Subapplication Summary
Selected Subapplications
Highlights
Status by State
The Building Resilient Infrastructure and Communities (BRIC) grant program provides proactive investment in resilience for communities are better prepared and remain resilient prior to a hurricane, flood or wildfire. BRIC provides funds annually for hazard mitigation planning and projects to reduce risk of damage before a disaster.
On August 1, FEMA announced the 53 projects selected from the national competition applications received. In addition, on May 19, FEMA announced the BRIC Round 1 selections for the tribal set-aside and the state and territory allocations.
In addition to project selections, the BRIC Program offers help to communities in the form non-financial Direct Technical Assistance (DTA). For this fiscal year, 20 eligible communities from more than 100 applications have been selected to receive subject matter expertise and partnership collaboration to bolster a community’s success with project development.
Visit the BRIC Direct Technical Assistance webpage for more information.
This announcement is not an award. The information below summarizes the status of all subapplications submitted, including a table showing Subapplications by State, submitted for this grant cycle.
Summary of Total Fiscal Year 2021 Subapplications
FEMA made $1.16 billion available for the Building Resilient Infrastructure and Communities (BRIC) and Flood Mitigation Assistance (FMA) grant programs in fiscal year 2021.
- For BRIC, every state and territory, including 36 tribes, submitted 788 subapplications requesting $4.16 billion in federal cost share funding.
- For Flood Mitigation Assistance, 25 states submitted 194 subapplications requesting $534 million in federal cost share funding.
The breakdown of available funding for fiscal year 2021 includes $1 billion for BRIC and $160 million for Flood Mitigation Assistance.
For the BRIC program, this includes an increase in set-aside grants for tribes—from $20 million to $25 million. The state and territory allocation also increased from $600,000 per applicant to $1 million per applicant for a total of $56 million in available funds.
Summary of the First Round of Subapplication Selections Announced on May 19
- For BRIC, FEMA selected 316 subapplications totaling $65.7 million across 53 states and territories, including 27 tribes.
- For Flood Mitigation Assistance, FEMA selected 22 subapplications totaling $25.5 million across 19 different communities in five states.
Subapplication Selections for the BRIC National Competition
In Fiscal Year 2021,FEMA selected projects from 19 states, including the District of Columbia, across all 10 FEMA Regions. The selected projects have met the basic eligibility requirements and will enter the next phase of the awards review process. FEMA will provide funding through these selections for states, local communities, and District of Columbia for larger more complex infrastructure projects.
View full summaries of all competitive BRIC selections.
These selection announcements are not awards. FEMA will work with applicants “Identified for Further Review” to conduct programmatic reviews of the selected subapplications before making a final decision for funding.
Reminder: As in previous years, funding requests exceeded the amounts available for Hazard Mitigation Assistance grant programs. This trend shows the need for more funding to reduce hazards in the United States.
The data shown below represents a summary of the subapplications. The table below lists additional information about subapplications by state.
For the subapplications identified for further review for the BRIC National Competition, 49% ($455.8 million) of the funding will be delivered to communities that meet one or more Justice40 interim criteria. Overall, for the Fiscal Year 2021 BRIC selections, FEMA achieved delivering nearly 50% of grant funding to disadvantaged communities.
As in previous years, BRIC and Flood Mitigation Assistance funding requests exceeded the amounts available for Hazard Mitigation Assistance grant programs. This trend shows the need for more funding to reduce hazards in the United States.
For additional information or to ask questions, grant applicants should contact their FEMA regional offices.
BRIC Selected Subapplications in the Total Grant Cycle
FEMA received 788 subapplications for BRIC funding of which 369 have been selected for further review as part of the state and tribal set-aside.
Through the National Competition, FEMA selected 53 large competitive projects based on the highest composite score until the funding amount available had been reached.
For fiscal year 2021, FEMA received applications for $4.16 billion in federal cost share. The total proposed project costs exceeded $6.44 billion.
Geography Summary
In this grant cycle, 56 states and territories applied for BRIC. Of these, 12 states submitted projects that totaled more than $50 million or more in federal cost share funding.
Four states submitted projects with over $200 million federal cost share funding: California, Louisiana, Texas and Virginia.
FEMA received 72 subapplications from tribes requesting an estimated $27.95 million in federal cost share funding.
Subapplications Summary for BRIC
States, territories and tribes submitted applications in the following categories: Capability and Capacity Building Activities and Mitigation Projects.
The 20 communities selected to receive non-financial Direct Technical Assistance through BRIC represent five tribal governments, one territory and 15 states. Of the communities selected 17 out of 20 are disadvantaged communities, six of which are Economically Disadvantaged Rural Communities (EDRC).
From the previous year, subapplication requests for federal funding for Capability and Capacity Building Activities increased by 49%. These investments build a basis for future successful grant applications and projects.
The technical assistance that FEMA provides through BRIC grants can also help communities build applications to other funding sources. Over time, this can help diversify their funding options.
Building capacity takes time. The growth in requests in this funding area shows that communities value this support from FEMA.
Tribes who submitted subapplications in fiscal year 2021 requested significantly more funds in this grant cycle. Tribal applicants requested a total of $3.18 million to support applying building codes and standards, included modern building codes, and developing new plans. Compared to fiscal year 2020, tribal requests increased by 124%.
Types of Subapplications for the Fiscal Year 2021 Grant Cycle
This includes data from state and territory allocations and set-aside for tribes.
Uses of BRIC Assistance | Number of Subapplications Selected | Total Amount of Federal Cost Share |
---|---|---|
Mitigation Projects | 87 | $814.96 million |
Capability and Capacity Building Activities | 220 | $40.37 million |
Management Costs | 62 | $138.14 million |
Direct Technical Assistance | 20 | N/A |
Totals | 389 | $993.47 million |
Project Activity Types Summary
There are various types of projects eligible for BRIC funding. The lists below reflect the top five project types by federal cost share requested and the number of subapplications requested and the number of subapplications (not including Management Costs).
Definitions for these project types are available here.
TOP FIVE PROJECT TYPES BY FEDERAL SHARE REQUESTED
- Flood Control = $1.39 billion
- Utility/Infrastructure Protection = $1.26 billion
- Stabilization and Restoration = $219 million
- Mitigation Reconstruction = $101 million
- Retrofits = $100 million
TOP FIVE PROJECT TYPES BY NUMBER OF SUBAPPLICATIONS
- Flood Control = 144 subapplications
- Project Scoping (Engineering, Environmental, Feasibility and/or Benefit-Cost Analysis) = 125 subapplications
- Utility/Infrastructure Protection = 109 subapplications
- Plan Update = 61 subapplications
- Safe Room/Shelters = 32 subapplications
Highlights of the Fiscal Year 2021 BRIC Subapplications
Justice40
The BRIC program is one of several federal agency programs participating in Justice40, a Biden-Harris Administration initiative to prioritize federal investments benefitting disadvantaged communities. The Fiscal Year 2021 grant cycle focused on advancing support and access for underserved communities.
FEMA set a baseline to achieving the Justice40 Initiative goals which prioritize delivering at least 40% of the overall benefits to disadvantaged communities. This year FEMA established a baseline within the BRIC and Flood Mitigation Assistance grant programs to achieve that goal and will continue to build on the work we have done to ensure equitable outcomes.
FEMA anticipates continued coordination with the Biden Administration and other federal agencies with Justice40 covered programs. Examples of FEMA's commitment to prioritize equity include:
- Building Resilient Infrastructure and Communities (BRIC): City of Gastonia, North Carolina: Duharts Creek is located along the east side of the city. Frequent, increasingly severe, rain events have left the area vulnerable to flooding and has caused significant erosion along the banks. This federal grant funding will restore the stream, stabilize the creek bank and realign critical water and power infrastructure. This design approach emphasizes nature-based solutions and materials with several recommendations including bank regrading, natural-fiber erosion control matting and native plantings. The goal is to reduce the severity of erosion and encroachment from future flood events. These efforts will be completed in two phases. Phase one includes notice of grant award, preliminary design, permitting, and final design. Phase two will include bidding and construction.
Expanded Selections from Fiscal Year 2020 Cycle
In comparing data and statistics to the fiscal year 2020 grant cycle, the BRIC program expanded selections and made improvements.
- FEMA made more selections across all 10 FEMA regions, including 53 states and territories, the District of Columbia and 27 tribes.
- Twelve states, or 63% of all states, will be first time recipients for competitive BRIC selections
- Competitive project subapplication success rate increased from 4% to 14% in FY21
- Nineteen states received BRIC Competitive Grant Funds in FY21 versus 10 states in FY20 (90% increase)
- Most states that received BRIC Competitive funds in both years saw an annual increase in their competitive funds as well
- Non-coastal states will receive more than 20% of funding in the competitive selection.
- The states of Wisconsin and Wyoming were competitive this year even without state-level building code points. This demonstrates that applications can be competitive without state-level building codes points in years with high amounts of available funding.
- The projects selected for this BRIC grant cycle will invest in mitigation in a variety of ways and demonstrate FEMA’s commitment to equity and the equitable distribution of project selections around the nation.
FY 2021 Building Resilient Infrastructure and Communities Subapplicant Status
The below table shows each subapplication status by state. For this grant cycle, FEMA made two announcements. In May, the status of subapplication selections for the Non-Financial Direct Technical Assistance communities, tribal set-aside and the state and territory allocations were announced. In August, FEMA announced the national competition selections for BRIC.
Learn about the definition of each status description:
State | Subgrant ID | Subapplication Type | Subapplication Title | Eligible Federal Cost Share | Final Selection Status |
---|---|---|---|---|---|
Alabama | EMA-2021-BR-002-0002 | Project | Baldwin County Emergency Diesel Generator Acquisition and Installation | $883,840.80 | Identified for Further Review - Round 1 |
Alabama | EMA-2021-BR-002-0003 | Management cost | Management Cost | $116,004.11 | Identified for Further Review - Round 1 |
Alabama | EMA-2021-BR-002-0001 | Project | City of Mobile - Severe Weather Attenuation Tanks & Lift Station Program | Not Selected | Not Selected for Further Review |
Alaska | EMS-2021-BR-026-0001 | Management cost | Management Costs | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-026-0002 | Plan | Hazard Mitigation Plan Grant | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-085-0004 | Plan | Prince of Wales Island, Alaska Multi-Jurisdictional Hazard Mitigation Plan | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-085-0006 | Project scoping | Tsunami early warning research: Noyes Canyon | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-085-0007 | Project | Klawock Hazard Education Program | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-090-0001 | Plan | ICAS New Hazard Mitigation Plan Development | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-091-0003 | Plan | Qawalangin Tribe of Unalaska Tribal Hazard Mitigation Plan | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-097-0001 | Management cost | Management Costs | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-097-0002 | Plan | Native Village of Larsen Bay Tribal Hazard Mitigation Plan | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-098-0001 | Management cost | Management Costs | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-098-0002 | Plan | Native Village of Hooper Bay Tribal Hazard Mitigation Plan | Not Selected | Did not meet HMA Requirements |
Alaska | EMS-2021-BR-040-0001 | Project scoping | Chester Lake Reservoir Project | $774,900.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-071-0001 | Project scoping | Goldenview Middle School Drainage - Design Study Report | $225,000.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-071-0002 | Project scoping | Bettye Davis East Anchorage High School Benson Building Seismic Safety Improvements - Planning | $135,000.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-071-0004 | Plan | Alaska Hazard Mitigation Plan Grant | $411,210.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-071-0005 | Management cost | State of Alaska Management Costs | $102,828.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-072-0001 | Project scoping | Chistochina River Flood Mitigation Scoping | $999,781.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-072-0002 | Management cost | Chistochina River Flood Mitigation Management Costs | $113,612.60 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-073-0001 | Project | Napakiak Managed Retreat Phase One: 10 Home Relocations | $2,239,044.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-075-0001 | Plan | Chenega Hazard Mitigation Plan | $55,853.10 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-075-0002 | Management cost | Chenega Hazard Mitigation Plan Management Costs | $6,205.90 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-085-0001 | Project scoping | Klawock Drinking Water Storage/Reverse Osmosis Plant | $68,638.50 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-085-0002 | Project scoping | Klawock Emergency Shelter Design Scoping | $153,796.50 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-085-0003 | Project scoping | Backup Generator for Water Treatment Plant Scoping | $92,358.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-085-0005 | Management cost | KCA Management Costs Subapplication | $34,977.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-086-0001 | Project scoping | Rocky River Basin Project Scoping | $697,250.60 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-086-0002 | Management cost | Rocky River Basin Management Cost | $79,232.90 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-091-0001 | Management cost | Qawalangin Management Costs | $50,000.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-091-0002 | Plan | Feasibility and Framework for Establishing Mutual Aid for Disaster Support | $180,000.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-091-0004 | Plan | Resilient Building Code Adoption Support | $270,000.00 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-101-0001 | Plan | NTC Emergency Operations Plan Update | $144,564.37 | Identified for Further Review - Round 1 |
