |
SC | SHMP Update - Critical Infrastructure Mapping | $210,929.24 | Identified for Further Review |
SC | Moncks Corner Acquisition Project | $1,514,947.50 | Identified for Further Review |
SC | SC PDM 2018 Management Cost | $567,111.00 | Identified for Further Review |
SC | Colleton County Special Medical Needs Project | $270,000.00 | Not Selected |
SC | Aiken County Pre-Hazard Mitigation Project | $225,000.00 | Did Not Meet HMA Requirements |
SC | City of Simpsonville Generator Grant | $171,120.00 | Did Not Meet HMA Requirements |
SC | Mount Pleasant Generator | $365,565.00 | Did Not Meet HMA Requirements |
SC | Town of James Island Mitigation Grant | $215,253.00 | Did Not Meet HMA Requirements |
SC | City of Folly Beach Water Resilience Project | $2,303,664.75 | Did Not Meet HMA Requirements |
SD | Aurora County Safe Rooms Project | $118,875.00 | Identified for Further Review |
SD | City of Brookings Structure Acquisition Project | $147,525.00 | Identified for Further Review |
SD | Stanley County Acquisition Project, Moore Property | $226,419.42 | Identified for Further Review |
SD | Aurora County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Jones County PDM Plan Update | $13,125.00 | Identified for Further Review |
SD | Moody County PDM Plan Update | $11,936.25 | Identified for Further Review |
SD | Grant County PDM Plan Update | $13,905.00 | Identified for Further Review |
SD | Charles Mix County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Lyman County PDM Plan Update | $7,500.00 | Identified for Further Review |
SD | Jerauld County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Hutchinson County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Bon Homme County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Davison County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Douglas County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Brule County PDM Plan Update | $6,000.00 | Identified for Further Review |
SD | Armour Storm Water Collector Evaluation (Advanced Assistance) | $22,500.00 | Identified for Further Review |
SD | PDM 2018 Management Cost | $111,388.50 | Identified for Further Review |
SD | City of Waubay Safe Room | $504,104.25 | Identified for Further Review |
Seminole Tribe of Florida | Seminole Tribe of Florida All Hazard Mitigation Plan Update | $150,692.57 | Identified for Further Review |
Seminole Tribe of Florida | Seminole Tribe of Florida Forestry and Wildland Program | $278,938.97 | Identified for Further Review |
Shoalwater Bay Indian Tribe | Water Tower Retrofit | $37,464.30 | Did Not Meet HMA Requirements |
Shoalwater Bay Indian Tribe | Generator Backup Systems Final | $361,386.00 | Did Not Meet HMA Requirements |
Soboba Band of Luiseno Indians | Water Conveyance Project | $576,000.00 | Did Not Meet HMA Requirements |
Soboba Band of Luiseno Indians | Water Conveyance Project | $57,600.00 | Did Not Meet HMA Requirements |
Swinomish Indian Tribal Community | Advance Assistance for Swinomish Tribe Pre-Disaster Mitigation Project | $105,211.11 | Identified for Further Review |
Swinomish Indian Tribal Community | Advance Assistance Swinomish Indian Tribal Community | $10,439.10 | Identified for Further Review |
TN | Tennessee Management Cost Application | $248,295.00 | Did Not Meet HMA Requirements |
TN | Flood Hazard Mitigation Project - Smyrna, TN | $3,310,595.86 | Did Not Meet HMA Requirements |
Tonkawa Tribe of Indians of Oklahoma | Tonkawa Tribe Planning Project Advance Assistance | $81,750.00 | Identified for Further Review |
TX | RGCOG_Update Comprehensive Far West Texas Hazard Mitigation Plans | $264,317.00 | Identified for Further Review |
TX | PDM FY18 Management Costs | $3,251,079.00 | Identified for Further Review |