Alaska | EMS-2021-BR-071-0003 | Project | University of Alaska Butrovich building seismic retrofit | Not Selected | Not Selected for Further Review |
Alaska | EMS-2021-BR-071-0006 | Project | Salmon Creek MP4.8 - MP5.95 | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2021-BR-069-0004 | Plan | Territorial Integrated Geospatial Framework | Not Selected | Did not meet HMA Requirements |
American Samoa | EMF-2021-BR-069-0009 | Project | American Samoa Tsunami Siren System | Not Selected | Did not meet HMA Requirements |
American Samoa | EMF-2021-BR-069-0006 | Project scoping | ASCC Drainage | $270,000.00 | Identified for Further Review - Round 1 |
American Samoa | EMF-2021-BR-069-0007 | Plan | Hazard Mitigation Plan Update | $374,588.33 | Identified for Further Review - Round 1 |
American Samoa | EMF-2021-BR-069-0008 | Management cost | State Management Cost | $71,620.93 | Identified for Further Review - Round 1 |
American Samoa | EMF-2021-BR-069-0001 | Project | Route 014 Drainage Mitigation | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2021-BR-069-0002 | Project | Aunu'u Wharf Reconstruction | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2021-BR-069-0003 | Project | Feeder-6 Power Line Conversion from Overhead to Underground | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2021-BR-069-0005 | Project | Feeder 9 Overhead to Underground Primary Line Conversion | Not Selected | Not Selected for Further Review |
Arizona | EMF-2021-BR-018-0002 | Project | City of St. Johns Police Department Emergency Backup Generator | Not Selected | Did not meet HMA Requirements |
Arizona | EMF-2021-BR-018-0003 | Project | City of Bisbee Bridge Mitigation Project | Not Selected | Did not meet HMA Requirements |
Arizona | EMF-2021-BR-018-0010 | Project | Museum Flood Area, Channel Improvement Project | Not Selected | Did not meet HMA Requirements |
Arizona | EMF-2021-BR-018-0001 | Management cost | Arizona Management Costs | $36,026.51 | Identified for Further Review - Round 1 |
Arizona | EMF-2021-BR-018-0006 | Project scoping | Landslide mapping along the US Route 60 corridor, Florence Junction to Show Low | $75,199.60 | Identified for Further Review - Round 1 |
Arizona | EMF-2021-BR-018-0011 | Project scoping | Assessing post-wildfire flow hazards for mitigation in Gila County | $196,174.21 | Identified for Further Review - Round 1 |
Arizona | EMF-2021-BR-018-0004 | Project | Lower Highland Wash Flood Control Project | Not Selected | Not Selected for Further Review |
Arizona | EMF-2021-BR-018-0005 | Project | ACD2 C-328 Fort Defiance Flood Mitigation | Not Selected | Not Selected for Further Review |
Arizona | EMF-2021-BR-018-0007 | Project | City of Bisbee/ Arizona Water Co. Fire Suppression System Mitigation | Not Selected | Not Selected for Further Review |
Arizona | EMF-2021-BR-018-0008 | Project | South Mt. Elden Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Arizona | EMF-2021-BR-018-0009 | Project | Millet Swale Dam, Hazard Mitigation Project | Not Selected | Not Selected for Further Review |
Arizona | EMF-2021-BR-018-0012 | Project | Linda Vista culvert upsizing - post-wildfire flood mitigation | Not Selected | Not Selected for Further Review |
Arizona | EMF-2021-BR-018-0013 | Project | RWRD Tres Rios WRF Microgrid Generator & Solar Power Resiliency Project | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0004 | Project | Clarendon Drainage Project | Not Selected | Did not meet HMA Requirements |
Arkansas | EMT-2021-BR-133-0027 | Project | Clarendon Infrastructure (WW) Project | Not Selected | Did not meet HMA Requirements |
Arkansas | EMT-2021-BR-133-0001 | Management cost | Arkansas State Management Costs | $131,063.78 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0003 | Project scoping | Humnoke Drainage Study Project Scoping | $38,593.75 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0005 | Plan | Chicot County MultiJurisdiction Hazard Mitigation Plan | $26,250.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0006 | Project | Mountain View School District Safe Room | $490,147.50 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0007 | Plan | Pike County MultiJurisdiction Hazard Mitigation Plan | $26,250.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0008 | Project scoping | Centennial Creek Drainage Study & Centennial Creek from Tyler Street to College Avenue | $115,520.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0011 | Plan | Johnson County Hazard Mitigation Plan Update | $30,000.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0013 | Plan | Montgomery County Hazard Mitigation Plan Update | $30,000.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0014 | Plan | Hot Spring County Hazard Mitigation Plan Update | $30,000.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0017 | Project scoping | 2021 Windchime Bridge Mitigation Project in Sherwood | $74,000.25 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0018 | Plan | Clark County Hazard Mitigation Plan Update | $30,000.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0021 | Plan | Jefferson County Hazard Mitigation Plan Update | $52,520.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0025 | Plan | Ashley County MultiJurisdiction Hazard Mitigation Plan Update | $26,250.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0030 | Plan | Perry County Hazard Mitigation Plan Update | $30,000.00 | Identified for Further Review - Round 1 |
Arkansas | EMT-2021-BR-133-0002 | Project | Saline County Drainage Lower Ark/Maumelle Watershed | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0009 | Project | Jacksonville Rocky Branch Drainage Improvements | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0010 | Project | Mt. Vernon-Enola Elementary School Safe Room | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0012 | Project | Monroe County Knights and Dials Creeks Drainage | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0015 | Project | Saline County Drainage - Upper Saline Watershed | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0016 | Project | Danville School Safe Room | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0019 | Project | Des Arc Public School Safe Room Projects | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0020 | Project | Heber Springs Drainage Improvement Project | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0022 | Project | North Little Rock Dixie Addition Stormwater Lift Station | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0023 | Project | Cabot Railroad Drainage Improvement and Drainage Study | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0024 | Project | Dardanelle Middle School Safe Room | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0026 | Project | Jacksonville Bayou Meto Bridge Improvements | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0028 | Project | North Little Rock East Bethany Road Drainage Improvement | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0029 | Project | Dardanelle Intermediate School Safe Room | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0031 | Project | North Little Rock Magnolia/Olive Streets Drainage Improvement | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2021-BR-133-0032 | Project | Northlake Road Drainage Improvements | Not Selected | Not Selected for Further Review |
California | EMF-2021-BR-058-0002 | Plan | Robinson Rancheria Tribal Community Emergency Management Plan | Not Selected | Did not meet HMA Requirements |
California | EMF-2021-BR-085-0002 | Project | Planet Pala Information Campaign | Not Selected | Did not meet HMA Requirements |
California | EMF-2021-BR-089-0005 | Project | Tulare County Drought Resiliency and Flood Mitigation Project at McKay Point | Not Selected | Did not meet HMA Requirements |
California | EMF-2021-BR-089-0014 | Project | City of Pacifica Beach Blvd. Infrastructure Resiliency Project | Not Selected | Did not meet HMA Requirements |
California | EMF-2021-BR-017-0001 | Project | Coyote Valley Band of Pomo Indians Russian Riverbank Stabilization Project | $5,315,264.32 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-058-0001 | Project scoping | Robinson Rancheria Microgrid Feasibility Study | $166,797.00 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-079-0001 | Project | Dry Creek Rancheria Wildfire Resilience Project | $247,354.50 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-085-0001 | Project | Pala Building Codes Project | $286,125.00 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-089-0003 | Management cost | California State Management Costs | $25,452,553.49 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-089-0004 | Project scoping | State Coastal Conservancy Sonoma Creek Flood Mitigation and Restoration Project Scoping | $540,096.60 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-089-0007 | Project scoping | Project Scoping: Santa Cruz County - Flood Hazard Mitigation Project | $300,000.00 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-089-0012 | Project scoping | Port of SF Project Scoping Innovative Nature-Based Mitigations for Seawall Multi-Hazards | $159,900.00 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-092-0001 | Project | Archer Road Repair | $377,556.15 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-096-0001 | Plan | New Hazard Mitigation Plan for the Jamul Indian Village of California | $92,010.00 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-099-0001 | Plan | Resilient Augustine Information Campaign | $392,850.00 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-099-0002 | Plan | Augustine Building Codes Adoption and Land Use Plan | $217,500.00 | Identified for Further Review - Round 1 |
California | EMF-2021-BR-089-0001 | Project | Multi-Family Soft-Story Retrofit Program | $20,200,000.00 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0002 | Project | City of Healdsburg Water Resiliency Integrating Groundwater in Healdsburg Through ASR | $6,066,080.88 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0006 | Project | Imperial Irrigation District K-Line Transmission Hardening Project | $23,888,095.86 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0008 | Project | Grimes Floodplain Restoration & Levee Resiliency Project | $18,923,625.16 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0009 | Project | City of Imperial Beach Bayside Community Resiliency: The Living Levee Project | $15,160,988.50 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0010 | Project | Orange County – Nature-Based Shoreline Adaptation Project | $9,799,793.00 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0011 | Project | Nature-based Mitigation & Wildfire Retrofitting for Climate Resiliency in Nevada County | $31,034,243.00 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0013 | Project | Belvedere Lagoon Coastal Levee System Resiliency Project | $15,610,602.04 | Identified for Further Review - Round 2 |
California | EMF-2021-BR-089-0015 | Project | Kern County Willow Springs Water Bank Drought Mitigation Project | $39,496,828.00 | Identified for Further Review - Round 2 |
Colorado | EMD-2021-BR-060-0001 | Project | Skeel Reservoir Hazard Mitigation | Not Selected | Did not meet HMA Requirements |
Colorado | EMD-2021-BR-060-0008 | Project | Colorado Front Range Wildfire Mitigation | Not Selected | Did not meet HMA Requirements |
Colorado | EMD-2021-BR-060-0009 | Project | Project 7 Regional Water Supply and Drought Mitigation Program | Not Selected | Did not meet HMA Requirements |
Colorado | EMD-2021-BR-060-0003 | Management cost | State Management Costs | $160,000.00 | Identified for Further Review - Round 1 |
Colorado | EMD-2021-BR-060-0007 | Project scoping | Scoping/Design for 12th Street Outfall | $1,000,000.00 | Identified for Further Review - Round 1 |
Colorado | EMD-2021-BR-060-0002 | Project | Monument Creek at Mark Dabling | Not Selected | Not Selected for Further Review |
Colorado | EMD-2021-BR-060-0004 | Project | Cottonwood Creek at Powers | Not Selected | Not Selected for Further Review |
Colorado | EMD-2021-BR-060-0005 | Project | South Englewood Flood Reduction Project | Not Selected | Not Selected for Further Review |
Colorado | EMD-2021-BR-060-0006 | Project | Crystal Lakes Fuels Mitigation | Not Selected | Not Selected for Further Review |
Colorado | EMD-2021-BR-060-0010 | Project | Sand Creek, Galley to Palmer Park | Not Selected | Not Selected for Further Review |
Colorado | EMD-2021-BR-060-0011 | Project | Eisenhower Johnson Memorial Tunnel Generator Replacement | Not Selected | Not Selected for Further Review |
Colorado | EMD-2021-BR-060-0012 | Project | Town of Red Cliff Rockfall Mitigation | Not Selected | Not Selected for Further Review |
Colorado | EMD-2021-BR-060-0013 | Project | Coal Creek - County Line Road Flood Mitigation | Not Selected | Not Selected for Further Review |
Connecticut | EMB-2021-BR-002-0006 | Project scoping | Project Scoping - Langer Pond Dam | Not Selected | Did not meet HMA Requirements |
Connecticut | EMB-2021-BR-002-0007 | Plan | Regional Natural Hazard Mitigation Plan Update | Not Selected | Did not meet HMA Requirements |
Connecticut | EMB-2021-BR-002-0003 | Management cost | DESPP/DEMHS Management Cost | $5,201,343.60 | Identified for Further Review - Round 1 |
Connecticut | EMB-2021-BR-002-0004 | Project scoping | Windham Water Works Reservoir Infrastructure Project Scoping, Concept Design, and Hazard Mitigation | $100,800.00 | Identified for Further Review - Round 1 |
Connecticut | EMB-2021-BR-002-0013 | Project scoping | Bridgeport Flood Mitigation - Project Scoping | $675,000.00 | Identified for Further Review - Round 1 |
Connecticut | EMB-2021-BR-002-0002 | Project | Harbor Brook Flood Control/100 Hanover Street Demolition Project in Meriden | $303,187.50 | Identified for Further Review - Round 2 |
Connecticut | EMB-2021-BR-002-0005 | Project | City of New Haven Inland and Coastal Flood Resiliency Project | $25,094,886.00 | Identified for Further Review - Round 2 |
Connecticut | EMB-2021-BR-002-0008 | Project | Meriden Harbor Brook Flood Resilience | $11,165,250.00 | Identified for Further Review - Round 2 |
Connecticut | EMB-2021-BR-002-0001 | Project | East Lyme Sewer Pump Station Flood Mitigation | Not Selected | Not Selected for Further Review |
Connecticut | EMB-2021-BR-002-0009 | Project | COWH Sewer Outfall Resilience Subgrant | Not Selected | Not Selected for Further Review |
Connecticut | EMB-2021-BR-002-0010 | Project | Department of Transportation Utility & Route 1 Drainage Improvement | Not Selected | Not Selected for Further Review |
Connecticut | EMB-2021-BR-002-0011 | Project | East Branch Trout Brook Culvert Replacements | Not Selected | Not Selected for Further Review |
Connecticut | EMB-2021-BR-002-0012 | Project | City of Stamford Pump Station Improvements | Not Selected | Not Selected for Further Review |
Delaware | EMP-2021-BR-050-0001 | Project scoping | Lower Brandywine River Flooding Study and Mitigation Strategy | $500,000.00 | Identified for Further Review - Round 1 |
Delaware | EMP-2021-BR-050-0002 | Management cost | Delaware Management Costs | $66,667.50 | Identified for Further Review - Round 1 |
District Of Columbia | EMP-2021-BR-057-0001 | Project scoping | Project Scoping for FloodSmart Homes Retrofit | $244,053.00 | Identified for Further Review - Round 1 |
District Of Columbia | EMP-2021-BR-057-0002 | Management cost | DC Management Costs | $3,080,207.97 | Identified for Further Review - Round 1 |
District Of Columbia | EMP-2021-BR-057-0005 | Project scoping | Project Scoping for Living Shoreline in Buzzard Point neighborhood in Southwest | $242,987.00 | Identified for Further Review - Round 1 |
District Of Columbia | EMP-2021-BR-057-0006 | Project scoping | Project Scoping For Recreation Center Resilience Hubs | $212,960.00 | Identified for Further Review - Round 1 |
District Of Columbia | EMP-2021-BR-057-0007 | Project scoping | Project Scoping for DC Kenilworth Park/Watts Branch Environmental Study | $300,000.00 | Identified for Further Review - Round 1 |
District Of Columbia | EMP-2021-BR-057-0004 | Project | Blue Plains Advanced Wastewater Treatment Plant Floodwall Segments A, B, and D | $20,319,075.00 | Identified for Further Review - Round 2 |
District Of Columbia | EMP-2021-BR-057-0003 | Project | DC Water Backwater Valve Rebate Program | Not Selected | Not Selected for Further Review |
Florida | EMA-2021-BR-152-0011 | Project | Pasco County - Green Key Drainage | Not Selected | Did not meet HMA Requirements |
Florida | EMA-2021-BR-152-0015 | Project | Charlotte County Leachate Plant Generator Project - LPGP | Not Selected | Did not meet HMA Requirements |
Florida | EMA-2021-BR-152-0016 | Project | Flagler County Emergency Operations Center Hardening | Not Selected | Did not meet HMA Requirements |
Florida | EMA-2021-BR-152-0017 | Project | Toho Water Authority Drought Mitigation Project | Not Selected | Did not meet HMA Requirements |
Florida | EMA-2021-BR-133-0001 | Project scoping | Hollywood Reservation C-10 Spur Canal Drainage Study | Identified for Further Review - Round 1 | |
Florida | EMA-2021-BR-152-0001 | Project | City of Tampa Fire Station #13 Wind Mitigation | $497,887.37 | Identified for Further Review - Round 1 |
Florida | EMA-2021-BR-152-0006 | Project | City of Tampa Fire Station #3 Wind Mitigation | $423,806.12 | Identified for Further Review - Round 1 |
Florida | EMA-2021-BR-152-0007 | Management cost | Florida Management Costs | $10,526,614.02 | Identified for Further Review - Round 1 |
Florida | EMA-2021-BR-152-0012 | Project | Standby Generators for Jefferson County Volunteer Fire Department Stations | $26,404.00 | Identified for Further Review - Round 1 |
Florida | EMA-2021-BR-152-0003 | Project | COJ / JEA Buckman WRF Outfall, Flood Mitigation and WW Reliability Enhancement Project | $23,177,551.25 | Identified for Further Review - Round 2 |
Florida | EMA-2021-BR-152-0005 | Project | SFWMD Building Resiliency with Gray and Green Infrastructure, C-8 Basin of Miami-Dade | $49,999,463.00 | Identified for Further Review - Round 2 |
Florida | EMA-2021-BR-152-0002 | Project | City of Tampa Fire Station #16 Wind Mitigation | Not Selected | Not Selected for Further Review |
Florida | EMA-2021-BR-152-0004 | Project | Glen Springs Run Creek Restoration | Not Selected | Not Selected for Further Review |
Florida | EMA-2021-BR-152-0008 | Project | City of Tampa Fire Station #18 Wind Mitigation | Not Selected | Not Selected for Further Review |
Florida | EMA-2021-BR-152-0009 | Project | City of Tampa Fire Station #12 Wind Mitigation | Not Selected | Not Selected for Further Review |
Florida | EMA-2021-BR-152-0010 | Project | City of Atlantic Beach, Stanley Road Flood Mitigation | Not Selected | Not Selected for Further Review |
Florida | EMA-2021-BR-152-0013 | Project | City of Atlantic Beach, Cutlass Drive Box Culvert Replacement | Not Selected | Not Selected for Further Review |
Florida | EMA-2021-BR-152-0014 | Project | City of Port St. Lucie Water Control Structure Improvements | Not Selected | Not Selected for Further Review |
Georgia | EMA-2021-BR-116-0005 | Project | Smart Grid for the City of Acworth | Not Selected | Did not meet HMA Requirements |
Georgia | EMA-2021-BR-116-0006 | Project | Stream Restoration and Flood Control in the Headwaters of the Flint Watershed | Not Selected | Did not meet HMA Requirements |
Georgia | EMA-2021-BR-116-0010 | Project | Emory University Microgrid | Not Selected | Did not meet HMA Requirements |
Georgia | EMA-2021-BR-116-0001 | Project | BRIC Application | $41,785.44 | Identified for Further Review - Round 1 |
Georgia | EMA-2021-BR-116-0003 | Plan | Enhancing Future Flood Resiliency with Green Infrastructure in Glynn County | $190,348.11 | Identified for Further Review - Round 1 |
Georgia | EMA-2021-BR-116-0004 | Management cost | Management Grant | $4,394,634.68 | Identified for Further Review - Round 1 |
Georgia | EMA-2021-BR-116-0007 | Project scoping | Smart Sea Level Sensors | $219,375.00 | Identified for Further Review - Round 1 |
Georgia | EMA-2021-BR-116-0008 | Project | Wind Retrofit - Facilities Maintenance & Human Resources Buildings | $33,948.45 | Identified for Further Review - Round 1 |
Georgia | EMA-2021-BR-116-0011 | Project | 1247 Rowland Road Property Acquisition | $287,364.30 | Identified for Further Review - Round 1 |
Georgia | EMA-2021-BR-116-0002 | Project | Springfield Canal Improvement/Historic Carver Village and Cloverdale Flood Reduction Project | $30,147,160.00 | Identified for Further Review - Round 2 |
Georgia | EMA-2021-BR-116-0009 | Project | Marietta Power and Water Smart Grid | Not Selected | Not Selected for Further Review |
Guam | EMF-2021-BR-086-0003 | Project scoping | GIAA Ground Support Equipment Inclement Weather Facility | Not Selected | Did not meet HMA Requirements |
Guam | EMF-2021-BR-086-0008 | Project scoping | GIAA Fire Alarm/Fire Suppression Infrastructure Upgrade | Not Selected | Did not meet HMA Requirements |
Guam | EMF-2021-BR-086-0010 | Project | Namo Flood Control and Bank Stabilization | Not Selected | Did not meet HMA Requirements |
Guam | EMF-2021-BR-086-0004 | Project scoping | Manell: Restoring the Manell River's Natural Flowpath | $667,360.00 | Identified for Further Review - Round 1 |
Guam | EMF-2021-BR-086-0006 | Project scoping | GIAA Underground Utility Infrastructure Relocation and Power Generation | $332,640.00 | Identified for Further Review - Round 1 |
Guam | EMF-2021-BR-086-0009 | Management cost | Guam 2021 Technical Assistance | $177,975.00 | Identified for Further Review - Round 1 |
Guam | EMF-2021-BR-086-0001 | Project | GCC Building 600 Retrofit Project | Not Selected | Not Selected for Further Review |
Guam | EMF-2021-BR-086-0002 | Project | Umatac Pre-Storm River Maintenance and Bank Stabilization | Not Selected | Not Selected for Further Review |
Guam | EMF-2021-BR-086-0005 | Project | Yona - Tier 2 Shelter Hardening | Not Selected | Not Selected for Further Review |
Guam | EMF-2021-BR-086-0007 | Project | Manell Reforestation | Not Selected | Not Selected for Further Review |
Guam | EMF-2021-BR-086-0011 | Project | GIAA Information Technology Fiber Optic Infrastructure | Not Selected | Not Selected for Further Review |
Hawaii | EMF-2021-BR-006-0002 | Project scoping | Department of Transportation Scoping Activity - Airport Microgrids and Transportation Resilience | $375,000.00 | Identified for Further Review - Round 1 |
Hawaii | EMF-2021-BR-006-0004 | Project scoping | Kapalama Canal Flood Control Project Scoping | $300,000.00 | Identified for Further Review - Round 1 |
Hawaii | EMF-2021-BR-006-0006 | Management cost | Hawaii Management Costs | $114,843.75 | Identified for Further Review - Round 1 |
Hawaii | EMF-2021-BR-006-0007 | Plan | City and County of Honolulu Hazard Mitigation Plan Update | $200,000.00 | Identified for Further Review - Round 1 |
Hawaii | EMF-2021-BR-006-0001 | Project | Hawaii Convention Center Structural Hardening | Not Selected | Not Selected for Further Review |
Hawaii | EMF-2021-BR-006-0003 | Project | Critical Customer Hubs - Ko?olaupoko | Not Selected | Not Selected for Further Review |
Hawaii | EMF-2021-BR-006-0005 | Project | Coco Palms Resort Acquisition and Demolition | Not Selected | Not Selected for Further Review |
Idaho | EMS-2021-BR-078-0002 | Management cost | IOEM Management Costs | $64,500.00 | Identified for Further Review - Round 1 |
Idaho | EMS-2021-BR-078-0004 | Project scoping | Little Wood River Flood Control | $232,500.00 | Identified for Further Review - Round 1 |
Idaho | EMS-2021-BR-078-0006 | Project scoping | Cascade Stormwater Scoping Project | $225,000.00 | Identified for Further Review - Round 1 |
Idaho | EMS-2021-BR-078-0007 | Plan | Fremont County AHMP | $26,250.00 | Identified for Further Review - Round 1 |
Idaho | EMS-2021-BR-078-0001 | Project | Custer County Mackay Dam | Not Selected | Not Selected for Further Review |
Idaho | EMS-2021-BR-078-0003 | Project | Power line Conversion to Underground - Hayden Lake | Not Selected | Not Selected for Further Review |
Idaho | EMS-2021-BR-078-0005 | Project | Powerline Conversion to Underground - Farragut State Park / US Naval Warfare Center | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0002 | Project | Aquisistions | Not Selected | Did not meet HMA Requirements |
Illinois | EMC-2021-BR-062-0009 | Project | Village of Crestwood Storm Sewer Upgrades | Not Selected | Did not meet HMA Requirements |
Illinois | EMC-2021-BR-062-0012 | Project | Downers Grove - Curtiss and Glenview Drainage Improvement | Not Selected | Did not meet HMA Requirements |
Illinois | EMC-2021-BR-062-0015 | Project | St. Joseph Creek Watershed Flood Control and Restoration Project | Not Selected | Did not meet HMA Requirements |
Illinois | EMC-2021-BR-062-0017 | Project | City of Eureka – WWTP Flood Mitigation | Not Selected | Did not meet HMA Requirements |
Illinois | EMC-2021-BR-062-0022 | Project | City of Mattoon WWTP Flood Mitigation Project | Not Selected | Did not meet HMA Requirements |
Illinois | EMC-2021-BR-062-0026 | Plan | State Plan of Flood Control Report | Not Selected | Did not meet HMA Requirements |
Illinois | EMC-2021-BR-062-0003 | Project scoping | Project Scoping for Lake Mistake Drain Culvert | $38,880.66 | Identified for Further Review - Round 1 |
Illinois | EMC-2021-BR-062-0006 | Project | Village of Inverness | $29,925.00 | Identified for Further Review - Round 1 |
Illinois | EMC-2021-BR-062-0010 | Project | Freeport Subapplication | $271,901.25 | Identified for Further Review - Round 1 |
Illinois | EMC-2021-BR-062-0011 | Management cost | Illinois Management Costs | $120,920.49 | Identified for Further Review - Round 1 |
Illinois | EMC-2021-BR-062-0013 | Project | Generators | $27,722.25 | Identified for Further Review - Round 1 |
Illinois | EMC-2021-BR-062-0021 | Project | Lee County - Court Services Building Generator Project | $88,569.00 | Identified for Further Review - Round 1 |
Illinois | EMC-2021-BR-062-0025 | Project | Village of Coal City Water Treatment Plant | $245,101.00 | Identified for Further Review - Round 1 |
Illinois | EMC-2021-BR-062-0001 | Project | La Grange 50th Street Relief Storm Sewer Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0004 | Project | MWRD Village of Ford Heights Buyout and Riparian Restoration Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0005 | Project | Turf, Countryside, and Ranch Drainage Improvement Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0007 | Project | GPSD Levee Improvement & Certification Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0008 | Project | MWRD City of Harvey Stormwater Management Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0014 | Project | DuPage County Flood Prone Property Acquisition | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0016 | Project | MWRD Addison Creek Channel Improvements Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0018 | Project | City of Wood Dale Flood Mitigation | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0019 | Project | City of Peru Water Street Electric Substation Relocation | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0020 | Project | Machesney Park Acquisition Demolition | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0023 | Project | Capri-Emerson Flood Mitigation improvements | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0024 | Project | City of Peoria - Phase I Study - Flood Wall Application | Not Selected | Not Selected for Further Review |
Illinois | EMC-2021-BR-062-0027 | Project | City of Rock Island | Not Selected | Not Selected for Further Review |
Indiana | EMC-2021-BR-065-0002 | Plan | Indiana County MHMP Updates | $121,827.36 | Identified for Further Review - Round 1 |
Indiana | EMC-2021-BR-065-0004 | Project | Sugar Creek Acquisition Project | $460,248.75 | Identified for Further Review - Round 1 |
Indiana | EMC-2021-BR-065-0006 | Project | Residential Safe Room Program 2022 | $115,000.00 | Identified for Further Review - Round 1 |
Indiana | EMC-2021-BR-065-0007 | Management cost | Indiana Management Costs | $132,943.74 | Identified for Further Review - Round 1 |
Indiana | EMC-2021-BR-065-0008 | Plan | Indiana MHMP Update | $300,000.00 | Identified for Further Review - Round 1 |
Indiana | EMC-2021-BR-065-0001 | Project | Fort Wayne Thieme Drive Floodwall | Not Selected | Not Selected for Further Review |
Indiana | EMC-2021-BR-065-0003 | Project | Fort Wayne Foster Park Pump Station | Not Selected | Not Selected for Further Review |
Indiana | EMC-2021-BR-065-0005 | Project | Rocky Ripple Flood Damage Risk Reduction Project | Not Selected | Not Selected for Further Review |
Iowa | EMK-2021-BR-041-0001 | Project | Scott County EMA Potable Water Resiliency Project | Not Selected | Did not meet HMA Requirements |