TX | Hazard Mitigation Plans City of Texarkana, Titus and Red River County | $90,000.00 | Not Selected |
TX | County of El Paso Texas Multihazard Mitigation Plan | $45,000.00 | Not Selected |
TX | HazMAP Updates for Johnson, Somervell, and Wise Counties | $270,900.00 | Not Selected |
TX | HazMAP Updates for Ellis and Navarro Counties | $226,800.00 | Not Selected |
TX | University of Texas at Arlington Hazard Mitigation Plan | $60,000.00 | Not Selected |
TX | Countywide Resilient Infrastructure Program Improvements | $7,125,000.00 | Did Not Meet HMA Requirements |
TX | Hays County Community Flood Mitigation Project - PDM | $7,921,747.50 | Did Not Meet HMA Requirements |
TX | Town of Prosper Drainage Improvement | $1,391,625.00 | Did Not Meet HMA Requirements |
TX | Resilient Infrastructure: C147-00-00 Flood Risk Reduction Project | $10,000,000.00 | Did Not Meet HMA Requirements |
TX | City of Farmers Branch PDM Floodway Mitigation Project | $2,426,712.75 | Did Not Meet HMA Requirements |
Upper Skagit Indian Tribe | USIT Wastewater Disposal Field Stormwater Retrofit | $522,728.00 | Identified for Further Review |
Upper Skagit Indian Tribe | USIT Management Costs | $52,272.00 | Identified for Further Review |
Upper Skagit Indian Tribe | USIT Advance Assistance for Water Line Seismic Retrofit and Red Creek Erosion | $200,000.00 | Identified for Further Review |
UT | Brigham City Hall/Sewer Lift Stations Generators | $411,628.50 | Identified for Further Review |
UT | Salt Lake City Fix the Bricks | $3,923,012.07 | Identified for Further Review |
UT | Pineview Estates Erosion Hazards Mitigation | $1,217,250.00 | Identified for Further Review |
UT | CUWCD DVWTP Process Improvement Project | $4,000,000.00 | Identified for Further Review |
UT | FCAOG Nat. Haz. Mitigation Plan Update 2022 | $99,000.00 | Identified for Further Review |
UT | MAG Hazard Mitigation Plan Update | $71,250.00 | Identified for Further Review |
UT | Tooele County Hazard Mitigation Plan Update | $45,000.00 | Identified for Further Review |
UT | Davis County Mitigation Plan Update 2021 | $22,500.00 | Identified for Further Review |
UT | Provo City Advanced Assistance - Levee Evaluation | $90,000.00 | Identified for Further Review |
UT | Salt Lake City Advance Assistance Surplus Levee | $75,000.00 | Identified for Further Review |
UT | Utah 2018 PDM Management | $918,724.43 | Identified for Further Review |
UT | North Salt Lake Eaglepointe Landslide Mitigation | $2,290,965.00 | Did Not Meet HMA Requirements |
UT | Multi-Jurisdictional, Multi-use Power Generation | $225,000.00 | Did Not Meet HMA Requirements |
UT | Kanab City Flood Mitigation Project | $4,000,000.00 | Did Not Meet HMA Requirements |
UT | Penstock Waterlines Resilient Infrastructure Project | $9,742,800.00 | Did Not Meet HMA Requirements |
VA | Virginia 2018 Strategic Local Mitigation Planning | $300,000.00 | Identified for Further Review |
VA | PDM 2018 Portsmouth Infrastructure Improvements and Mitigation Strategies | $137,812.50 | Identified for Further Review |
VA | Resilient Infrastructure - Chesterfield Co. Water Treatment Plant | $8,671,959.00 | Identified for Further Review |
VA | Virginia PDM Management Costs | $1,082,676.00 | Identified for Further Review |
VA | PDM 2018 CRC - Drakes Branch Municipal Building/Fire Department | $205,699.50 | Not Selected |
VA | City of Martinsville-Nationwide Homes Drainage Improvement Project | $1,146,150.00 | Not Selected |
VA | Newport News Harwood¿s Mill Reservoir Dam Improvements | $2,051,250.00 | Not Selected |
VA | PDM 2018 Chesapeake - Install Fixed Generators at 3 Wastewater Pump Stations | $225,000.00 | Not Selected |
VA | Greene County Acquisition and Demolition of 1 Property | $515,811.00 | Not Selected |