Iowa | EMK-2021-BR-041-0003 | Project scoping | Cedar Falls - Stormwater Resilience Project Scoping | $208,000.00 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0004 | Project scoping | City of Hartley Project Scoping | $90,000.00 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0005 | Project scoping | City of Vinton Detention Scoping Project | $49,603.50 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0006 | Project scoping | Code Enforcement Enhancement | $56,250.00 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0007 | Project scoping | Downtown Flood Mitigation | $74,775.00 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0008 | Management cost | Iowa Management Cost | $125,884.70 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0009 | Project scoping | Flexible Energy Sources for Greater Iowa Community Resilience | $300,921.00 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0010 | Project scoping | City of Dyersville Project Scoping | $187,500.00 | Identified for Further Review - Round 1 |
Iowa | EMK-2021-BR-041-0002 | Project | Storm Lake Water Infrastructure Mitigation Project | Not Selected | Not Selected for Further Review |
Kansas | EMK-2021-BR-042-0004 | Project | Line Hardening | Not Selected | Did not meet HMA Requirements |
Kansas | EMK-2021-BR-001-0001 | Project scoping | Hydraulic and Hydrologic Study | $562,500.00 | Identified for Further Review - Round 1 |
Kansas | EMK-2021-BR-001-0002 | Management cost | Tribal Management Costs | $37,500.00 | Identified for Further Review - Round 1 |
Kansas | EMK-2021-BR-042-0003 | Project | City of El Dorado Repetitive Loss Mitigation Project | $375,000.00 | Identified for Further Review - Round 1 |
Kansas | EMK-2021-BR-042-0006 | Project | Ozawkie Powered Up Project | $133,680.00 | Identified for Further Review - Round 1 |
Kansas | EMK-2021-BR-042-0007 | Project | Ozawkie Sensible Sewer Program | $389,958.00 | Identified for Further Review - Round 1 |
Kansas | EMK-2021-BR-044-0001 | Plan | ITKN Multi-Hazard Mitigation Planning Grant | $276,120.00 | Identified for Further Review - Round 1 |
Kansas | EMK-2021-BR-044-0002 | Management cost | ITKN Hazard Mitigation Planning Grant | $21,000.00 | Identified for Further Review - Round 1 |
Kansas | EMK-2021-BR-042-0001 | Project | Ozawkie Vista View Drainage Project | Not Selected | Not Selected for Further Review |
Kansas | EMK-2021-BR-042-0002 | Project | Calfskin Creek Watershed Mitigation | Not Selected | Not Selected for Further Review |
Kansas | EMK-2021-BR-042-0005 | Project | USD 426 Pike Valley Elementary School Safe Room Addition | Not Selected | Not Selected for Further Review |
Kansas | EMK-2021-BR-042-0008 | Project | Sedgwick County Mulvane KS Styx Creek Flood Mitigation | Not Selected | Not Selected for Further Review |
Kentucky | EMA-2021-BR-038-0001 | Project | Paddy's Run Resilient Infrastructure Project | Not Selected | Did not meet HMA Requirements |
Kentucky | EMA-2021-BR-038-0002 | Project | Owensboro Grain Bank Stabilization Project | Not Selected | Did not meet HMA Requirements |
Kentucky | EMA-2021-BR-038-0003 | Management cost | Kentucky Management Costs | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0004 | Project scoping | Lafourche Parish Pump Station Upgrade and Hardening Scoping | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0007 | Project scoping | Project Scoping for Terrebonne Parish Hospitals Resilience Measures | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0010 | Project scoping | Project Scoping for Houma Navigation Canal Pump Station | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0013 | Plan | JP Multi Jurisdictional Hazard Mitigation Plan 2025 Update | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0019 | Project | Entergy Louisiana Happy Jack Substation Feeder Resilience Project | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0023 | Plan | Lafourche Parish Stormwater Management Framework Plan | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0028 | Plan | City of Scott Emergency Monitoring Services | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0032 | Plan | City of New Orleans Small Business Resilience Planning Assistance | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0033 | Project scoping | City of New Orleans Public Park Resilience Project Scoping | Not Selected | Did not meet HMA Requirements |
Louisiana | EMT-2021-BR-091-0006 | Project scoping | Tangipahoa Parish Government Project Scoping | $359,238.00 | Identified for Further Review - Round 1 |
Louisiana | EMT-2021-BR-091-0009 | Project scoping | White's Bayou to Cypress Bayou Subwatershed | $344,250.00 | Identified for Further Review - Round 1 |
Louisiana | EMT-2021-BR-091-0018 | Management cost | GOHSEP State Management Costs | $135,423.40 | Identified for Further Review - Round 1 |
Louisiana | EMT-2021-BR-091-0021 | Project scoping | Lake Charles - Project Scoping - Flood Mitigation, Public Safety & Citywide Resilience | $75,000.00 | Identified for Further Review - Round 1 |
Louisiana | EMT-2021-BR-091-0027 | Project scoping | City of New Orleans Lower 9th Ward Energy Resilience Project Scoping | $221,375.00 | Identified for Further Review - Round 1 |
Louisiana | EMT-2021-BR-091-0001 | Project | SELFPA-E Safe Room Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0002 | Project | DPS06 Audubon Golf Course Community Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0003 | Project | JP Retrofit for Subsidence/Erosion | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0005 | Project | Entergy New Orleans - Derbigny Substation Feeder Resilience Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0008 | Project | SWBNO Power Reliability Program | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0011 | Project | LSU Lakes - McKinley Diversion and Corporation Canal Retrofit | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0012 | Project | Sibley Lake Lift Station Emergency Power System Replacement | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0014 | Project | Entergy Louisiana Alliance Substation Feeder Resilience Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0015 | Project | Entergy Louisiana Buras Substation Feeder Resilience Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0016 | Project | JP Elevation | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0017 | Project | Entergy Louisiana Terrebonne Parish Transmission Resiliency Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0020 | Project | Washington Parish Safe Room | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0022 | Project | Town of Vidalia Wastewater Improvements | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0024 | Project | Entergy Louisiana Mossville Substation Flood Protection Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0025 | Project | Taylor Bayou Regional Improvements | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0026 | Project | Entergy Louisiana Toomey Substation Flood Protection Project | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0029 | Project | Terrebonne Parish Safe Room - TLCD | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0030 | Project | City of Central - Shoe Creek Channel Improvements | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0031 | Project | JP Mitigation Reconstruction | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2021-BR-091-0034 | Project | Entergy Louisiana Laplace Substation Flood Protection Project | Not Selected | Not Selected for Further Review |
Maine | EMB-2021-BR-006-0006 | Project | Saco Water Resource Recovery Project | Not Selected | Did not meet HMA Requirements |
Maine | EMB-2021-BR-006-0001 | Project scoping | Hunt Street Pump Station and Force Main Mitigation- Preliminary and Final Design, Bath ME | $328,000.00 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0002 | Project scoping | Project Scoping for Jepson Brook Culvert Mitigation | $70,000.00 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0003 | Management cost | Maine Management Costs | $117,062.67 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0004 | Project scoping | Drift Inn Road Project Scoping | $15,750.00 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0005 | Plan | Hancock County Hazard Mitigation Plan Update 2023 | $17,513.77 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0007 | Project | Town of Union Clarry Hill Culvert Mitigation Strategy | $206,250.00 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0008 | Plan | Piscataquis Hazard Mitigation Plan Update | $4,725.00 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0009 | Project scoping | Harward Street Drainage Area Sewer Interceptor- Sanitary Sewer Overflow Mitigation | $228,400.00 | Identified for Further Review - Round 1 |
Maine | EMB-2021-BR-006-0010 | Plan | Franklin County Hazard Mitigation Plan Update 2022 | $11,025.00 | Identified for Further Review - Round 1 |
Maryland | EMP-2021-BR-053-0002 | Project | Port Deposit Flood Control Structures. | Not Selected | Did not meet HMA Requirements |
Maryland | EMP-2021-BR-053-0004 | Project | Sawmill Creek Tributaries Restoration - Ferndale, Irving, & Muddy Bridge Branch | Not Selected | Did not meet HMA Requirements |
Maryland | EMP-2021-BR-053-0005 | Project | Make Cambridge Resilient Flood Mitigation Project | Not Selected | Did not meet HMA Requirements |
Maryland | EMP-2021-BR-053-0008 | Project scoping | Using IOT and Sensor Technology to Improve Stormwater Management along the Route One Corridor | Not Selected | Did not meet HMA Requirements |
Maryland | EMP-2021-BR-053-0009 | Project scoping | Critical Infrastructure and Community Lifelines Mapping, Prince George's County | Not Selected | Did not meet HMA Requirements |
Maryland | EMP-2021-BR-053-0001 | Project scoping | Department of Transportation MPA Marine Terminals Coastal Resiliency Assessment and Adaptation Planning | $150,000.00 | Identified for Further Review - Round 1 |
Maryland | EMP-2021-BR-053-0003 | Project scoping | Mill Swamp Flood Mitigation Project- Implementing the County Nuisance and Urban Flood Plan | $49,500.00 | Identified for Further Review - Round 1 |
Maryland | EMP-2021-BR-053-0006 | Management cost | Maryland Management Cost | $105,265.00 | Identified for Further Review - Round 1 |
Maryland | EMP-2021-BR-053-0007 | Project scoping | Cloverfields Neighborhood Flood Mitigation Project Scoping | $116,200.00 | Identified for Further Review - Round 1 |
Maryland | EMP-2021-BR-053-0010 | Project scoping | Snow Hill Manor Park Stream Restoration Project | $208,837.50 | Identified for Further Review - Round 1 |
Maryland | EMP-2021-BR-053-0011 | Project scoping | Shady Side Peninsula Climate Adaptation Study | $240,000.00 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0012 | Project | Somerville - Poplar Street Pump Station | Not Selected | Did not meet HMA Requirements |
Massachusetts | EMB-2021-BR-072-0017 | Project | Chicopee - Abbey Brook Dam Removal, Culvert Replacement, and Stream Restoration | Not Selected | Did not meet HMA Requirements |
Massachusetts | EMB-2021-BR-074-0001 | Management cost | MWT FY21 BRIC 2 | Not Selected | Did not meet HMA Requirements |
Massachusetts | EMB-2021-BR-074-0002 | Plan | MWT FY21 BRIC 3 | Not Selected | Did not meet HMA Requirements |
Massachusetts | EMB-2021-BR-074-0003 | Project | MWT FY21 BRIC 1 | Not Selected | Did not meet HMA Requirements |
Massachusetts | EMB-2021-BR-072-0001 | Project scoping | Woburn - Washington Street Flood Mitigation | $58,650.00 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0007 | Project scoping | Tisbury Beach Road Resiliency Improvements Project Scoping | $78,750.00 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0009 | Project scoping | Weymouth Fort Point Road Seawall Project Scoping | $112,590.00 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0010 | Project scoping | Resilient Town Line Brook Project Scoping– DCR | $252,750.00 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0011 | Project scoping | Royalston Watershed Based Assessment | $90,000.00 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0013 | Project scoping | West Springfield - Block Brook Watershed Study and Flood Mitigation Plan | $38,709.75 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0014 | Project scoping | Attleboro Downtown Flood Mitigation and Resiliency Planning Assessment | $187,125.00 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0018 | Management cost | Massachusetts Management Costs | $3,546,943.30 | Identified for Further Review - Round 1 |
Massachusetts | EMB-2021-BR-072-0006 | Project | Resilient Moakley Park - Equitable Climate Resilience at Boston’s Moakley Park - Boston, MA | $24,064,600.00 | Identified for Further Review - Round 2 |
Massachusetts | EMB-2021-BR-072-0002 | Project | Wayland - Snake Brook Dam Resiliency | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2021-BR-072-0003 | Project | Cities of Chelsea and Everett Island End Flood Resilience Project | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2021-BR-072-0004 | Project | Ipswich Town Wharf Sewer Pump Station Relocation Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2021-BR-072-0005 | Project | Salem, MA Sewer Pipe Relocation Project | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2021-BR-072-0008 | Project | Cohasset Microgrid 2022 | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2021-BR-072-0015 | Project | Marion - Creek Road Pump Station Resiliency Improvements | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2021-BR-072-0016 | Project | Gloucester - Haskell pond Dam Design Storm and Seismic Improvements | Not Selected | Not Selected for Further Review |
Michigan | EMC-2021-BR-063-0001 | Project | Clinton River Water Resources Recovery Facility Switchgear Resiliency Project | Not Selected | Did not meet HMA Requirements |
Michigan | EMC-2021-BR-063-0004 | Project | GLWA: Northwest Interceptor Diversion Tunnel | Not Selected | Did not meet HMA Requirements |
Michigan | EMC-2021-BR-063-0005 | Project | Building Resilient Infrastructure and Communities | Not Selected | Did not meet HMA Requirements |
Michigan | EMC-2021-BR-063-0010 | Project | Salem Township Southshore Tornado Safe room | Not Selected | Did not meet HMA Requirements |
Michigan | EMC-2021-BR-063-0011 | Project | Grosse Pointe Park Sanitary Sewer Project | Not Selected | Did not meet HMA Requirements |
Michigan | EMC-2021-BR-063-0008 | Project scoping | City of Hamtramck Phase 2 Sewer Relief | $243,765.00 | Identified for Further Review - Round 1 |
Michigan | EMC-2021-BR-063-0009 | Project scoping | Project Scoping for An Oakland County Community safe room Construction | $435,000.00 | Identified for Further Review - Round 1 |
Michigan | EMC-2021-BR-063-0014 | Management cost | Michigan Management Costs | $90,502.00 | Identified for Further Review - Round 1 |
Michigan | EMC-2021-BR-063-0002 | Project | Plainfield Charter Township Property Acquisitions | Not Selected | Not Selected for Further Review |
Michigan | EMC-2021-BR-063-0003 | Project | Wayne County Design and Install Permanent Standby Generators Pump Stations | Not Selected | Not Selected for Further Review |
Michigan | EMC-2021-BR-063-0006 | Project | Grosse Pointe Sewer Separation | Not Selected | Not Selected for Further Review |
Michigan | EMC-2021-BR-063-0007 | Project | Commercial District Storm Sewer Improvements | Not Selected | Not Selected for Further Review |
Michigan | EMC-2021-BR-063-0012 | Project | City of Hamtramck Phase 18 Sewer Relief | Not Selected | Not Selected for Further Review |
Michigan | EMC-2021-BR-063-0013 | Project | City of Southgate Combined Sewer Relief | Not Selected | Not Selected for Further Review |
Minnesota | EMC-2021-BR-010-0001 | Project | Mankato Area Public Schools Community Safe Room | Not Selected | Did not meet HMA Requirements |
Minnesota | EMC-2021-BR-010-0003 | Project | Red Rock Central School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Minnesota | EMC-2021-BR-010-0005 | Project | DuluthPhase 4 Shoreline Mitigation | Not Selected | Did not meet HMA Requirements |
Minnesota | EMC-2021-BR-010-0002 | Project | City of Saint Paul Virtual Inspections Project | $278,565.00 | Identified for Further Review - Round 1 |
Minnesota | EMC-2021-BR-010-0004 | Plan | 14 County Hazard Mitigation Plan Updates | $492,000.00 | Identified for Further Review - Round 1 |
Minnesota | EMC-2021-BR-010-0006 | Project scoping | Department of Natural Resources Project Scoping Lower Zumbro | $43,736.25 | Identified for Further Review - Round 1 |
Minnesota | EMC-2021-BR-010-0007 | Management cost | Minnesota Management Costs | $108,573.50 | Identified for Further Review - Round 1 |
Mississippi | EMA-2021-BR-156-0005 | Project | Pump Station 20 Improvement Project | Not Selected | Did not meet HMA Requirements |
Mississippi | EMA-2021-BR-156-0007 | Project | City of Nettleton Drainage | Not Selected | Did not meet HMA Requirements |
Mississippi | EMA-2021-BR-156-0003 | Project scoping | City of Biloxi Project Scoping for a New Cedar Lake Bridge | $531,538.99 | Identified for Further Review - Round 1 |
Mississippi | EMA-2021-BR-156-0004 | Project | Quitman County Capability-and Capacity Building | $94,543.20 | Identified for Further Review - Round 1 |
Mississippi | EMA-2021-BR-156-0006 | Project | Bolivar County Flood Mitigation Study | $187,500.00 | Identified for Further Review - Round 1 |
Mississippi | EMA-2021-BR-156-0008 | Management cost | Mississippi Management Cost | $106,376.67 | Identified for Further Review - Round 1 |
Mississippi | EMA-2021-BR-156-0001 | Project | City of Canton MLK South Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Mississippi | EMA-2021-BR-156-0002 | Project | Mill Creek Watershed Mitigation & Restoration | Not Selected | Not Selected for Further Review |
Missouri | EMK-2021-BR-037-0003 | Project scoping | State Allocation City of St. James Resilient Safe Room Shelter Project Scoping | $119,350.00 | Identified for Further Review - Round 1 |
Missouri | EMK-2021-BR-037-0004 | Management cost | Missouri Management Cost | $117,867.76 | Identified for Further Review - Round 1 |
Missouri | EMK-2021-BR-037-0006 | Project scoping | Project State Allocation – Project Scoping Jefferson County Warning Siren Acoustic Survey | $22,500.00 | Identified for Further Review - Round 1 |
Missouri | EMK-2021-BR-037-0007 | Project | State Allocation-Gasconade C-4 School District Safe Room | $768,150.00 | Identified for Further Review - Round 1 |
Missouri | EMK-2021-BR-037-0008 | Project scoping | State Allocation-Project Scoping for City of Seymour - Flood Mitigation | $90,000.00 | Identified for Further Review - Round 1 |
Missouri | EMK-2021-BR-037-0001 | Project | Fredericktown Seismic Retrofit Competitive Project | Not Selected | Not Selected for Further Review |
Missouri | EMK-2021-BR-037-0002 | Project | Competitive-City Utilities of Springfield-Blackman WTP Back-Up Power with Enclosure | Not Selected | Not Selected for Further Review |
Missouri | EMK-2021-BR-037-0005 | Project | City St Louis Backup Power Generators-Chain of Rocks/Howard Bend WTPs | Not Selected | Not Selected for Further Review |
Missouri | EMK-2021-BR-037-0009 | Project | City of Clarksville Floodwall | Not Selected | Not Selected for Further Review |
Missouri | EMK-2021-BR-037-0010 | Project | Excelsior Springs City Hospital Microgrid | Not Selected | Not Selected for Further Review |
Montana | EMD-2021-BR-001-0001 | Project | Lincoln County Resilient Infrastructure for Energy and Transportation Project | Not Selected | Did not meet HMA Requirements |
Montana | EMD-2021-BR-001-0002 | Project | University Of Montana Microgrid | Not Selected | Did not meet HMA Requirements |
Montana | EMD-2021-BR-001-0005 | Project | City of Billings: Adapting to Future Climate and Water Needs through Flood, and Drought Resilience | Not Selected | Did not meet HMA Requirements |
Montana | EMD-2021-BR-001-0003 | Project | Missoula County Rock Creek Fire Mitigation Project | $919,950.00 | Identified for Further Review - Round 1 |
Montana | EMD-2021-BR-001-0006 | Management cost | Montana Management Costs | $122,660.00 | Identified for Further Review - Round 1 |
Montana | EMD-2021-BR-001-0004 | Project | Three Forks Confluence Project: Mitigation for Affordability, Climate Resiliency & Economic Vitality | Not Selected | Not Selected for Further Review |
Nebraska | EMK-2021-BR-002-0001 | Project scoping | Salt Creek Flood Reduction Feasibility Study | $249,937.50 | Identified for Further Review - Round 1 |
Nebraska | EMK-2021-BR-002-0002 | Project scoping | Grant OPPD's Service Territory | $150,000.00 | Identified for Further Review - Round 1 |
Nebraska | EMK-2021-BR-002-0004 | Plan | Lower Elkhorn NRD/Cedar-Dixon Counties Multi-Jurisdictional Hazard Mitigation Plan Update | $199,984.37 | Identified for Further Review - Round 1 |
Nebraska | EMK-2021-BR-002-0006 | Project scoping | City of Hastings Flood Mitigation Project Scoping | $262,500.00 | Identified for Further Review - Round 1 |
Nebraska | EMK-2021-BR-002-0007 | Management cost | Nebraska Management Cost | $1,432,902.58 | Identified for Further Review - Round 1 |
Nebraska | EMK-2021-BR-002-0009 | Plan | Hazard Mitigation Plan Update | $75,000.00 | Identified for Further Review - Round 1 |
Nebraska | EMK-2021-BR-002-0005 | Project | Papio WP-4 Project | $5,335,650.00 | Identified for Further Review - Round 2 |
Nebraska | EMK-2021-BR-002-0003 | Project | St. Edward Beaver Creek Stabilization | Not Selected | Not Selected for Further Review |
Nebraska | EMK-2021-BR-002-0008 | Project | Falls City Electrical Distribution System Improvements | Not Selected | Not Selected for Further Review |
Nevada | EMF-2021-BR-016-0001 | Management cost | Nevada Management Costs | $66,666.67 | Identified for Further Review - Round 1 |
Nevada | EMF-2021-BR-016-0002 | Plan | Truckee Meadows Water Reclamation Facility Seismic Evaluation | $300,000.00 | Identified for Further Review - Round 1 |
Nevada | EMF-2021-BR-016-0003 | Plan | Disadvantaged Community Inventory - Planning-related Activity | $132,500.00 | Identified for Further Review - Round 1 |
Nevada | EMF-2021-BR-016-0004 | Plan | Washoe County Hazard Mitigation Plan Update | $67,500.00 | Identified for Further Review - Round 1 |
Nevada | EMF-2021-BR-016-0005 | Project | Hobart Creek Reservoir Dam Resilient Infrastructure Project | Not Selected | Not Selected for Further Review |
New Hampshire | EMB-2021-BR-075-0001 | Plan | Local Hazard Mitigation Plan Updates | $498,497.25 | Identified for Further Review - Round 1 |
New Hampshire | EMB-2021-BR-075-0002 | Management cost | New Hampshire Management Costs | $66,466.30 | Identified for Further Review - Round 1 |
New Jersey | EMN-2021-BR-058-0001 | Project | Wildwood Crest Boro: Bayside Resiliency Project | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0003 | Project | Neptune Township South Riverside Flood Pumps | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0005 | Project | Wildwood Bayside Resiliency Project | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0007 | Project | BCUA Flood Mitigation of Pink Street Pump Station | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0008 | Project | Woodbridge Township: Sanitary Pump Station Floodproofing | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0010 | Project | Stone Harbor Bayside Resiliency Project | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0014 | Project | Pacific Avenue Flood Mitigation Project | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0016 | Project | Jefferson Township: Three Rivers Bridge Stabilization and Restoration | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0018 | Plan | Bergen County Multi-jurisdictional Hazard Mitigation Plan | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0022 | Project | North Wildwood Bayside Resiliency Project | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0023 | Project | Reconstruction of Rochelle Park Sanitary Sewer Pump Station | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0027 | Project | Sea Isle City: 46th Street Pump Station Mitigation Project | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0028 | Project | Township of Stafford and OCUA - Erosion Control | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0031 | Project | Secaucus Huber Street Floodwall Project | Not Selected | Did not meet HMA Requirements |
New Jersey | EMN-2021-BR-058-0011 | Project | New Jersey Statewide Floodplain Administrator Training | $304,716.16 | Identified for Further Review - Round 1 |
New Jersey | EMN-2021-BR-058-0013 | Plan | Burlington County Hazard Mitigation Plan Update 2025 | $168,750.00 | Identified for Further Review - Round 1 |
New Jersey | EMN-2021-BR-058-0015 | Management cost | New Jersey Management Costs | $3,353,373.49 | Identified for Further Review - Round 1 |
New Jersey | EMN-2021-BR-058-0030 | Project scoping | Hoboken Project Scoping: Southwest Park Expansion | $100,000.00 | Identified for Further Review - Round 1 |
New Jersey | EMN-2021-BR-058-0032 | Plan | Morris County Hazard Mitigation Plan Update | $172,500.00 | Identified for Further Review - Round 1 |
New Jersey | EMN-2021-BR-058-0002 | Project | 63rd Street Pumping Station Power and Flood Resilience Project | $2,207,087.83 | Identified for Further Review - Round 2 |
New Jersey | EMN-2021-BR-058-0012 | Project | Newark Ironbound Resilience Hub | $10,576,121.83 | Identified for Further Review - Round 2 |
New Jersey | EMN-2021-BR-058-0019 | Project | BCUA Flood Mitigation of Joint Meeting Pump Station | $4,558,868.27 | Identified for Further Review - Round 2 |
New Jersey | EMN-2021-BR-058-0021 | Project | Cottage Street Park Flood Mitigation Project | $4,642,474.00 | Identified for Further Review - Round 2 |
New Jersey | EMN-2021-BR-058-0024 | Project | PANYNJ Elevation-Floodproofing of Building 111 Infrastructure Mitigation | $1,999,022.20 | Identified for Further Review - Round 2 |
New Jersey | EMN-2021-BR-058-0004 | Project | Atlantic City Baltic Canal Resiliency Project | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2021-BR-058-0006 | Project | Margate Amherst Avenue Resiliency Project | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2021-BR-058-0009 | Project | Jersey City McGovern Park Resilience Project | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2021-BR-058-0017 | Project | Freehold Township Water Treatment Plant Generator Project | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2021-BR-058-0020 | Project | ELSA Flood Mitigation of Fackler Road and Lower Ferry Pump Stations | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2021-BR-058-0025 | Project | Atlantic City Fire Station Emergency Generators | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2021-BR-058-0026 | Project | Township of Brick Roadway Elevation Project | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2021-BR-058-0029 | Project | Snug Harbor and North Street Stormwater Pump Stations | Not Selected | Not Selected for Further Review |
New Mexico | EMT-2021-BR-134-0004 | Project | Initial Early Warning System for Arroyo Flash Floods | Not Selected | Did not meet HMA Requirements |
New Mexico | EMT-2021-BR-132-0001 | Plan | Santa Clara Pueblo Hazard Mitigation Plan | $44,727.19 | Identified for Further Review - Round 1 |
New Mexico | EMT-2021-BR-134-0001 | Project scoping | Nightglow Avenue Area Flood Mitigation | $215,750.02 | Identified for Further Review - Round 1 |
New Mexico | EMT-2021-BR-134-0002 | Management cost | New Mexico Management Costs | $74,005.90 | Identified for Further Review - Round 1 |
New Mexico | EMT-2021-BR-134-0003 | Project scoping | Los Ranchos Levee Failure – Flood Mitigation Project Scoping | $348,104.45 | Identified for Further Review - Round 1 |
New Mexico | EMT-2021-BR-138-0001 | Project | Pueblo of Laguna Uniform Residential Building Code Development 2022 | $225,000.00 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0001 | Project scoping | NYS-OPRHP Dinsmore GC Communitywide Flood Protection | Not Selected | Did not meet HMA Requirements |
New York | EMN-2021-BR-069-0002 | Project | Nyack, Village - (Project) Nyack Creek Drainage Improvements | Not Selected | Did not meet HMA Requirements |
New York | EMN-2021-BR-069-0006 | Project scoping | NYS-OPRHP Dunham Reservoir Scoping for Decommissioning | Not Selected | Did not meet HMA Requirements |
New York | EMN-2021-BR-069-0010 | Project scoping | Asharoken (V) Seawall Structure Upgrade | Not Selected | Did not meet HMA Requirements |
New York | EMN-2021-BR-069-0011 | Project | NYCHA - (Project) St. Nicholas Houses | Not Selected | Did not meet HMA Requirements |
New York | EMN-2021-BR-060-0001 | Plan | BRIC Subapplication | $184,476.08 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0003 | Plan | Tree Mitigation Plan | $97,640.80 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0005 | Project | Port Dickinson (V) Sewage Pump Station Resiliency Project | $24,750.00 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0007 | Project scoping | NYCHA - (Scoping) Resilience Hubs | $256,000.00 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0013 | Project scoping | Village of Saltaire Scoping Project | $187,368.75 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0016 | Project scoping | NYCHA - (Scoping) Flood Protections for Highly Vulnerable Properties | $271,840.00 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0017 | Project scoping | Tompkins County - Scoping Human Services Building Energy Resilience | $23,650.45 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0018 | Plan | Planning for Resiliency: Keeping Piermont Viable in the Era of Climate Change | $75,000.00 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0019 | Management cost | New York Management Cost | $28,634,116.47 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0020 | Project scoping | Sea Cliff Village (Scoping) Waterfront Slope & Shoreline | $63,750.00 | Identified for Further Review - Round 1 |
New York | EMN-2021-BR-069-0008 | Project | NYCDEP - (Project) Clinton Houses/East Harlem Community Stormwater Resiliency | $8,358,867.35 | Identified for Further Review - Round 2 |