VA | Assessment of Landslide Hazard Risk in King William County | $58,832.91 | Not Selected |
VA | PDM 2018 Acquisition of 1 Property (Nottoway Lane) | $203,395.50 | Not Selected |
VI | USVI Housing Authority Simmons Senior Center Wind Retrofit | $81,221.00 | Did Not Meet HMA Requirements |
VT | State of Vermont Local Hazard Mitigation Plan Development | $170,475.00 | Identified for Further Review |
VT | Huntington Landslide Acquisition/Demolition | $292,713.75 | Identified for Further Review |
VT | VT Route 9 Whetstone Brook Flood Mitigation Project | $3,588,800.49 | Identified for Further Review |
VT | State of Vermont 2018 PDM (MC) | $64,162.50 | Identified for Further Review |
VT | Town of Duxbury Culvert Replacement - Advance Assistance | $63,000.00 | Did Not Meet HMA Requirements |
VT | Jeffersonville Drought Mitigation Water Source Upgrades -- Advanced Assistance | $86,436.00 | Did Not Meet HMA Requirements |
VT | Advance Assistance Town of Danby Green Hill Road/Purchase Brook Culvert | $27,745.00 | Did Not Meet HMA Requirements |
VT | Advance Assistance:Town of Weathersfield Culvert Replacements Engineering/Design | $22,500.00 | Did Not Meet HMA Requirements |
WA | Yakima County Hazard Mitigation Plan Update | $52,500.00 | Identified for Further Review |
WA | Pacific County Hazard Mitigation PDM Application | $63,750.00 | Identified for Further Review |
WA | Whatcom County Natural Hazard Mitigation Plan Update | $75,000.00 | Identified for Further Review |
WA | Town of Carbonado Generator for Water Treatment Plant | $182,716.62 | Identified for Further Review |
WA | City of Ocean ShoresTsunami Vertical Evacuation Project | $3,592,141.50 | Identified for Further Review |
WA | Stevens Elementary Tsunami Evacuation Shelter | $2,976,137.25 | Identified for Further Review |
WA | Tacoma Water System Seismic Resiliency Project | $4,000,000.00 | Identified for Further Review |
WA | Capitol Hill Housing Bremer Apartments Seismic Retrofit | $3,762,234.36 | Identified for Further Review |
WA | MVSD Old Main High School Seismic Upgrade Project | $3,024,138.00 | Identified for Further Review |
WA | City of Westport Vertical Evacuation Project -Advance Assistance | $103,140.00 | Identified for Further Review |
WA | Advance Assistance for San Juan County Courthouse Earthquake Retrofit | $73,500.00 | Identified for Further Review |
WA | Washington State FY 2018 PDM Management Costs Subapplication | $1,703,660.49 | Identified for Further Review |
WA | City of Walla Walla Generators for Critical Facilities | $159,076.50 | Did Not Meet HMA Requirements |
WA | Pierce County Lower White River Resilient Infrastructure | $7,927,233.96 | Did Not Meet HMA Requirements |
WA | City of Seattle Hiawatha Community Center Seismic Retrofit | $435,425.16 | Did Not Meet HMA Requirements |
WA | Lake Whatcom Water and Sewer District Water Reservoir Seismic Project | $3,132,044.00 | Did Not Meet HMA Requirements |
WI | St.Croix Co (WI) Fairgrounds Community Safe Room | $524,295.00 | Identified for Further Review |
WI | Calumet County, Wisconsin Hazard Mitigation Plan | $20,400.00 | Identified for Further Review |
WI | City of Superior All Hazard Mitigation Update | $29,619.60 | Identified for Further Review |
WI | Village of Spencer Pre-Disaster Mitigation Project | $3,019,928.03 | Identified for Further Review |
WI | Advanced Assistance - Data Collection and Rebuilding Natural Infrastructure | $199,999.86 | Identified for Further Review |
WI | PDM 2018 State Management Costs | $320,355.52 | Identified for Further Review |
WY | Laramie County Child's Draw Basin Advance Assistance Drainage Master Plan | $199,999.50 | Identified for Further Review |
WY | Upper North Platte River Restoration and Flood Mitigation Project, Saratoga WY a | $877,911.75 | Did Not Meet HMA Requirements |