New York | EMN-2021-BR-069-0009 | Project | NYCHA - (Project) Breukelen Houses Stormwater Protection | $19,843,141.15 | Identified for Further Review - Round 2 |
New York | EMN-2021-BR-069-0012 | Project | NYCEDC - (Project) Seaport Coastal Resilience Project | $50,000,000.00 | Identified for Further Review - Round 2 |
New York | EMN-2021-BR-069-0021 | Project | NYCEDC - (Project) Hunts Point Food Security Mitigation Project | $14,682,301.72 | Identified for Further Review - Round 2 |
New York | EMN-2021-BR-060-0002 | Management cost | Saint Regis Mohawk Tribe Management Costs | $21,238.00 | Identified for Further Review |
New York | EMN-2021-BR-069-0004 | Project | Orange County - Cromline Creek Pump Station Flood Resilience Improvement Project | Not Selected | Not Selected for Further Review |
New York | EMN-2021-BR-069-0014 | Project | Greene County - (Project) Catskill Point Shoreline Stabilization | Not Selected | Not Selected for Further Review |
New York | EMN-2021-BR-069-0015 | Project | Monroe (T) Generator Project | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2021-BR-005-0003 | Project | City of Rocky Mount: Downtown Drainage Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0005 | Project | Cumberland County Flood Warning System Development | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0006 | Project | Upper Yadkin River Floodplain Resiliency Initiative for Jonesville | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0007 | Project | Wilson Mall Acquisition | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0009 | Project | Duffyfield Community Stormwater Enhancements - Infrastructure Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0011 | Project | Lenoir - Arrowood Street Bridge Replacement | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0013 | Project | Sewer system floodproofing and stream restoration | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0014 | Project | Selma Storm Water Resiliency Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0015 | Project | Oak-Island-Ocean Drive Drainage Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0016 | Project | Town of Kure Beach Stormwater Infiltration for 7 Sites | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0017 | Project | Surry County Flood Hazard Mitigation Project in the Yadkin Valley | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0018 | Project | Emergency Access Road | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0019 | Project | Sewer Force Main, Raw Water Intake, & Stream Bank Stabilization | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0025 | Project | Chadbourn Stormwater System Improvements for Flood Mitigation | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0026 | Project | Town of Benson Driving Branch Stream Restoration Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0028 | Project | Central Business-District Nature-Based Flood Mitigation | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0029 | Project | Wilkesboro Cub Creek Phase III | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0031 | Project | Resilient Utilities Infrastructure - Electric Substation Project - Infrastructure Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0033 | Project | Greenbriar Flood Mitigation and Stream Restoration | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0034 | Project | Town of Cape Carteret Flood Mitigation and Stormwater Resiliency Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0036 | Project | Town of Beech Mountain Water Supply Drought Mitigation Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0037 | Project | Taylorsville Flood Mitigation Improvements | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0039 | Project | Dare County - Roanoke Island Stormwater Infrastructure Improvements | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0040 | Project | Lenoir Resilient Wastewater Infrastructure Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0043 | Project | Rhodhiss - Floodplain Resilience Project Final | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0045 | Project | DEFD Sea Level Fire Station Relocation | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0049 | Project | Davie County/Yadkinville Waterline Interconnection | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0050 | Project | Newton Reservoir Retaining Wall Replacement Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0053 | Project | Town of Biscoe Wastewater Treatment Plant Gravity Sewer Outfall Replacement | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0055 | Project | Lansing Wastewater Treatment Plant Elevation Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0056 | Project | Pump Station Relocation Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0057 | Project | Town of Emerald Isle - Western Stormwater Mitigation Project | Not Selected | Did not meet HMA Requirements |
North Carolina | EMA-2021-BR-005-0001 | Plan | Town of Hertford Climate Risk Assessment | $130,000.00 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0010 | Project scoping | Watershed-based V/R assessment to scale up resilience building actions across jurisdictions | $202,800.00 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0020 | Management cost | North Carolina Management Costs | $7,108,616.70 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0035 | Project scoping | Spindale Aerial Crossing Repair | $199,999.80 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0038 | Plan | Rowland Stormwater Asset Inventory and Assessment Study | $200,000.00 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0047 | Project scoping | Town of Pembroke Stormwater Mitigation Project | $90,200.00 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0048 | Plan | City of Oxford Flood Vulnerbility & Risk Assessment Study | $105,000.00 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0042 | Plan | Conover - Community Resilience Plan | $70,000.00 | Identified for Further Review - Round 1 |
North Carolina | EMA-2021-BR-005-0004 | Project | Blood Run Pump Station Relocation and Sewer Line Replacement | $5,001,399.00 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0012 | Project | City of Gastonia Duharts Creek - Critical Infrastructure Protection and Stream Restoration | $5,979,200.00 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0022 | Project | Sawmills South Caldwell Sewer Pump Station Elevation Project | $189,000.00 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0024 | Project | City of Greenville St. Andrews Drive- Critical Infrastructure Protection and Stream Restoration | $3,445,106.00 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0027 | Project | Pollocksville Floodprint: Building Elevations to Restore the Town's Commercial Corridor | $1,083,811.36 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0032 | Project | Fair Bluff Park Phase 2 | $2,441,298.00 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0041 | Project | Town of Hillsborough NC - Resilient Regional Water Supply Project | $1,015,469.23 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0044 | Project | Water Supply Resiliency Project for SRU Pump Station Along Yadkin River | $22,496,850.00 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0046 | Project | Fayetteville, NC - Wayland Drive Drainage Improvements | $2,612,602.78 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0054 | Project | Town of Hillsborough River Pumping Station Relocation from Floodway | $5,805,546.35 | Identified for Further Review - Round 2 |
North Carolina | EMA-2021-BR-005-0002 | Project | Bay River Metropolitan Sewer District- Facultative Lagoon System Renovation and Capacity Upgrades | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2021-BR-005-0008 | Project | Wrightsville Goddard Interceptor | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2021-BR-005-0021 | Project | Black River Culvert Improvement Project | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2021-BR-005-0023 | Project | Elizabethtown Regional Sewer | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2021-BR-005-0030 | Project | Bledsoe Creek Interceptor Relocation Project | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2021-BR-005-0051 | Project | Jack’s Creek Pump Station Automated Screen Project | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2021-BR-005-0052 | Project | Jack’s Creek Drainage Improvement (Brown and 12th Streets) Project | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2021-BR-059-0006 | Project | City of Fargo Sewer System Mitigation Project - West Side Interceptor | Not Selected | Did not meet HMA Requirements |
North Dakota | EMD-2021-BR-059-0010 | Project | City of Lincoln Wastewater Pond System Regionalization | Not Selected | Did not meet HMA Requirements |
North Dakota | EMD-2021-BR-059-0001 | Management cost | North Dakota Management Costs | $94,742.08 | Identified for Further Review - Round 1 |
North Dakota | EMD-2021-BR-059-0002 | Plan | Stark County Comprehensive Plan Update | $105,525.00 | Identified for Further Review - Round 1 |
North Dakota | EMD-2021-BR-059-0004 | Project scoping | West Fargo Bank Stabilization Scoping | $75,000.00 | Identified for Further Review - Round 1 |
North Dakota | EMD-2021-BR-059-0008 | Project scoping | Grand Forks Sanitary Forcemain North End Reliever Scoping | $243,966.00 | Identified for Further Review - Round 1 |
North Dakota | EMD-2021-BR-059-0012 | Plan | North Dakota Enhanced Multi-Hazard Mitigation Plan Update | $286,074.60 | Identified for Further Review - Round 1 |
North Dakota | EMD-2021-BR-059-0003 | Project | City of Minot Puppy Dog Coulee Flood Resiliency Project | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2021-BR-059-0005 | Project | Lower Heart River Flood Risk Reduction Project - City of Mandan | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2021-BR-059-0007 | Project | Grand Forks County Emergency Access Mitigation Project - 62nd Avenue Bridge | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2021-BR-059-0009 | Project | City of Fessenden Wastewater Lagoon System Mitigation Project | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2021-BR-059-0011 | Project | Emmons County - Schwahn Lake High Water Outlet | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2021-BR-059-0013 | Project | Hay Creek Sewer System Mitigation Project - Building A Resilient Bismarck | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2021-BR-059-0014 | Project | Northwood Citywide Severe Storm Resiliency Project | Not Selected | Not Selected for Further Review |
Northern Mariana Islands | EMF-2021-BR-103-0001 | Project | Gapgap Road Resilience Project | Not Selected | Not Selected for Further Review |
Ohio | EMC-2021-BR-019-0002 | Project | City of Columbus Winter Weather Plow Driver Capability Improvement Project | Not Selected | Did not meet HMA Requirements |
Ohio | EMC-2021-BR-019-0001 | Plan | State of Ohio Hazard Mitigation Plan Update | $218,875.00 | Identified for Further Review - Round 1 |
Ohio | EMC-2021-BR-019-0003 | Management cost | Ohio Management Costs | $98,588.33 | Identified for Further Review - Round 1 |
Ohio | EMC-2021-BR-019-0004 | Project | Ohio Safe Room Rebate Program | $528,800.00 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-034-0001 | Management cost | Cheyenne & Arapaho Management Costs | Not Selected | Did not meet HMA Requirements |
Oklahoma | EMT-2021-BR-034-0002 | Project | Public Safety Project | Not Selected | Did not meet HMA Requirements |
Oklahoma | EMT-2021-BR-071-0005 | Project | City of Lawton – Lake Ellsworth Spillway Drought Resilience Project | Not Selected | Did not meet HMA Requirements |
Oklahoma | EMT-2021-BR-071-0007 | Project | Broadband Infrastructure | Not Selected | Did not meet HMA Requirements |
Oklahoma | EMT-2021-BR-135-0002 | Project | Choctaw Nation LIDAR Mapping Project | Not Selected | Did not meet HMA Requirements |
Oklahoma | EMT-2021-BR-139-0001 | Management cost | BRIC Project Management Costs | Not Selected | Did not meet HMA Requirements |
Oklahoma | EMT-2021-BR-139-0002 | Project | BRIC Project | Not Selected | Did not meet HMA Requirements |
Oklahoma | EMT-2021-BR-032-0001 | Project | Muscogee (Creek) Nation Residential Safe Room Program | $1,066,666.67 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-032-0002 | Management cost | Oklahoma Management Costs | $100,000.00 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-071-0001 | Project | SoonerSafe Phase 27 | $533,166.00 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-071-0002 | Project scoping | Oklahoma County Wilshire Rd. Resilient Infrastructure Scoping | $311,465.72 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-071-0003 | Management cost | State Management Costs | $2,742,015.85 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-071-0004 | Plan | City of Tulsa 2023 Hazard Mitigation Plan Update | $149,958.00 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-135-0001 | Project | Choctaw Nation Mitigation Voucher Project | $750,000.00 | Identified for Further Review - Round 1 |
Oklahoma | EMT-2021-BR-071-0006 | Project | Fulton Creek Drainage Basin Urban Flood and Heat Reduction Project | $19,578,851.87 | Identified for Further Review - Round 2 |
Oregon | EMS-2021-BR-028-0001 | Project | City of Hood River Elevated Sewer Upgrade | Not Selected | Did not meet HMA Requirements |
Oregon | EMS-2021-BR-028-0003 | Project | Mount Hood Corridor Resiliency Project | Not Selected | Did not meet HMA Requirements |
Oregon | EMS-2021-BR-028-0006 | Project | City of Grants Pass Water Treatment Plant Relocation and Water Intake Retrofit | Not Selected | Did not meet HMA Requirements |
Oregon | EMS-2021-BR-028-0002 | Management cost | Oregon Management Costs | $488,256.73 | Identified for Further Review - Round 1 |
Oregon | EMS-2021-BR-028-0004 | Project | Regner Reservoir Seismic Retrofit | $707,217.75 | Identified for Further Review - Round 1 |
Oregon | EMS-2021-BR-028-0007 | Plan | Oregon Hazard Mitigation Plan Update 2025 | $292,782.25 | Identified for Further Review - Round 1 |
Oregon | EMS-2021-BR-028-0005 | Project | Lane County - Alderwood Looped Power Transmission to Increase Reliability and Community Resilience | $2,704,178.25 | Identified for Further Review - Round 2 |
Pennsylvania | EMP-2021-BR-042-0001 | Project scoping | Project Scoping Penn State, Dauphin County, Floodplain Insurance Research | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0002 | Project scoping | Scoping Lancaster Lancaster Localized Flood Mitigation Planning | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0006 | Project scoping | Scoping Philadelphia Climate Change Adaptation – Facility Flood Risk and Resiliency Assessment | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0009 | Project scoping | Scoping Harrisburg Dauphin Paxton Creek Flood Mitigation | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0011 | Project | Thornbury Chester Gate System | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0012 | Project scoping | Scoping Pocono Farms Monroe Mitigation | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0013 | Project | Bethlehem Northampton Infrastructure Project - Easton Avenue Flood Mitigation | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0014 | Project scoping | Scoping West Newton Westmoreland Allison Street Storm / Drainage System Analysis | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0016 | Project | West Pittston Luzerne Levee System | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0018 | Project | Pine Grove Schuylkill 2021 Stormwater Project | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0019 | Project scoping | City of Lancaster, Lancaster County: AWWTP Outfall Expansion/Relocation Scoping Project | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0028 | Plan | Scoping Williamsport LYCOMING Levee Evaluation | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0030 | Project | Township of Upper Darby Stormwater Flood Mitigation | Not Selected | Did not meet HMA Requirements |
Pennsylvania | EMP-2021-BR-042-0005 | Project scoping | Scoping Jersey Shore, Lycoming Lawshee Run Engineering and Design | $258,129.00 | Identified for Further Review - Round 1 |
Pennsylvania | EMP-2021-BR-042-0008 | Project scoping | Project Scoping Middle Delaware River Basin Mitigation | $199,999.50 | Identified for Further Review - Round 1 |
Pennsylvania | EMP-2021-BR-042-0010 | Project scoping | 2021 Penn Lake Park/Dennison Luzerne Project Scoping Final Design | $307,500.00 | Identified for Further Review - Round 1 |
Pennsylvania | EMP-2021-BR-042-0015 | Project scoping | Scoping Phila Germantown Wingohocking Creek Flood Risk Reduction | $103,950.00 | Identified for Further Review - Round 1 |
Pennsylvania | EMP-2021-BR-042-0022 | Project scoping | Scoping Orwigsburg Schuylkill Flood Mitigation | $99,186.86 | Identified for Further Review - Round 1 |
Pennsylvania | EMP-2021-BR-042-0027 | Management cost | Pennsylvania Management Cost | $3,757,479.02 | Identified for Further Review - Round 1 |
Pennsylvania | EMP-2021-BR-042-0023 | Project | City of Philadelphia Cohocksink Flood Mitigation Project | $25,010,092.10 | Identified for Further Review - Round 2 |
Pennsylvania | EMP-2021-BR-042-0003 | Project | Shamokin Coal Northumberland Sewer Treatment Plant Mitigation | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0004 | Project | Manheim Lancaster Chiques Creek Flood Resiliency Project | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0007 | Project | Danville, Montour Mahoning Creek Restoration | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0017 | Project | Bridgeville Allegheny Flood Control | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0020 | Project | Hampton Township Allegheny County Water Pollution Control Facility Mitigation | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0021 | Project | Mayfield Lackawanna Levee Mitigation | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0024 | Project | Royalton Dauphin Water Street Pump Station Mitigation | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0025 | Project | RADNOR Delaware South Wayne Avenue Stormwater Management and Flood Reduction Project | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0026 | Project | Penn Lake Park/Dennison Luzerne Dam Mitigation | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0029 | Project | City of Lancaster, Lancaster Standby Generator for Wastewater Treatmennt Plant | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2021-BR-042-0031 | Project | Borough of Coraopolis, Allegheny County, Ohio River Levee Improvements Project | Not Selected | Not Selected for Further Review |
Puerto Rico | EMN-2021-BR-067-0001 | Project scoping | COR3 Capability and Capacity Building Activities | Not Selected | Did not meet HMA Requirements |
Puerto Rico | EMN-2021-BR-067-0002 | Management cost | COR3 Management Cost Subapplication | Not Selected | Not Selected for Further Review |
Rhode Island | EMB-2021-BR-014-0003 | Project | City of Warwick Critical Infrastructure Generators | Not Selected | Did not meet HMA Requirements |
Rhode Island | EMB-2021-BR-014-0005 | Plan | Foddering Farm Causeway Scoping Study | Not Selected | Did not meet HMA Requirements |
Rhode Island | EMB-2021-BR-014-0009 | Project | Building Resiliency in the Westerly Building Permit System | Not Selected | Did not meet HMA Requirements |
Rhode Island | EMB-2021-BR-014-0001 | Management cost | Rhode Island Management Costs | $26,698.00 | Identified for Further Review - Round 1 |
Rhode Island | EMB-2021-BR-014-0002 | Plan | 2023 Town of Westerly Hazard Mitigation Plan | $56,250.00 | Identified for Further Review - Round 1 |
Rhode Island | EMB-2021-BR-014-0004 | Plan | Hopkinton Hazard Mitigation Plan Update | $31,125.00 | Identified for Further Review - Round 1 |
Rhode Island | EMB-2021-BR-014-0006 | Plan | Providence Multi-Hazard Mitigation Plan Update | $46,485.00 | Identified for Further Review - Round 1 |
Rhode Island | EMB-2021-BR-014-0007 | Plan | Multi-Jurisdictional Pawtucket/Central Falls Hazard Mitigation Plan Update | $28,875.00 | Identified for Further Review - Round 1 |
Rhode Island | EMB-2021-BR-014-0008 | Plan | City of Warwick Hazard Mitigation Plan Update Active | $37,500.00 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0001 | Project | City of Charleston King Street Flood Pump Station Project | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0003 | Project | Peachtree Ground Storage and High Service Pump Station | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0007 | Project | Town of Hilton Head Island Wexford Stormwater Pump Station | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0009 | Project scoping | ReWa South Carolina, Critical Wastewater Lifeline, Energy Resilience Project Scoping | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0011 | Project | S. 1st Ave. at W. Hampton St. to N. 1st Ave. at W. Madison St. | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0012 | Project | Charleston Medical District Elevated Walkway | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0015 | Project | Conway WWTP Earthen Berm | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0016 | Project | Town of Hilton Head Island Jarvis Creek System Outfall | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0018 | Project scoping | ReWa South Carolina, Critical Wastewater Infrastructure, Resilience Project Scoping | Not Selected | Did not meet HMA Requirements |
South Carolina | EMA-2021-BR-158-0002 | Project scoping | Edisto Beach-Interior Lagoon Study | $80,000.00 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0005 | Plan | Town of Hilton Head Island Climate Adaptation Plan | $56,250.00 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0006 | Project scoping | Mauldin/Fountain Inn Multi-Jurisdictional Stormwater Master Plan | $375,000.00 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0008 | Project scoping | Analysis for the Upper Enoree River, Greenville County | $230,130.50 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0013 | Project | Mitigation Partnership Building Project | $104,119.50 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0014 | Plan | Sullivan's Island Coastal Community Resiliency Plan | $112,500.00 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0017 | Project scoping | Chattooga Lake Dam D1637 Project Scoping Mountain Rest NID ID SC00519 | $42,000.00 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0019 | Management cost | South Carolina Management Costs | $1,284,819.27 | Identified for Further Review - Round 1 |
South Carolina | EMA-2021-BR-158-0004 | Project | Chestnut Bay Resilience Project | $2,168,320.00 | Identified for Further Review - Round 2 |
South Carolina | EMA-2021-BR-158-0010 | Project | Old Village Drainage Improvement | $5,677,915.50 | Identified for Further Review - Round 2 |
South Dakota | EMD-2021-BR-061-0005 | Project | OAHE Electric Line - Grey Goose Rd | Not Selected | Did not meet HMA Requirements |
South Dakota | EMD-2021-BR-061-0016 | Project | Douglas Electric Line G | Not Selected | Did not meet HMA Requirements |
South Dakota | EMD-2021-BR-057-0001 | Plan | TERO Building Code Development & Enforcement Project: | $509,765.60 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0001 | Plan | Roberts County Pre-Disaster Mitigation Plan Update | $14,310.00 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0002 | Project | Douglas Electric Line I | $18,847.24 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0003 | Project | Central Electric Line 10 | $178,739.42 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0004 | Project scoping | Kimball Stormwater Drainage Study | $43,874.75 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0006 | Plan | Minnehaha-Lincoln Counties Joint Pre-Disaster Mitigation Plan Update | $22,500.00 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0007 | Plan | Miner County Pre-Disaster Mitigation Plan Update | $13,068.75 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0008 | Project | Central Electric Line 12/Aurora County | $138,472.87 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0009 | Plan | Pennington County Pre-Disaster Mitigation Plan Update | $52,500.00 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0011 | Project | Douglas Electric Line H | $98,475.48 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0012 | Plan | Harding County Pre-Disaster Mitigation Plan Update | $7,500.00 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0013 | Management cost | South Dakota Management Costs | $83,488.50 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0014 | Plan | Clark County Pre-Disaster Mitigation Plan Update | $14,625.00 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0015 | Plan | Clay County Pre-Disaster Mitigation Plan Update | $11,250.00 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0017 | Plan | Custer County Pre-Disaster Mitigation Plan Update | $12,000.00 | Identified for Further Review - Round 1 |
South Dakota | EMD-2021-BR-061-0010 | Project | Walworth County Resilient Systems Project | Not Selected | Not Selected for Further Review |
Tennessee | EMA-2021-BR-146-0001 | Plan | East Tennessee State University Hazard Mitigation Plan Update | $120,519.00 | Identified for Further Review - Round 1 |
Tennessee | EMA-2021-BR-146-0002 | Management cost | Tennessee Management Cost | $22,069.20 | Identified for Further Review - Round 1 |
Tennessee | EMA-2021-BR-146-0003 | Project scoping | Rutherford County Flood Mitigation Scoping Project | $45,000.00 | Identified for Further Review - Round 1 |
Tennessee | EMA-2021-BR-146-0004 | Project | EPB Chattanooga Community Network Conversion for Critical Infrastructure | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0001 | Project | Bayou Din Detention | Not Selected | Did not meet HMA Requirements |
Texas | EMT-2021-BR-005-0005 | Project scoping | Austin Energy Distribution System Load Shed Resiliency | $569,500.00 | Identified for Further Review - Round 1 |
Texas | EMT-2021-BR-005-0019 | Plan | Kenedy County's Sarita Drainage Master Plan | $228,000.00 | Identified for Further Review - Round 1 |
Texas | EMT-2021-BR-005-0020 | Project scoping | Tarrant Regional Water District Kennedale Balancing Reservoir Water Resilience Project Scoping | $202,500.00 | Identified for Further Review - Round 1 |
Texas | EMT-2021-BR-005-0028 | Management cost | Texas Management Costs | $148,157.00 | Identified for Further Review - Round 1 |
Texas | EMT-2021-BR-005-0002 | Project | City of Harlingen 5th and 7th Storm Sewer Improvement Project | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0003 | Project | DD6 Delaware Street Detention | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0004 | Project | Jefferson County DD6 Channel 100A | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0006 | Project | Chimneystone Drainage Improvements Phase 2 | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0007 | Project | City of Richardson BRIC Generator Project | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0008 | Project | CCDD5 N. Main Drain Improvements at BUS 77 | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0009 | Project | City of Rowlett Sewer Lift Station Backup Generators Project | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0010 | Project | DD6 Borley Heights Relief | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0011 | Project | City of Victoria Aquifer Storage and Recovery (ASR) Injection Well Project | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0012 | Project | Weatherford Water/Wastewater Portable Pump Station Generator | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0013 | Project | Oyster Creek Diversion Channel | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0014 | Project | Galveston National Laboratory and Keiller/Robert E. Shope Laboratory Flood Mitigation | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0015 | Project | DD6 Fannin Street Diversion | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0016 | Project | DD6 Virginia Street Detention | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0017 | Project | Sawdust Bridge Road and Elevation | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0018 | Project | Roman Forest Blvd Bridge and Elevation | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0021 | Project | City of Southside Place Auden Street Drainage Improvement Project | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0022 | Project | City of Graham Water Plant Generator | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0023 | Project | Basic Science Building & Medical Research Building Flood Mitigation | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0024 | Project | Town of Combes-Nixon Rd Drainage | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0025 | Project | Brazos Landing/Avalon Drainage Improvements | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0026 | Project | Hopkins County Dual Use Tornado Safe room | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0027 | Project | Repetitive Loss Property Acquisition Projects in Dallas, Texas (Various Locations) | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0029 | Project | City of Port Arthur - Generators to Critical Facilities | Not Selected | Not Selected for Further Review |
Texas | EMT-2021-BR-005-0030 | Project | South Post Oak Detention Basin C547-00-00 & Channel Improvement C147-00-00 Harris County | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0019 | Project | Logan Service Center Seismic Retrofit | Not Selected | Did not meet HMA Requirements |
Utah | EMD-2021-BR-063-0021 | Project | Neffs Canyon Debris Basin Project | Not Selected | Did not meet HMA Requirements |
Utah | EMD-2021-BR-063-0005 | Project scoping | Beaver City Storm Water Drainage Study Project Scoping | $110,467.90 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0007 | Project scoping | Beaver County Beaver River Project Scoping | $40,500.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0009 | Plan | Region 5 Mitigation Plan Update | $56,250.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0012 | Project scoping | Sevier County Gooseberry Landslide Project Scoping Study | $152,250.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0013 | Project scoping | Jordan River Canal Project Scoping | $333,600.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0014 | Project scoping | Grantsville City Project Scoping | $41,100.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0017 | Project scoping | Escalante City Flood Project Scoping | $41,715.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0018 | Project scoping | Richfield City Storm Water Drainage Study Project Scoping | $108,750.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0023 | Project scoping | Salt Lake Community College Project Scoping South City Campus | $92,867.10 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0024 | Project scoping | Grand County Pack Creek Project Scoping | $22,500.00 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0025 | Management cost | Utah Management Costs | $18,869,529.21 | Identified for Further Review - Round 1 |
Utah | EMD-2021-BR-063-0001 | Project | Long Term Sustainability for Provo’s Water Supply | $50,000,000.00 | Identified for Further Review - Round 2 |
Utah | EMD-2021-BR-063-0004 | Project | Avoiding Faults: Geohazards and Water Resilience through Parallel Pipeline in Northern Utah | $21,586,182.00 | Identified for Further Review - Round 2 |
Utah | EMD-2021-BR-063-0016 | Project | Salt Lake City Creek Water Treatment Plant Resilient Water Quality & Supply | $36,680,000.00 | Identified for Further Review - Round 2 |
Utah | EMD-2021-BR-063-0002 | Project | Springdale Virgin River Streambank Protection | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0003 | Project | Salt Lake City Schools Community Microgrid Resiliency Project | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0006 | Project | Granite Schools Seismic Retrofit Project | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0008 | Project | Perry City Well #3 and Well #4 Generators Project | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0010 | Project | WBWCD Emergency Generators for Culinary Water Wells | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0011 | Project | Morgan City Hall / Well Generators | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0015 | Project | JVWTP Sedimentation Basins Earthquake, Drought, and Wildfire Resilience Upgrades | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0020 | Project | Kane County Joe Creek Culvert Replacement Project | Not Selected | Not Selected for Further Review |
Utah | EMD-2021-BR-063-0022 | Project | Ensuring Water Delivery from Treatment Plant in South Ogden for WBWCD | Not Selected | Not Selected for Further Review |
Vermont | EMB-2021-BR-007-0001 | Project scoping | Calais Kent Hill Road Culvert Scoping Study | $31,936.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0002 | Project scoping | Stowe Electric System Resiliency Scoping Project | $30,000.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0003 | Project scoping | Brandon North Street Bridge Project Scoping | $80,000.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0004 | Plan | Local Hazard Mitigation Plan Development 2021 | $299,325.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0005 | Project scoping | Lyndon Flood Reduction Scoping | $60,000.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0006 | Project scoping | Bethel Gilead Brook Road Project Scoping | $73,625.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0007 | Project scoping | Moscow Road Flood Resiliency Project Scoping | $27,648.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0008 | Project scoping | Boulder Wood Stabilization Project Scoping in Bolton | $19,680.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0009 | Project scoping | Roxbury Project Scoping Crossings over Sunny Brook | $98,176.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0010 | Project scoping | Brookfield Halfway Brook Culvert Project Scoping | $81,746.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0011 | Project scoping | Roxbury Project Scoping - Premo Road Bridge over Dog River | $48,888.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0012 | Project scoping | Town of Poultney Rail Trail Bridge | $48,000.00 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0013 | Management cost | Vermont Management Costs | $126,491.71 | Identified for Further Review - Round 1 |
Vermont | EMB-2021-BR-007-0014 | Project scoping | Scoping Study - North Hollow Rd and Bryant Rd over Gold Brook | $71,592.80 | Identified for Further Review - Round 1 |
Virgin Islands | EMN-2021-BR-070-0002 | Plan | Capacity and Stakeholder Assessment for USVI Resilience Hubs | Not Selected | Did not meet HMA Requirements |
Virgin Islands | EMN-2021-BR-070-0001 | Management cost | Virgin Islands Management Cost | $50,000.00 | Identified for Further Review - Round 1 |
Virgin Islands | EMN-2021-BR-070-0003 | Plan | Federally Funded Generators Management Plan | $450,000.00 | Identified for Further Review - Round 1 |
Virginia | EMP-2021-BR-051-0001 | Project | SWCD Dam Rehabilitation G2 - Leatherwood Creek #2A, Leatherwood Creek #3, Leatherwood Creek #5 | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0002 | Project | Critical Public Structure Generators | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0004 | Project | SWCD Dam Rehabilitation G1 - Johns Creek 1 and 2, South River 19 | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0005 | Project | SWCD Dam Rehabilitation G3 - Buffalo Creek #4, Bush River #4B, Roanoke Creek #68 | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0008 | Project | Waterfront Implementation Project | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0009 | Project | Greene/Stanardsville - Water Supply Protection | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0012 | Project | Communication Infrastructure Upgrades | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0014 | Project | Brooke Road Flood Mitigation and Resiliency Project | Not Selected | Did not meet HMA Requirements |
Virginia | EMP-2021-BR-051-0003 | Project scoping | Private Sector Engagement and Partnership | $41,250.00 | Identified for Further Review - Round 1 |
Virginia | EMP-2021-BR-051-0007 | Project scoping | All Hazards Consortium - Energy Project Scoping | $578,748.00 | Identified for Further Review - Round 1 |
Virginia | EMP-2021-BR-051-0015 | Project scoping | Henrico County - Water Reclamation Facility Flow Equalization Study | $380,000.00 | Identified for Further Review - Round 1 |
Virginia | EMP-2021-BR-051-0016 | Management cost | Virginia Management Costs | $3,774,418.40 | Identified for Further Review - Round 1 |
Virginia | EMP-2021-BR-051-0010 | Project | Eastern Shore Drive Drainage Improvement Project | $25,144,014.00 | Identified for Further Review - Round 2 |
Virginia | EMP-2021-BR-051-0006 | Project | Henrico County Gambles Mill Pump Station Water and Sewer Protective Measures | Not Selected | Not Selected for Further Review |
Virginia | EMP-2021-BR-051-0011 | Project | Craig County Emergency Communication System Upgrade | Not Selected | Not Selected for Further Review |
Virginia | EMP-2021-BR-051-0013 | Project | Franklin County Emergency Communications System | Not Selected | Not Selected for Further Review |
Washington | EMS-2021-BR-044-0001 | Project | Building Climate Resilience in Clallam County, WA: the Dungeness Off-Channel Reservoir | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-044-0002 | Plan | Clallam County Energy Resilience Planning Scoping Project | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-083-0001 | Management cost | Shoalwater Bay Indian Tribe Management Costs | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-083-0002 | Project scoping | Shoalwater Bay Indian Tribe's Building Inventory Analysis | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-083-0003 | Project | Shoalwater Bay Indian Tribe's Communications Project | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-083-0004 | Project scoping | Shoalwater Bay Indian Tribe's Water Resiliency Analysis Project | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-084-0001 | Plan | Queets Relocation Phase 1 Engineering | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-093-0001 | Plan | Planning | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-093-0002 | Project scoping | Project Scoping Wildfire | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-093-0005 | Project scoping | Project Scoping Multiple Natural Hazards | Not Selected | Did not meet HMA Requirements |
Washington | EMS-2021-BR-044-0006 | Project scoping | Walla Walla Municipal Watershed Resiliency Plan | $375,000.00 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-044-0010 | Project scoping | Seattle Lower Duwamish Valley Sea Level Rise Mitigation Project Scoping | $400,000.00 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-044-0012 | Management cost | Washington State Management Costs Sub-Application | $9,443,153.45 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-048-0001 | Management cost | Management Costs | $66,500.00 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-048-0002 | Plan | Natural Hazards Mitigation Plan Update | $243,000.00 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-048-0003 | Project scoping | Stormwater Flooding Study | $238,500.00 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-048-0004 | Project scoping | Sanitary Sewer Seismic Retrofit Scoping | $117,000.00 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-089-0001 | Project scoping | Development of a Project Scoping Framework for Hazard Mitigation Plans | $977,014.00 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-093-0003 | Project scoping | Code Update | $112,586.40 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-093-0004 | Management cost | Management Cost | $12,509.60 | Identified for Further Review - Round 1 |
Washington | EMS-2021-BR-044-0003 | Project | North 175th Street Soil Stabilization Project | $8,869,500.00 | Identified for Further Review - Round 2 |
Washington | EMS-2021-BR-044-0004 | Project | 2021 Relocate Wells & WTP, Complete intertie for Emergency Water | $2,166,295.50 | Identified for Further Review - Round 2 |
Washington | EMS-2021-BR-044-0008 | Project | North Shore Levee | $50,000,000.00 | Identified for Further Review - Round 2 |
Washington | EMS-2021-BR-044-0009 | Project | City of Auburn Reservoir 2 Seismic Control Valve project | $1,087,500.00 | Identified for Further Review - Round 2 |
Washington | EMS-2021-BR-044-0011 | Project | City of Seattle Good Shepherd Center South Annex Seismic Retrofit | $380,517.58 | Identified for Further Review - Round 2 |
Washington | EMS-2021-BR-044-0005 | Project | Ocean Shores Seismic Retrofit Water Storage | Not Selected | Not Selected for Further Review |
Washington | EMS-2021-BR-044-0007 | Project | Covington Water District Tank 4 Replacement Project in Auburn | Not Selected | Not Selected for Further Review |
West Virginia | EMP-2021-BR-056-0002 | Management cost | Management Costs | $34,337.66 | Identified for Further Review - Round 1 |
West Virginia | EMP-2021-BR-056-0003 | Project scoping | US Route 11 & CR 12 Flood Mitigation Study | $202,500.00 | Identified for Further Review - Round 1 |
West Virginia | EMP-2021-BR-056-0001 | Plan | Building Resilient Infrastructures and Communities and Flood Mitigation Assistance | $90,190.35 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0001 | Project | Hayward Community School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0003 | Project | Hillsboro School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0004 | Project | Grantsburg School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0005 | Project | Cuba City School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0006 | Project | Royall School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0008 | Project | Potosi School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0010 | Project | 2022 1st Avenue Revetment Reconstruction | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0015 | Project | Barron Area School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0016 | Project | Ladysmith School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0017 | Project | Medford School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0021 | Project | Platteville School District Community Safe Room Project | Not Selected | Did not meet HMA Requirements |
Wisconsin | EMC-2021-BR-064-0007 | Project | Radisson Community Safe Room | $571,937.57 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0009 | Plan | Vilas County All Hazards Mitigation Plan Update | $31,500.00 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0011 | Plan | Vernon County Mitigation Plan Update | $44,811.90 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0012 | Plan | Ashland County Hazard Mitigation Plan Update | $29,295.00 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0013 | Plan | Crawford County Mitigation Plan Update | $44,990.70 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0014 | Management cost | Wisconsin Management Costs | $956,642.29 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0018 | Plan | WEM State Planning/Outreach Grant | $92,788.21 | Identified for Further Review - Round 1 |
Wisconsin | EMC-2021-BR-064-0019 | Project | Pheasant Branch Tributary Greenway Enhancement Project: City of Madison | $6,028,190.00 | Identified for Further Review - Round 2 |
Wisconsin | EMC-2021-BR-064-0002 | Project | Lake Halle BRIC Safe Room Project | Not Selected | Not Selected for Further Review |
Wisconsin | EMC-2021-BR-064-0020 | Project | Kemper Center Shoreline Mitigation Project | Not Selected | Not Selected for Further Review |
Wyoming | EMD-2021-BR-047-0003 | Project | Generator | Not Selected | Did not meet HMA Requirements |
Wyoming | EMD-2021-BR-047-0001 | Project scoping | Scoping/Design for Crow Creek 19th Street Crossing Improvement | $180,000.00 | Identified for Further Review - Round 1 |
Wyoming | EMD-2021-BR-047-0002 | Project scoping | Scoping/Design for Clear Creek Detention Storage | $262,500.00 | Identified for Further Review - Round 1 |
Wyoming | EMD-2021-BR-047-0004 | Project scoping | Green River Diversion Dam & Killdeer Wetland Improvements/Project Scoping | $75,000.00 | Identified for Further Review - Round 1 |
Wyoming | EMD-2021-BR-047-0006 | Project scoping | Donkey Creek Master Drainage Plan | $187,500.00 | Identified for Further Review - Round 1 |
Wyoming | EMD-2021-BR-047-0007 | Management cost | Wyoming Office of Homeland Security - Management Costs | $392,698.50 | Identified for Further Review - Round 1 |
Wyoming | EMD-2021-BR-047-0005 | Project | 2021 Lander Flooding: Structure Relocation and Property Acquisition | $2,090,889.00 | Identified for Further Review - Round 2 |